Skip to main content
Erschienen in: EURO Journal on Transportation and Logistics 3/2015

01.09.2015 | Tutorial

A tutorial on non-periodic train timetabling and platforming problems

verfasst von: Valentina Cacchiani, Laura Galli, Paolo Toth

Erschienen in: EURO Journal on Transportation and Logistics | Ausgabe 3/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this tutorial, we give an overview of two fundamental problems arising in the optimization of a railway system: the train timetabling problem (TTP), in its non-periodic version, and the train platforming problem (TPP). We consider for both problems the planning stage, i.e. we face them from a tactical point of view. These problems correspond to two main phases that are usually optimized in close sequence by the railway infrastructure manager. First, in the TTP phase, a schedule of the trains in a railway network is determined. A schedule consists of the arrival and departure times of each train at each (visited) station. Second, in the TPP phase, one needs to determine a stopping platform and a routing for each train inside each (visited) station, according to the schedule found in the TTP phase. Due to the complexity of the two problems, an integrated approach is generally hopeless for real-world instances. Hence, the two phases are considered separately and optimized in sequence. Although there exist several versions for both problems, depending on the infrastructure manager and train operators requirements, we do not aim at presenting all of them, but rather at introducing the reader to the topic using small examples. We present models and solution approaches for the two problems in a didactic way and always refer the reader to the corresponding papers for technical details.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Anhänge
Nur mit Berechtigung zugänglich
Literatur
Zurück zum Zitat Adenso-Díaz B, Oliva González M (1999) On-line timetable rescheduling in regional train services. Transp Res Part B 33:387–398CrossRef Adenso-Díaz B, Oliva González M (1999) On-line timetable rescheduling in regional train services. Transp Res Part B 33:387–398CrossRef
Zurück zum Zitat Barber F, Ingolotti L, Lova A, Marin A, Mesa J, Ortega F, Tormos P (2008) Integrating timetabling, network and line design. Technical report, ARRIVAL project Barber F, Ingolotti L, Lova A, Marin A, Mesa J, Ortega F, Tormos P (2008) Integrating timetabling, network and line design. Technical report, ARRIVAL project
Zurück zum Zitat Billionnet A (2003) Using integer programming to solve the train platforming problem. Transp Sci 37:213–222CrossRef Billionnet A (2003) Using integer programming to solve the train platforming problem. Transp Sci 37:213–222CrossRef
Zurück zum Zitat Borndörfer R, Grötschel M, Lukac S, Mitusch K, Schlechte T, Schultz S, Tanner A (2006) An auctioning approach to railway slot allocation. Compet Regul Netw Ind 7(2):163–197 Borndörfer R, Grötschel M, Lukac S, Mitusch K, Schlechte T, Schultz S, Tanner A (2006) An auctioning approach to railway slot allocation. Compet Regul Netw Ind 7(2):163–197
Zurück zum Zitat Borndörfer R, Schlechte T (2008) Solving railway track allocation problems. In: Kalcsics J, Nickel S (eds) Operations research proceedings 2007. Springer, Berlin, pp 117–122CrossRef Borndörfer R, Schlechte T (2008) Solving railway track allocation problems. In: Kalcsics J, Nickel S (eds) Operations research proceedings 2007. Springer, Berlin, pp 117–122CrossRef
Zurück zum Zitat Brännlund U, Lindberg PO, Nöu A, Nilsson JE (1998) Railway timetabling using Lagrangian relaxation. Transp Sci 32:358–369CrossRef Brännlund U, Lindberg PO, Nöu A, Nilsson JE (1998) Railway timetabling using Lagrangian relaxation. Transp Sci 32:358–369CrossRef
