Skip to main content

2019 | OriginalPaper | Buchkapitel

A Decision Support System for Earthwork Activities in Construction Logistics

verfasst von : Mauro Dell’Amico, Guenther Fuellerer, Gerhard Hoefinger, Stefano Novellani

Erschienen in: A View of Operations Research Applications in Italy, 2018

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Making decisions in a complex system such as the construction of a highway is a hard task that involves a combinatorial set of possibilities, concerning thousands of interrelated activities and resources over several years. In this paper we describe a decision support system (DSS) developed to assist project managers in decision making for the construction of the Autostrada Pedemontana Lombarda highway, in Italy. The considered problem evaluates the earthwork activities in detail and defines the minimum cost earthwork plan satisfying all constraints. The proposed DSS involves the use of linear programming to solve the earthwork problem in a two-phase approach: in the first phase, an aggregate model determines the feasibility of the overall project, whereas in the second phase, disaggregate models determine the actual flows of each material. The DSS gathers the needed information directly from the master plan commonly used by the company and provides as output a set of visual solutions. The solution are yielded in short times and can be run many times with different data sets supporting a fast evaluation of different decisions. The provided solutions are also optimized and could substitute the previous manual results. The DSS has been proved to be very effective for assisting the project managers of the above highway construction and is currently in use in other projects.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Ahuja, R., Magnanti, T., Orlin, J.B.: Network Flows: Theory, Algorithms, and Applications. Prentice-Hall, Inc., Upper Saddle River, NJ, USA (1993) Ahuja, R., Magnanti, T., Orlin, J.B.: Network Flows: Theory, Algorithms, and Applications. Prentice-Hall, Inc., Upper Saddle River, NJ, USA (1993)
2.
Zurück zum Zitat Askew, W., Al-Jibouri, S.H., Mawdesley, M., Patterson, D.: Planning linear construction projects: automated method for the generation of earthwork activities. Autom. Constr. 11(6), 643–653 (2002)CrossRef Askew, W., Al-Jibouri, S.H., Mawdesley, M., Patterson, D.: Planning linear construction projects: automated method for the generation of earthwork activities. Autom. Constr. 11(6), 643–653 (2002)CrossRef
3.
Zurück zum Zitat Aziz, R., Aboel-Magd, Y.: Suitably selection for earthwork equipment in Egyptian sites. Int. J. Educ. Res. 3(1), 539–549 (2015) Aziz, R., Aboel-Magd, Y.: Suitably selection for earthwork equipment in Egyptian sites. Int. J. Educ. Res. 3(1), 539–549 (2015)
4.
Zurück zum Zitat Bogenberger, C., Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S., Panicucci, B.: A two-phase earthwork optimization model for highway construction. J. Constr. Eng. Manag. 141(6), 05015003 (2015)CrossRef Bogenberger, C., Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S., Panicucci, B.: A two-phase earthwork optimization model for highway construction. J. Constr. Eng. Manag. 141(6), 05015003 (2015)CrossRef
5.
Zurück zum Zitat Burdett, R., Kozan, E.: An integrated approach for earthwork allocation, sequencing and routing. Eur. J. Oper. Res. 238(3), 741–759 (2014)CrossRef Burdett, R., Kozan, E.: An integrated approach for earthwork allocation, sequencing and routing. Eur. J. Oper. Res. 238(3), 741–759 (2014)CrossRef
6.
Zurück zum Zitat Burdett, R., Kozan, E., Kenley, R.: Block models for improved earthwork allocation planning in linear infrastructure construction. Eng. Optim. 47(3), 347–369 (2015)CrossRef Burdett, R., Kozan, E., Kenley, R.: Block models for improved earthwork allocation planning in linear infrastructure construction. Eng. Optim. 47(3), 347–369 (2015)CrossRef
7.
