Skip to main content

2011 | OriginalPaper | Buchkapitel

19. A Multi-Model Approach for Production Planning and Scheduling in an Industrial Environment

verfasst von : Abdelhakim Artiba, Valerie Dhaevers, David Duvivier, Salah E. Elmaghraby

Erschienen in: Planning Production and Inventories in the Extended Enterprise

Verlag: Springer New York

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This Chapter Reports On A Real-Life Implementation Of A Planning-Cum-Scheduling System In A Discrete-Continuous Industry That Produces Rolled Steel Wire And Cable Of Different Qualities And Specifications. The Chapter Describes In Some Detail The Industrial Environment Of The Application, The Experimentation That Was Conducted Prior To Implementation In Order To Tune The Various Parameters Of The Decision-Support System, And The Operational Problems That Arise Which Demand Careful Planning As Well As Dynamic Corrective Action. We Present A Multi-Model Approach That Combines Optimization Modules With Heuristic, Meta-Heuristic, Simulation And Multi-Criteria Modules In A Coherent Planning And Scheduling System Together With A Novel Architecture Of The Information-Decision Process. A Description Of The Different Models Collaborating At Different Decision Levels Is Also Given. The Implementation Of The Information/Control System Together With The Results Obtained To Date From The System Is Discussed. We Highlight The Advantages And Limitations Of The Current Version Of The System Design And Conclude With The Current Avenues Of Investigation, Which We Are Pursuing In Cooperation With The Enterprise, And The Anticipated Future Developments.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
For the French ‘planification’, meaning ‘planning’, and ‘ordonnancement’ meaning ‘scheduling’.
 
