Skip to main content
Erschienen in: Journal of Scheduling 3/2015

01.06.2015

A cyclical search for the two machine flow shop and open shop to minimise finishing time

verfasst von: Alan J. Soper

Erschienen in: Journal of Scheduling | Ausgabe 3/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper considers scheduling problems on two machines to minimise the makespan. It shows that a simple cyclical search can find a flow shop schedule with one job omitted with makespan less than or equal to the maximum of the total processing time of all jobs on either machine. This flow shop schedule is used as the basis for constructing a number of schedules with minimum makespan for the two machine open shop. The search may be applied unchanged to batches of jobs to provide more optimal schedules.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat de Werra, D. (1989). Graph-theoretical models for preemptive scheduling. In R. Slowinski & J. Weglarz (Eds.), Advances in project scheduling (pp. 171–185). Amsterdam: Elsevier. de Werra, D. (1989). Graph-theoretical models for preemptive scheduling. In R. Slowinski & J. Weglarz (Eds.), Advances in project scheduling (pp. 171–185). Amsterdam: Elsevier.
Zurück zum Zitat Gonzalez, T., & Sahni, S. (1976). Open shop scheduling to minimize finish time. J Assoc Comput Mach, 23, 665–679. Gonzalez, T., & Sahni, S. (1976). Open shop scheduling to minimize finish time. J Assoc Comput Mach, 23, 665–679.
Zurück zum Zitat Gribkovskaia, I. V., Lee, C.-Y., Strusevich, V. A., & de Werra, D. (2006). Three is easy, two is hard: open shop sum-batch scheduling problem refined. Oper Res Lett, 34, 459–464. Gribkovskaia, I. V., Lee, C.-Y., Strusevich, V. A., & de Werra, D. (2006). Three is easy, two is hard: open shop sum-batch scheduling problem refined. Oper Res Lett, 34, 459–464.
Zurück zum Zitat Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Res Logist Quart, 1, 61–68.CrossRef Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Res Logist Quart, 1, 61–68.CrossRef
Zurück zum Zitat Pinedo, M., & Schrage, L. (1982). Stochastic shop scheduling a survey. In M. A. H. Dempster, E. L. Lawler, J. K. Lenstra, & A. H. G. Rinnooy Kan (Eds.), Deterministic and stochastic scheduling (pp. 181–196). Dordrecht: Riedel.CrossRef Pinedo, M., & Schrage, L. (1982). Stochastic shop scheduling a survey. In M. A. H. Dempster, E. L. Lawler, J. K. Lenstra, & A. H. G. Rinnooy Kan (Eds.), Deterministic and stochastic scheduling (pp. 181–196). Dordrecht: Riedel.CrossRef
Metadaten
Titel
A cyclical search for the two machine flow shop and open shop to minimise finishing time
verfasst von
Alan J. Soper
Publikationsdatum
01.06.2015
Verlag
Springer US
Erschienen in
Journal of Scheduling / Ausgabe 3/2015
Print ISSN: 1094-6136
Elektronische ISSN: 1099-1425
DOI
https://doi.org/10.1007/s10951-013-0356-7

Weitere Artikel der Ausgabe 3/2015

Journal of Scheduling 3/2015 Zur Ausgabe