Skip to main content
Top

2024 | OriginalPaper | Chapter

Comparison of Different Production Systems Approaches of a Manufacturing Line in the Aeronautical Sector

Authors : Carmen de Vilanova Diego, Miguel Ortega-Mier, Tamara Borreguero, Álvaro García-Sánchez, Carlos García-Castellano Gerbolés

Published in: Advances in Manufacturing IV

Publisher: Springer Nature Switzerland

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In the recent years, flexibility has become more important within our industrial systems. This yields to more complex decision making during this industrial system’s design. In this work, we present a method to support this decision making by presenting a set of indicators that enable the quantitative comparison of a set of industrial system designs for a pulse line, based on the number of stations selected. To achieve this, two well-known problems in process optimization have been utilized jointly: the Simple Assembly Line Balancing Problem and the Resource Constrained Project Scheduling Problem. A preliminary study was conducted on an exemplary production line from the aeronautical industry. Subsequently, we progressed to develop valuable insights encompassing both problems. To achieve this, two metrics were introduced: lead time and the number of hours worked. These metrics facilitated the generation of data illustrating how the number of hours worked varies with cycle time, lead time, and the number of stations. The outcome is a set of indicators and graphs that provides more precise and well-founded information, helping in the decision making of which approach is more suitable based on the specific needs and constraints of each project.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Roussel, S., Polacsek, T., Chan, A.: Assembly line preliminary design optimization for an aircraft. In: The 29th International Conference on Principles and Practice of Constraint Programming, CP 2023 (2023) Roussel, S., Polacsek, T., Chan, A.: Assembly line preliminary design optimization for an aircraft. In: The 29th International Conference on Principles and Practice of Constraint Programming, CP 2023 (2023)
2.
go back to reference Zhang, W., Dai, Y., Tian, L.: Impact of capacity flexibility on service product line design. Ann. Oper. Res. 312(2), 1095–1118 (2022)CrossRef Zhang, W., Dai, Y., Tian, L.: Impact of capacity flexibility on service product line design. Ann. Oper. Res. 312(2), 1095–1118 (2022)CrossRef
3.
go back to reference Müller, J. J. E. C.: Enabling technologies for Industry 5.0. European Commission, 8-10. (2020) Müller, J. J. E. C.: Enabling technologies for Industry 5.0. European Commission, 8-10. (2020)
4.
go back to reference Neufeld, J.S., Schulz, S., Buscher, U.: A systematic review of multi-objective hybrid flow shop scheduling. Eur. J. Oper. Res. 309(1), 1–23 (2023)MathSciNetCrossRef Neufeld, J.S., Schulz, S., Buscher, U.: A systematic review of multi-objective hybrid flow shop scheduling. Eur. J. Oper. Res. 309(1), 1–23 (2023)MathSciNetCrossRef
5.
go back to reference Monga, R., Khurana, V.: Facility layout planning: a review. Int. J. Innov. Res. Sci. Eng. Technol, 4(03), 976–980 (2015) Monga, R., Khurana, V.: Facility layout planning: a review. Int. J. Innov. Res. Sci. Eng. Technol, 4(03), 976–980 (2015)
6.
go back to reference Jusop, M., Ab Rasid, M.: A review on simple assembly line balancing type-e problem. IOP Conf. Ser. Mater. Sci. Eng. 100, 012005 (2015) Jusop, M., Ab Rasid, M.: A review on simple assembly line balancing type-e problem. IOP Conf. Ser. Mater. Sci. Eng. 100, 012005 (2015)
7.
go back to reference Scholl, A., Fliedner, M., Boysen, M.: ABSALOM: balancing assembly lines with assignment restrictions. Eur. J. Oper. Res. 200(3), 688–701 (2010)CrossRef Scholl, A., Fliedner, M., Boysen, M.: ABSALOM: balancing assembly lines with assignment restrictions. Eur. J. Oper. Res. 200(3), 688–701 (2010)CrossRef