2
For the French ‘Petit Toron’.
 
3
For the French ‘Moyen Toron’.
 
4
For the French ‘Gros Toron’.
 
Literatur
Zurück zum Zitat Allahverdi A, Gupta JND, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega 27(2):219–239CrossRef Allahverdi A, Gupta JND, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega 27(2):219–239CrossRef
Zurück zum Zitat Appelqvist P, Lehtonen JM (2005) Combining optimisation and simulation for steel production scheduling. J Manufact Tech Manag 16(2):197–210CrossRef Appelqvist P, Lehtonen JM (2005) Combining optimisation and simulation for steel production scheduling. J Manufact Tech Manag 16(2):197–210CrossRef
Zurück zum Zitat Artiba A, Levecq P, Riane F, Botta V, Guinet A (1997) A unified framework and a classification scheme to model production systems. In: Proceedings of the First International Conference on Operations and Quantitative Management, Jaipur, 467–474. ICOQM, January Artiba A, Levecq P, Riane F, Botta V, Guinet A (1997) A unified framework and a classification scheme to model production systems. In: Proceedings of the First International Conference on Operations and Quantitative Management, Jaipur, 467–474. ICOQM, January
Zurück zum Zitat Artiba A, Emelyanov V, Iassinovski S (1998) Introduction to intelligent simulation: The RAO language. Kluwer Artiba A, Emelyanov V, Iassinovski S (1998) Introduction to intelligent simulation: The RAO language. Kluwer
Zurück zum Zitat Assaf I, Chen M, Katzberg J (1997) Steel production schedule generation. Int J Prod Res 35(2):467–477CrossRef Assaf I, Chen M, Katzberg J (1997) Steel production schedule generation. Int J Prod Res 35(2):467–477CrossRef
Zurück zum Zitat Billaut JC, Kindt VT (2002) Multicriteria scheduling. Springer Billaut JC, Kindt VT (2002) Multicriteria scheduling. Springer
Zurück zum Zitat Brans JP, Mareschal B (1994) PROMCALC and GAIA: A new decision support system for multicriteria decision aid. Decis Support Syst 12:297–310CrossRef Brans JP, Mareschal B (1994) PROMCALC and GAIA: A new decision support system for multicriteria decision aid. Decis Support Syst 12:297–310CrossRef
Zurück zum Zitat Brans JP, Vincke Ph, Mareschal B (1986) How to select and how to rank projects: The Promethee method. Eur J Oper Res 24:228–238CrossRef Brans JP, Vincke Ph, Mareschal B (1986) How to select and how to rank projects: The Promethee method. Eur J Oper Res 24:228–238CrossRef
Zurück zum Zitat Carlier J, Chrétienne P (1988) Problèmes d’Ordonnancement, Modélisation, Complexité, Algorithmes. Masson. ISBN: 2-225-81275-6 Carlier J, Chrétienne P (1988) Problèmes d’Ordonnancement, Modélisation, Complexité, Algorithmes. Masson. ISBN: 2-225-81275-6
Zurück zum Zitat Chrétienne P, Coffman EG Jr, Lenstra JK, Liu Z (eds.) (1995) Scheduling theory and its applications. Wiley Chrétienne P, Coffman EG Jr, Lenstra JK, Liu Z (eds.) (1995) Scheduling theory and its applications. Wiley
Zurück zum Zitat Denton B, Gupta D, Jawahir K (2003) Managing increasing product variety at integrated steel mills. Interfaces 33(2):41–53 Denton B, Gupta D, Jawahir K (2003) Managing increasing product variety at integrated steel mills. Interfaces 33(2):41–53
Zurück zum Zitat Duvivier D, Dhaevers V, Artiba A (2005) Simulation-based performance measurement and analysis: An industrial application. Int J Comput Integrated Manuf 18(5):402–407CrossRef Duvivier D, Dhaevers V, Artiba A (2005) Simulation-based performance measurement and analysis: An industrial application. Int J Comput Integrated Manuf 18(5):402–407CrossRef
Zurück zum Zitat Duvivier D, Dhaevers V, Bachelet B, Artiba A (2003) Integrating simulation and optimization of manufacturing systems. IEEE SMC C Appl Rev 33(2):186–192 Duvivier D, Dhaevers V, Bachelet B, Artiba A (2003) Integrating simulation and optimization of manufacturing systems. IEEE SMC C Appl Rev 33(2):186–192
Zurück zum Zitat Duvivier D, Roux O, Dhaevers V, Lazraq A (2006) Comparison of scheduling strategies via a statistical analysis in an industrial context. Int Conf Service Syst Service Manag Duvivier D, Roux O, Dhaevers V, Lazraq A (2006) Comparison of scheduling strategies via a statistical analysis in an industrial context. Int Conf Service Syst Service Manag