Zurück zum Zitat Burdett R, Kozan E (2010) A sequencing approach for creating new train timetables. OR Spectr 32(1):163–193CrossRef Burdett R, Kozan E (2010) A sequencing approach for creating new train timetables. OR Spectr 32(1):163–193CrossRef
Zurück zum Zitat Burer S, Letchford AN (2012) Non-convex mixed-integer nonlinear programming: a survey. Surv Oper Res Manag Sci 17(2):97–106 Burer S, Letchford AN (2012) Non-convex mixed-integer nonlinear programming: a survey. Surv Oper Res Manag Sci 17(2):97–106
Zurück zum Zitat Burkard RE, Dell’Amico M, Martello S (2009) Assignment problems. SIAM, Philadelphia. ISBN: 978-0-898716-63-4 Burkard RE, Dell’Amico M, Martello S (2009) Assignment problems. SIAM, Philadelphia. ISBN: 978-0-898716-63-4
Zurück zum Zitat Cacchiani V (2009) Models and algorithms for combinatorial optimization problems arising in railway applications. 4OR A Q J Oper Res 7(1):109–112CrossRef Cacchiani V (2009) Models and algorithms for combinatorial optimization problems arising in railway applications. 4OR A Q J Oper Res 7(1):109–112CrossRef
Zurück zum Zitat Cacchiani V, Caprara A, Fischetti M (2012) A Lagrangian heuristic for robustness, with an application to train timetabling. Transp Sci 46(1):124–133CrossRef Cacchiani V, Caprara A, Fischetti M (2012) A Lagrangian heuristic for robustness, with an application to train timetabling. Transp Sci 46(1):124–133CrossRef
Zurück zum Zitat Cacchiani V, Caprara A, Toth P (2008) A column generation approach to train timetabling on a corridor. 4OR Q J Oper Res 6(2):125–142CrossRef Cacchiani V, Caprara A, Toth P (2008) A column generation approach to train timetabling on a corridor. 4OR Q J Oper Res 6(2):125–142CrossRef
Zurück zum Zitat Cacchiani V, Caprara A, Toth P (2010) Non-cyclic train timetabling and comparability graphs. Oper Res Lett 38(3):179–184CrossRef Cacchiani V, Caprara A, Toth P (2010) Non-cyclic train timetabling and comparability graphs. Oper Res Lett 38(3):179–184CrossRef
Zurück zum Zitat Cacchiani V, Caprara A, Toth P (2010) Scheduling extra freight trains on railway networks. Transp Res Part B 44B(2):215–231CrossRef Cacchiani V, Caprara A, Toth P (2010) Scheduling extra freight trains on railway networks. Transp Res Part B 44B(2):215–231CrossRef
Zurück zum Zitat Cacchiani V, Caprara A, Toth P (2013) Finding cliques of maximum weight on a generalization of permutation graphs. Optim Lett 7(2):289–296CrossRef Cacchiani V, Caprara A, Toth P (2013) Finding cliques of maximum weight on a generalization of permutation graphs. Optim Lett 7(2):289–296CrossRef
Zurück zum Zitat Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transp Res Part B 63:15–37 Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transp Res Part B 63:15–37
Zurück zum Zitat Cacchiani V, Toth P (2012) Nominal and robust train timetabling problems. Eur J Oper Res 219(3):727–737CrossRef Cacchiani V, Toth P (2012) Nominal and robust train timetabling problems. Eur J Oper Res 219(3):727–737CrossRef
Zurück zum Zitat Cadarso L, Marín A (2012) Integration of timetable planning and rolling stock in rapid transit networks. Ann Oper Res 199(1):113–135CrossRef Cadarso L, Marín A (2012) Integration of timetable planning and rolling stock in rapid transit networks. Ann Oper Res 199(1):113–135CrossRef
Zurück zum Zitat Cai X, Goh CJ (1994) A fast heuristic for the train scheduling problem. Comput Oper Res 21:499–510CrossRef Cai X, Goh CJ (1994) A fast heuristic for the train scheduling problem. Comput Oper Res 21:499–510CrossRef
Zurück zum Zitat Caprara A (2010) Almost 20 years of combinatorial optimization for railway planning: from Lagrangian relaxation to column generation. In: Erlebach T, Lübbecke M (eds) Proceedings of the 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS). Schloss Dagstuhl, Germany, pp 1–12 Caprara A (2010) Almost 20 years of combinatorial optimization for railway planning: from Lagrangian relaxation to column generation. In: Erlebach T, Lübbecke M (eds) Proceedings of the 10th workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS). Schloss Dagstuhl, Germany, pp 1–12