8.
go back to reference Uddin, M. K., Lastra, J. L. M. Assembly line balancing and sequencing. In: Assembly Line–Theory and Practice, pp. 13–36 (2011) Uddin, M. K., Lastra, J. L. M. Assembly line balancing and sequencing. In: Assembly Line–Theory and Practice, pp. 13–36 (2011)
9.
go back to reference Liu, S.B., Ng, K.M., Ong, H.L.: Branch-and-bound algorithms for simple assembly line balancing problem. Int. J. Adv. Manuf. Technol. 36(1), 169–177 (2008)CrossRef Liu, S.B., Ng, K.M., Ong, H.L.: Branch-and-bound algorithms for simple assembly line balancing problem. Int. J. Adv. Manuf. Technol. 36(1), 169–177 (2008)CrossRef
10.
go back to reference Walter, R., Schulze, P., Scholl, A.: SALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing. Eur. J. Oper. Res. 295(3), 857–873 (2021)MathSciNetCrossRef Walter, R., Schulze, P., Scholl, A.: SALSA: combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing. Eur. J. Oper. Res. 295(3), 857–873 (2021)MathSciNetCrossRef
11.
go back to reference Ritt, M., Costa, A.M.: Improved integer programming models for simple assembly line balancing and related problems. Int. Trans. Oper. Res. 25, 1345–1359 (2018)MathSciNetCrossRef Ritt, M., Costa, A.M.: Improved integer programming models for simple assembly line balancing and related problems. Int. Trans. Oper. Res. 25, 1345–1359 (2018)MathSciNetCrossRef
12.
go back to reference Stall Sikora, C.S., Lopes, T.C., Lopes, H.S., Magatão, L.: Genetic algorithm for type-2 assembly line balancing. In: 2015 Latin America Congress on Computational Intelligence (LA-CCI), Curitiba, Brazil, pp. 1–6 (2015) Stall Sikora, C.S., Lopes, T.C., Lopes, H.S., Magatão, L.: Genetic algorithm for type-2 assembly line balancing. In: 2015 Latin America Congress on Computational Intelligence (LA-CCI), Curitiba, Brazil, pp. 1–6 (2015)
14.
15.
go back to reference Sulaiman, M.N.I., Choo, Y-H., Chong, K.E.: Ant colony optimization with look forward ant in solving assembly line balancing problem. In: 3rd Conference on Data Mining and Optimization (DMO), Putrajaya, Malaysia, pp. 115–121 (2011) Sulaiman, M.N.I., Choo, Y-H., Chong, K.E.: Ant colony optimization with look forward ant in solving assembly line balancing problem. In: 3rd Conference on Data Mining and Optimization (DMO), Putrajaya, Malaysia, pp. 115–121 (2011)
16.
go back to reference Habibi, F., Barzinpour, F., Sadjadi, S.J.: Resource-constrained project scheduling problem: review of past and recent developments. J. Project Manage. 3, 55–88 (2018)CrossRef Habibi, F., Barzinpour, F., Sadjadi, S.J.: Resource-constrained project scheduling problem: review of past and recent developments. J. Project Manage. 3, 55–88 (2018)CrossRef
17.
go back to reference Kolisch, K.: Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Manag. 14(3), 179–192 (1996)CrossRef Kolisch, K.: Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Manag. 14(3), 179–192 (1996)CrossRef
18.
go back to reference Tavares, L.V.: Multicriteria scheduling of a railway renewal program. Eur. J. Oper. Res. 25(3), 395–405 (1986)CrossRef Tavares, L.V.: Multicriteria scheduling of a railway renewal program. Eur. J. Oper. Res. 25(3), 395–405 (1986)CrossRef
19.
go back to reference Patterson, J.H., Huber, W.D.: A horizon-varying, zero-one approach to project scheduling. Manage. Sci. 20(6), 990–998 (1974)CrossRef Patterson, J.H., Huber, W.D.: A horizon-varying, zero-one approach to project scheduling. Manage. Sci. 20(6), 990–998 (1974)CrossRef
20.
go back to reference Stinson, J.P., Davis, E.W., Khumawala, B.M.: Multiple resource-constrained scheduling using branch and bound. AIIE Trans. 10(3), 252–259 (1978)CrossRef Stinson, J.P., Davis, E.W., Khumawala, B.M.: Multiple resource-constrained scheduling using branch and bound. AIIE Trans. 10(3), 252–259 (1978)CrossRef