Zurück zum Zitat Duvivier D, Roux O, Dhaevers V, Meskens N, Artiba A (2007) Multicriteria Optimisation and Simulation: an Industrial Application. Ann Oper Res Stochastic Search Algorithms 156(1):45–60 Duvivier D, Roux O, Dhaevers V, Meskens N, Artiba A (2007) Multicriteria Optimisation and Simulation: an Industrial Application. Ann Oper Res Stochastic Search Algorithms 156(1):45–60
Zurück zum Zitat Duvivier D, Artiba A, Dhaevers V (2002) Simulation based performance measurement and analysis: An industrial application. In: Proceedings of the 18th International Conference on CAD/CAM, RoboticS and Factories OF the Future (CARS&FOF2002), Porto, Portugal, July Duvivier D, Artiba A, Dhaevers V (2002) Simulation based performance measurement and analysis: An industrial application. In: Proceedings of the 18th International Conference on CAD/CAM, RoboticS and Factories OF the Future (CARS&FOF2002), Porto, Portugal, July
Zurück zum Zitat Duvivier D, Preux P, Talbi E-G (1996) Climbing up NP-hard hills. In: Voight H-M, Ebeling W, Rechenberg I, Schwefel H-P (eds.) Parallel problem solving from nature – PPSN IV, Lecture Notes in Computer Science (LNCS), vol. 1141. Springer, Berlin, pp. 574–583CrossRef Duvivier D, Preux P, Talbi E-G (1996) Climbing up NP-hard hills. In: Voight H-M, Ebeling W, Rechenberg I, Schwefel H-P (eds.) Parallel problem solving from nature – PPSN IV, Lecture Notes in Computer Science (LNCS), vol. 1141. Springer, Berlin, pp. 574–583CrossRef
Zurück zum Zitat Duvivier D, Preux P, Talbi E-G, Preux Ph, Fonlupt C, Robilliard D (1998) The fitness function and its impact on local search methods. In: Proceedings of the conference IEEE Systems, Man, and Cybernetics, pp. 2478–2483, San Diego, USA, October, IEEE Press Duvivier D, Preux P, Talbi E-G, Preux Ph, Fonlupt C, Robilliard D (1998) The fitness function and its impact on local search methods. In: Proceedings of the conference IEEE Systems, Man, and Cybernetics, pp. 2478–2483, San Diego, USA, October, IEEE Press
Zurück zum Zitat Elmaghraby SE, Elimam A (1984) Composite mix design in production of asbestos/cement pipes. Appl Math Modell 8(6):425–432CrossRef Elmaghraby SE, Elimam A (1984) Composite mix design in production of asbestos/cement pipes. Appl Math Modell 8(6):425–432CrossRef
Zurück zum Zitat Garey MR, Johnson DS (1979) Computers and Intractability; A Guide to the Theory of NP-Completeness. W.H. Freeman and Company. ISBN: 0-7167-1045-5 Garey MR, Johnson DS (1979) Computers and Intractability; A Guide to the Theory of NP-Completeness. W.H. Freeman and Company. ISBN: 0-7167-1045-5
Zurück zum Zitat Glover F (1989) Tabu search – part I. ORSA J Comput 1(3):190–206 Glover F (1989) Tabu search – part I. ORSA J Comput 1(3):190–206
Zurück zum Zitat Glover F (1989) Tabu search – part II. ORSA J Comput 2(1):4–31 Glover F (1989) Tabu search – part II. ORSA J Comput 2(1):4–31
Zurück zum Zitat Graham R, Lawler E, Lenstra J, Kann AR (1978) Optimization and approximation in deterministic sequencing and scheduling theory: a survey. Ann Discrete Math 5:287–326CrossRef Graham R, Lawler E, Lenstra J, Kann AR (1978) Optimization and approximation in deterministic sequencing and scheduling theory: a survey. Ann Discrete Math 5:287–326CrossRef
Zurück zum Zitat Hansmann K-W, Hoeck M (1997) Production control of a flexible manufacturing system in a job shop environment. Int Trans Oper Res 4(5/6):341–351CrossRef Hansmann K-W, Hoeck M (1997) Production control of a flexible manufacturing system in a job shop environment. Int Trans Oper Res 4(5/6):341–351CrossRef
Zurück zum Zitat Hoogeveen H (2005) Multicriteria scheduling. Eur J Oper Res 167:592–623CrossRef Hoogeveen H (2005) Multicriteria scheduling. Eur J Oper Res 167:592–623CrossRef
Zurück zum Zitat Hoos HH, Stützle Th (2005) Stochastic local search: Foundations and applications. Morgan-Kaufmann Hoos HH, Stützle Th (2005) Stochastic local search: Foundations and applications. Morgan-Kaufmann
Zurück zum Zitat Iassinovski S, Artiba A, Bachelet V, Riane F (2003) Integration of simulation and optimization for solving complex decision making problems. Int J Prod Econ 85(1):3–10CrossRef Iassinovski S, Artiba A, Bachelet V, Riane F (2003) Integration of simulation and optimization for solving complex decision making problems. Int J Prod Econ 85(1):3–10CrossRef
