A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Stronger environmental protection regulations and innovative contracting methods focused on reducing environmental impact through new incentives have placed increasing pressure on decision makers, especially those on large-scale construction projects. This increase has led to a need to identify optimal decision and select the most efficient construction modes for each activity to minimize not only the project’s time and penalty costs but also its environmental impact. To address this need, this paper applies a mathematical model based on a hybrid genetic algorithm with fuzzy logic controller (flc-hGA) to the time-cost-environmental trade-off problem with multiple projects under a fuzzy environment. Applying the proposed method to the case study of the Jinping-I Hydropower Station, a large-scale project in Southwest China, clearly demonstrates its economic, technological, and social ecological effectiveness.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Afruzi EN, Najafi AA et al (2014) A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Comput Oper Res 50(10):80–96MathSciNetCrossRefMATH Afruzi EN, Najafi AA et al (2014) A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Comput Oper Res 50(10):80–96MathSciNetCrossRefMATH
2.
Zurück zum Zitat Chen S, Chen B, Su M (2011) The cumulative effects of dam project on river ecosystem based on multi-scale ecological network analysis. Procedia Environ Sci 5:12–17CrossRef Chen S, Chen B, Su M (2011) The cumulative effects of dam project on river ecosystem based on multi-scale ecological network analysis. Procedia Environ Sci 5:12–17CrossRef
3.
Zurück zum Zitat Eshtehardian E, Afshar A, Abbasnia R (2009) Fuzzy-based MOGA approach to stochastic time-cost trade-off problem. Autom Constr 18(5):692–701CrossRef Eshtehardian E, Afshar A, Abbasnia R (2009) Fuzzy-based MOGA approach to stochastic time-cost trade-off problem. Autom Constr 18(5):692–701CrossRef
4.
Zurück zum Zitat Franck B, Neumann K, Schwindt C (2001) Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling. OR Spectr 23(3):297–324MathSciNetCrossRefMATH Franck B, Neumann K, Schwindt C (2001) Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling. OR Spectr 23(3):297–324MathSciNetCrossRefMATH
5.
Zurück zum Zitat Gen M, Cheng R, Lin L (2008) Network models and optimization: multiobjective genetic algorithm approach Gen M, Cheng R, Lin L (2008) Network models and optimization: multiobjective genetic algorithm approach
6.
Zurück zum Zitat Harvey RT, Patterson JH (1979) An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis. Found Control Eng 4(3):107–117MathSciNetMATH Harvey RT, Patterson JH (1979) An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis. Found Control Eng 4(3):107–117MathSciNetMATH
7.
Zurück zum Zitat Holland JH (1992) Adaptation in natural and artificial systems. MIT Press, Cambridge Holland JH (1992) Adaptation in natural and artificial systems. MIT Press, Cambridge
8.
Zurück zum Zitat Jeang A (2015) Project management for uncertainty with multiple objectives optimisation of time, cost and reliability. Int J Prod Res 53(5):1503–1526CrossRef Jeang A (2015) Project management for uncertainty with multiple objectives optimisation of time, cost and reliability. Int J Prod Res 53(5):1503–1526CrossRef
9.
Zurück zum Zitat Ke H, Ma J (2014) Modeling project time-cost trade-off in fuzzy random environment. Appl Soft Comput 19(2):80–85CrossRef Ke H, Ma J (2014) Modeling project time-cost trade-off in fuzzy random environment. Appl Soft Comput 19(2):80–85CrossRef
10.
Zurück zum Zitat Long LD, Ohsato A (2008) Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. Int J Project Manage 26(6):688–698CrossRef Long LD, Ohsato A (2008) Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. Int J Project Manage 26(6):688–698CrossRef
11.
Zurück zum Zitat Meier C, Yassine AA et al (2016) Optimizing time-cost trade-offs in product development projects with a multi-objective evolutionary algorithm. Res Eng Des 27(4):1–20CrossRef Meier C, Yassine AA et al (2016) Optimizing time-cost trade-offs in product development projects with a multi-objective evolutionary algorithm. Res Eng Des 27(4):1–20CrossRef
12.
Zurück zum Zitat Monghasemi S, Nikoo MR et al (2014) A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects. Expert Syst Appl 42(6):3089–3104CrossRef Monghasemi S, Nikoo MR et al (2014) A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects. Expert Syst Appl 42(6):3089–3104CrossRef
13.
Zurück zum Zitat Mungle S, Benyoucef L et al (2013) A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: a case study of highway construction project. Eng Appl Artif Intell 26(8):1953–1966CrossRef Mungle S, Benyoucef L et al (2013) A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: a case study of highway construction project. Eng Appl Artif Intell 26(8):1953–1966CrossRef
14.
Zurück zum Zitat Said SS, Haouari M (2015) A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem. Appl Math Comput 259:628–636MathSciNet Said SS, Haouari M (2015) A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem. Appl Math Comput 259:628–636MathSciNet
15.
Zurück zum Zitat Tareghian HR, Taheri SH (2007) A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Appl Math Comput 190(2):1136–1145MathSciNetMATH Tareghian HR, Taheri SH (2007) A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Appl Math Comput 190(2):1136–1145MathSciNetMATH
16.
Zurück zum Zitat Wang PT (1997) Speeding up the search process of genetic algorithm by fuzzy logic. In: Proceedings of 5th European congress on intelligent techniques and soft computing Wang PT (1997) Speeding up the search process of genetic algorithm by fuzzy logic. In: Proceedings of 5th European congress on intelligent techniques and soft computing
17.
Zurück zum Zitat Xu J, Zheng H et al (2012) Discrete time-cost-environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II hydroelectric project. Int J Project Manage 30(8):950–966CrossRef Xu J, Zheng H et al (2012) Discrete time-cost-environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II hydroelectric project. Int J Project Manage 30(8):950–966CrossRef
18.
Zurück zum Zitat Zheng H (2014) The fuzzy time-cost-quality-environment trade-off analysis of resource-constrained multi-mode construction systems for large-scale hydroelectric projects Zheng H (2014) The fuzzy time-cost-quality-environment trade-off analysis of resource-constrained multi-mode construction systems for large-scale hydroelectric projects
19.
Zurück zum Zitat Zheng H (2014) The fuzzy time-cost-quality-environment trade-off analysis of resource-constrained multi-mode construction systems for large-scale hydroelectric projects. Lect Notes Electr Eng 242:1403–1415CrossRef Zheng H (2014) The fuzzy time-cost-quality-environment trade-off analysis of resource-constrained multi-mode construction systems for large-scale hydroelectric projects. Lect Notes Electr Eng 242:1403–1415CrossRef
20.
Zurück zum Zitat Zheng H, Zhong L (2017) Discrete time-cost-environment trade-off problem and its application to a large-scale construction project. Springer Singapore Zheng H, Zhong L (2017) Discrete time-cost-environment trade-off problem and its application to a large-scale construction project. Springer Singapore
Metadaten
Titel
A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project
verfasst von
Huan Zheng
Copyright-Jahr
2018
DOI
https://doi.org/10.1007/978-3-319-59280-0_144

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.