Zurück zum Zitat Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S.: A decision support system for highway construction and its application to the Autostrada Pedemontana Lombarda. Interfaces 46(3), 203–280 (2016)CrossRef Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S.: A decision support system for highway construction and its application to the Autostrada Pedemontana Lombarda. Interfaces 46(3), 203–280 (2016)CrossRef
8.
Zurück zum Zitat Easa, S.M.: Earthwork allocations with nonconstant unit costs. J. Constr. Eng. Manag. 113(1), 34–50 (1987)CrossRef Easa, S.M.: Earthwork allocations with nonconstant unit costs. J. Constr. Eng. Manag. 113(1), 34–50 (1987)CrossRef
9.
Zurück zum Zitat Easa, S.M.: Earthwork allocations with linear unit costs. J. Constr. Eng. Manag. 114(4), 641–655 (1988)CrossRef Easa, S.M.: Earthwork allocations with linear unit costs. J. Constr. Eng. Manag. 114(4), 641–655 (1988)CrossRef
10.
Zurück zum Zitat Hare, W.L., Koch, V.R., Lucet, Y.: Models and algorithms to improve earthwork operations in road design using mixed integer linear programming. Eur. J. Oper. Res. 215(2), 470–480 (2011)MathSciNetCrossRef Hare, W.L., Koch, V.R., Lucet, Y.: Models and algorithms to improve earthwork operations in road design using mixed integer linear programming. Eur. J. Oper. Res. 215(2), 470–480 (2011)MathSciNetCrossRef
11.
Zurück zum Zitat Karimi, S., Mousavi, S.J., Kaveh, A., Afshar, A.: Fuzzy optimization model for earth-work allocations with imprecise parameters. J. Constr. Eng. Manag. 133(2), 181–190 (2007)CrossRef Karimi, S., Mousavi, S.J., Kaveh, A., Afshar, A.: Fuzzy optimization model for earth-work allocations with imprecise parameters. J. Constr. Eng. Manag. 133(2), 181–190 (2007)CrossRef
12.
Zurück zum Zitat Marzouk, M., Moselhi, O.: Multiobjective optimization of earthmoving operations. J. Constr. Eng. Manag. 130(1), 105–113 (2004)CrossRef Marzouk, M., Moselhi, O.: Multiobjective optimization of earthmoving operations. J. Constr. Eng. Manag. 130(1), 105–113 (2004)CrossRef
13.
Zurück zum Zitat Moselhi, O., Alshibani, A.: Optimization of earthmoving operations in heavy civil engineering projects. J. Constr. Eng. Manag. 135(10), 948–954 (2009)CrossRef Moselhi, O., Alshibani, A.: Optimization of earthmoving operations in heavy civil engineering projects. J. Constr. Eng. Manag. 135(10), 948–954 (2009)CrossRef
14.
Zurück zum Zitat Nassar, K., Hosny, O.: Solving the least-cost route cut and fill sequencing problem using particle swarm. J. Constr. Eng. Manag. 138(8), 931–942 (2011)CrossRef Nassar, K., Hosny, O.: Solving the least-cost route cut and fill sequencing problem using particle swarm. J. Constr. Eng. Manag. 138(8), 931–942 (2011)CrossRef
15.
Zurück zum Zitat Parente, M., Cortez, P., Correia, A.G.: An evolutionary multi-objective optimization system for earthworks. Expert Syst. Appl. 42(19), 6674–6685 (2015)CrossRef Parente, M., Cortez, P., Correia, A.G.: An evolutionary multi-objective optimization system for earthworks. Expert Syst. Appl. 42(19), 6674–6685 (2015)CrossRef
16.
Zurück zum Zitat Rahmani, A.M., Walewski, J.: Two-dimensional earthwork optimization using mixed-integer programming. In: Transportation Research Board, 90th Annual Meeting, Washington, DC, No. 42(19), 11-1975 (2015) Rahmani, A.M., Walewski, J.: Two-dimensional earthwork optimization using mixed-integer programming. In: Transportation Research Board, 90th Annual Meeting, Washington, DC, No. 42(19), 11-1975 (2015)
17.
Zurück zum Zitat Tam, C.M., Tong, T.K.L., Wong, B.W.L.: An integrated system for earthmoving planning. Constr. Manag. Econ. 25(11), 1127–1137 (2015)CrossRef Tam, C.M., Tong, T.K.L., Wong, B.W.L.: An integrated system for earthmoving planning. Constr. Manag. Econ. 25(11), 1127–1137 (2015)CrossRef
18.
Zurück zum Zitat Zhang, H.: Multi-objective simulation-optimization for earthmoving operations. Autom. Constr. 18(1), 79–86 (2008)CrossRef Zhang, H.: Multi-objective simulation-optimization for earthmoving operations. Autom. Constr. 18(1), 79–86 (2008)CrossRef
Metadaten
Titel
A Decision Support System for Earthwork Activities in Construction Logistics
verfasst von
Mauro Dell’Amico
Guenther Fuellerer
Gerhard Hoefinger
Stefano Novellani
Copyright-Jahr
2019
DOI
https://doi.org/10.1007/978-3-030-25842-9_13