Zurück zum Zitat Jain AS, Meeran S (2001) Deterministic job-shop scheduling: Past, present and future. Eur J Oper Res 113(2):390–434CrossRef Jain AS, Meeran S (2001) Deterministic job-shop scheduling: Past, present and future. Eur J Oper Res 113(2):390–434CrossRef
Zurück zum Zitat Kalagnanam J, Dash S, Reddy C (2007) Production design and operations scheduling (PDOS) for plate products in the steel industry. IBM Watson Research Center Technical Report. <  >  Kalagnanam J, Dash S, Reddy C (2007) Production design and operations scheduling (PDOS) for plate products in the steel industry. IBM Watson Research Center Technical Report. <  > 
Zurück zum Zitat Li J, Tang L, Wu H (2005) Model and algorithm for hot rolling steel tube MPS. J Syst Eng 20(5):459–465 Li J, Tang L, Wu H (2005) Model and algorithm for hot rolling steel tube MPS. J Syst Eng 20(5):459–465
Zurück zum Zitat Li J, Tang L, Pang H, Wu H (2005) Decision support system for steel tube production planning and scheduling. Proceedings of 2005 Chinese Control and Decision Conference, Haerbing, 1891–1894 Li J, Tang L, Pang H, Wu H (2005) Decision support system for steel tube production planning and scheduling. Proceedings of 2005 Chinese Control and Decision Conference, Haerbing, 1891–1894
Zurück zum Zitat Li J, Li L, Tang L, Wu H (2006) A case of rule-based heuristics for scheduling hot rolling seamless steel tube production. Expert Syst 23(3):145–158CrossRef Li J, Li L, Tang L, Wu H (2006) A case of rule-based heuristics for scheduling hot rolling seamless steel tube production. Expert Syst 23(3):145–158CrossRef
Zurück zum Zitat Lindo Systems Inc. (1999) LINGO, The Modeling Language and Optimizer. LINDO Systems Inc., 1415 North Dayton Street, Chicago, Illinois 60622, USA, 1999. < http://www.lindo.com >  Lindo Systems Inc. (1999) LINGO, The Modeling Language and Optimizer. LINDO Systems Inc., 1415 North Dayton Street, Chicago, Illinois 60622, USA, 1999. < http://​www.​lindo.​com > 
Zurück zum Zitat De Lit P, Latinne P, Rekiek B, Delchambre A (2001) An ordering genetic algorithm for assembly planning. Int J Prod Res 39(16):3623–3640CrossRef De Lit P, Latinne P, Rekiek B, Delchambre A (2001) An ordering genetic algorithm for assembly planning. Int J Prod Res 39(16):3623–3640CrossRef
Zurück zum Zitat Mareschal B (1988) Weight stability intervals in multicriteria decision aid. Eur J Oper Res 33:54–64CrossRef Mareschal B (1988) Weight stability intervals in multicriteria decision aid. Eur J Oper Res 33:54–64CrossRef
Zurück zum Zitat Nowicki E, Smutnicki C (1996) A fast taboo search algorithm for the job shop problem. Manag Sci 42(6):797–813CrossRef Nowicki E, Smutnicki C (1996) A fast taboo search algorithm for the job shop problem. Manag Sci 42(6):797–813CrossRef
Zurück zum Zitat Nowicki E, Smutnicki C (1998) The flow shop with parallel machines: A Tabu search approach. Eur J Oper Res 106:226–253CrossRef Nowicki E, Smutnicki C (1998) The flow shop with parallel machines: A Tabu search approach. Eur J Oper Res 106:226–253CrossRef
Zurück zum Zitat Osman IH, Kelly JP (1995) Meta-heuristics: An overview. In: Proceedings of Meta-Heuristics’95 (MIC’95). Kluwer, July Osman IH, Kelly JP (1995) Meta-heuristics: An overview. In: Proceedings of Meta-Heuristics’95 (MIC’95). Kluwer, July
Zurück zum Zitat Osman IH, Laporte G (1996) Metaheuristics: A bibliography. Ann Oper Res 63:513–628CrossRef Osman IH, Laporte G (1996) Metaheuristics: A bibliography. Ann Oper Res 63:513–628CrossRef
Zurück zum Zitat Papadimitriou CH, Steiglitz K (1982) Combinatorial optimization: algorithms and complexity. Prentice-Hall, Englewood Cliffs, NJ, USA. ISBN: 0-1315-2462-3 Papadimitriou CH, Steiglitz K (1982) Combinatorial optimization: algorithms and complexity. Prentice-Hall, Englewood Cliffs, NJ, USA. ISBN: 0-1315-2462-3
Zurück zum Zitat Park H, Hong Y, Chang SY (2002) An efficient scheduling algorithm for the hot coil making in the steel mini-mill. Prod Plan Contr 13(3):298–306CrossRef Park H, Hong Y, Chang SY (2002) An efficient scheduling algorithm for the hot coil making in the steel mini-mill. Prod Plan Contr 13(3):298–306CrossRef
Zurück zum Zitat Pinedo M (2002) Scheduling – Theory, Algorithms, and Systems, 2nd edn. Prentice Hall. ISBN: 0-13-028138-7 Pinedo M (2002) Scheduling – Theory, Algorithms, and Systems, 2nd edn. Prentice Hall. ISBN: 0-13-028138-7