21.
go back to reference Doersch, R.H., Patterson, J.H.: Scheduling a project to maximize its present value: a zero-one programming approach. Manage. Sci. 23(8), 882–889 (1977)CrossRef Doersch, R.H., Patterson, J.H.: Scheduling a project to maximize its present value: a zero-one programming approach. Manage. Sci. 23(8), 882–889 (1977)CrossRef
22.
go back to reference Kastor, A., Sirakoulis, K.: The effectiveness of resource levelling tools for resource constraint project scheduling problem. Int. J. Project Manage. 27(5), 493–500 (2009)CrossRef Kastor, A., Sirakoulis, K.: The effectiveness of resource levelling tools for resource constraint project scheduling problem. Int. J. Project Manage. 27(5), 493–500 (2009)CrossRef
23.
go back to reference Álvarez-Valdés Olaguibel, R., Tamarit Goerlich, J.M.: Heuristic algorithms for resource-constrained project scheduling: a review and an empirical analysis. In: Advances in Project Scheduling, Elsevier (1989) Álvarez-Valdés Olaguibel, R., Tamarit Goerlich, J.M.: Heuristic algorithms for resource-constrained project scheduling: a review and an empirical analysis. In: Advances in Project Scheduling, Elsevier (1989)
24.
go back to reference Balas, E.: Machine sequencing via disjunctive graphs: an implicit enumeration algorithm. Oper. Res. 17(6), 941–957 (1969)MathSciNetCrossRef Balas, E.: Machine sequencing via disjunctive graphs: an implicit enumeration algorithm. Oper. Res. 17(6), 941–957 (1969)MathSciNetCrossRef
25.
go back to reference Borreguero Sanchidrián, T., Portoleau, T., Artigues, C., García-Sánchez, A., Ortega-Mier, M., Lopez, P.: Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective. Ann. Oper. Res. (2023). https://doi.org/10.1007/s10479-023-05629-3 Borreguero Sanchidrián, T., Portoleau, T., Artigues, C., García-Sánchez, A., Ortega-Mier, M., Lopez, P.: Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective. Ann. Oper. Res. (2023). https://​doi.​org/​10.​1007/​s10479-023-05629-3
26.
go back to reference Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley Longman Publishing Co., Inc. (1989) Goldberg, D.E.: Genetic Algorithms in Search, Optimization and Machine Learning. Addison-Wesley Longman Publishing Co., Inc. (1989)
27.
go back to reference El Ahmadi, S.E.A., El Abbadi, L., Elrhanimi, S.: Efficiency improvement of automotive assembly lines using simple assembly line balancing problem type-E. Logforum 19(2), 183–193 (2023) El Ahmadi, S.E.A., El Abbadi, L., Elrhanimi, S.: Efficiency improvement of automotive assembly lines using simple assembly line balancing problem type-E. Logforum 19(2), 183–193 (2023)
28.
go back to reference Sprecher, A.: A competitive branch-and-bound algorithm for the simple assembly line balancing problem. Int. J. Prod. Res. 37(8), 1787–1816 (1999) Sprecher, A.: A competitive branch-and-bound algorithm for the simple assembly line balancing problem. Int. J. Prod. Res. 37(8), 1787–1816 (1999)
29.
go back to reference Zhao, R., et al.: Digital twins-based production line design and simulation optimization of large-scale mobile phone assembly workshop. Machines 10, 367 (2022)CrossRef Zhao, R., et al.: Digital twins-based production line design and simulation optimization of large-scale mobile phone assembly workshop. Machines 10, 367 (2022)CrossRef
Metadata
Title
Comparison of Different Production Systems Approaches of a Manufacturing Line in the Aeronautical Sector
Authors
Carmen de Vilanova Diego
Miguel Ortega-Mier
Tamara Borreguero
Álvaro García-Sánchez
Carlos García-Castellano Gerbolés
Copyright Year
2024
DOI
https://doi.org/10.1007/978-3-031-56444-4_20

Premium Partner