Zurück zum Zitat Pinedo M, Chao X (1999) Operations scheduling with applications in manufacturing and services. Irwin/McGraw-Hil. ISBN: 0-07-289779-1 Pinedo M, Chao X (1999) Operations scheduling with applications in manufacturing and services. Irwin/McGraw-Hil. ISBN: 0-07-289779-1
Zurück zum Zitat Pomerol J-C, Barba-Romero S (2000) Multicriterion decision making in management: principles and practice. Kluwer, New York Pomerol J-C, Barba-Romero S (2000) Multicriterion decision making in management: principles and practice. Kluwer, New York
Zurück zum Zitat Rayward-Smith VJ, Osman IH, Reeves CR, Smith GD (eds.) (1996) Modern heuristic search methods. Wiley. ISBN: 0-471-96280-5 Rayward-Smith VJ, Osman IH, Reeves CR, Smith GD (eds.) (1996) Modern heuristic search methods. Wiley. ISBN: 0-471-96280-5
Zurück zum Zitat Reeves CR (ed.) (1995) Modern heuristic techniques for combinatorial problems, Advanced topics in computer science. McGraw-Hill. ISBN: 0-07-709239-2 Reeves CR (ed.) (1995) Modern heuristic techniques for combinatorial problems, Advanced topics in computer science. McGraw-Hill. ISBN: 0-07-709239-2
Zurück zum Zitat Rekiek B (2001) Assembly line design multiple objective grouping genetic algorithm and the balancing of mixed-model hybrid assembly line. PhD thesis, Université Libre de Bruxelles, Bruxelles, Belgium Rekiek B (2001) Assembly line design multiple objective grouping genetic algorithm and the balancing of mixed-model hybrid assembly line. PhD thesis, Université Libre de Bruxelles, Bruxelles, Belgium
Zurück zum Zitat Riane F, Artiba A, Iassinovski S (2001) An integrated production planning and scheduling system for hybrid flowshop organizations. Int J Prod Econ 74:33–48CrossRef Riane F, Artiba A, Iassinovski S (2001) An integrated production planning and scheduling system for hybrid flowshop organizations. Int J Prod Econ 74:33–48CrossRef
Zurück zum Zitat Roux O, Duvivier D, Dhaevers V, Meskens N, Artiba A (2005) A multicriteria approach to rank scheduling strategies. International Conference on Industrial Engineering and Systems Management (IESM’05), Marrakech, Morocco, 673–682, May Roux O, Duvivier D, Dhaevers V, Meskens N, Artiba A (2005) A multicriteria approach to rank scheduling strategies. International Conference on Industrial Engineering and Systems Management (IESM’05), Marrakech, Morocco, 673–682, May
Zurück zum Zitat Smith ML, Seidmann A (1983) Due date selection procedures for jobshop simulation. Comput Ind Eng 7(3):199–207CrossRef Smith ML, Seidmann A (1983) Due date selection procedures for jobshop simulation. Comput Ind Eng 7(3):199–207CrossRef
Zurück zum Zitat Talbi E-G (2002) A taxonomy of hybrid metaheuristics. J Heuristics 8(2):541–564CrossRef Talbi E-G (2002) A taxonomy of hybrid metaheuristics. J Heuristics 8(2):541–564CrossRef
Zurück zum Zitat Vignier A, Billaut JC, Proust C (1999) Les flowshop hybrides: état de l’art. RAIRO/RO 33(2):117–183CrossRef Vignier A, Billaut JC, Proust C (1999) Les flowshop hybrides: état de l’art. RAIRO/RO 33(2):117–183CrossRef
Zurück zum Zitat Avinash MW, Sarker BR, Lal AM (1995) A comparative study of some priority dispatching rules under different shop loads. Prod Plann Contr 6(4):301–310CrossRef Avinash MW, Sarker BR, Lal AM (1995) A comparative study of some priority dispatching rules under different shop loads. Prod Plann Contr 6(4):301–310CrossRef
Zurück zum Zitat Zhu B, Yu H (2002) A mathematical programming model for scheduling steel making – continuous casting – hot rolling production. Control and Automation, The 2002 International Conference on Control and Automation, June 16–19, 107. ISBN: 0-7803-7412-6 Zhu B, Yu H (2002) A mathematical programming model for scheduling steel making – continuous casting – hot rolling production. Control and Automation, The 2002 International Conference on Control and Automation, June 16–19, 107. ISBN: 0-7803-7412-6
Metadaten
Titel
A Multi-Model Approach for Production Planning and Scheduling in an Industrial Environment
verfasst von
Abdelhakim Artiba
Valerie Dhaevers
David Duvivier
Salah E. Elmaghraby
Copyright-Jahr
2011
Verlag
Springer New York
DOI
https://doi.org/10.1007/978-1-4419-8191-2_19