Zurück zum Zitat Caprara A, Fischetti M, Toth P (2002) Modeling and solving the train timetabling problem. Oper Res 50:851–861CrossRef Caprara A, Fischetti M, Toth P (2002) Modeling and solving the train timetabling problem. Oper Res 50:851–861CrossRef
Zurück zum Zitat Caprara A, Galli L, Toth P (2011) Solution of the train platforming problem. Transp Sci 45(2):246–257CrossRef Caprara A, Galli L, Toth P (2011) Solution of the train platforming problem. Transp Sci 45(2):246–257CrossRef
Zurück zum Zitat Caprara A, Galli L, Stiller S, Toth P (2014) Delay robust event scheduling. Oper Res, forthcoming Caprara A, Galli L, Stiller S, Toth P (2014) Delay robust event scheduling. Oper Res, forthcoming
Zurück zum Zitat Kroon L, Monaci M, Peeters M, Toth P (2007) Passenger railway optimization. In: Barnhart C, Laporte G (eds) Transportation, handbooks in operations research and management science. Elsevier, Amsterdam, pp 129–187 Kroon L, Monaci M, Peeters M, Toth P (2007) Passenger railway optimization. In: Barnhart C, Laporte G (eds) Transportation, handbooks in operations research and management science. Elsevier, Amsterdam, pp 129–187
Zurück zum Zitat Caprara A, Kroon L, Toth P (2011) Optimization problems in passenger railway systems. Wiley Encycl Oper Res Manag Sci 6:3896–3905 Caprara A, Kroon L, Toth P (2011) Optimization problems in passenger railway systems. Wiley Encycl Oper Res Manag Sci 6:3896–3905
Zurück zum Zitat Caprara A, Monaci M, Toth P, Guida PL (2006) A Lagrangian heuristic approach to real-world train timetabling problems. Discret Appl Math 154:738–753CrossRef Caprara A, Monaci M, Toth P, Guida PL (2006) A Lagrangian heuristic approach to real-world train timetabling problems. Discret Appl Math 154:738–753CrossRef
Zurück zum Zitat Carey M, Carville S (2003) Scheduling and platforming trains at busy complex stations. Transp Res Part A 37:195–224 Carey M, Carville S (2003) Scheduling and platforming trains at busy complex stations. Transp Res Part A 37:195–224
Zurück zum Zitat Carey M, Lockwood D (1995) A model, algorithms and strategy for train pathing. J Oper Res Soc 46:988–1005CrossRef Carey M, Lockwood D (1995) A model, algorithms and strategy for train pathing. J Oper Res Soc 46:988–1005CrossRef
Zurück zum Zitat Cicerone S, D’Angelo G, Di Stefano G, Frigioni D, Navarra A (2009) Recoverable robust timetabling for single delay: complexity and polynomial algorithms for special cases. J Comb Optim 18:229–257CrossRef Cicerone S, D’Angelo G, Di Stefano G, Frigioni D, Navarra A (2009) Recoverable robust timetabling for single delay: complexity and polynomial algorithms for special cases. J Comb Optim 18:229–257CrossRef
Zurück zum Zitat Cordeau JF, Toth P, Vigo D (1998) A survey of optimization models for train routing and scheduling. Transp Sci 32:380–404CrossRef Cordeau JF, Toth P, Vigo D (1998) A survey of optimization models for train routing and scheduling. Transp Sci 32:380–404CrossRef
Zurück zum Zitat D’Ariano A, Corman F, Pacciarelli D, Pranzo M (2008) Reordering and local rerouting strategies to manage train traffic in real time. Transp Sci 42(4):405–419CrossRef D’Ariano A, Corman F, Pacciarelli D, Pranzo M (2008) Reordering and local rerouting strategies to manage train traffic in real time. Transp Sci 42(4):405–419CrossRef
Zurück zum Zitat D’Ariano A, Pacciarelli D, Pranzo M (2007) A branch and bound algorithm for scheduling trains on a railway network. Eur J Oper Res 183(2):643–657CrossRef D’Ariano A, Pacciarelli D, Pranzo M (2007) A branch and bound algorithm for scheduling trains on a railway network. Eur J Oper Res 183(2):643–657CrossRef
Zurück zum Zitat De Luca Cardillo D, Mione N (1999) k L-list T colouring of graphs. Eur J Oper Res 106:160–164 De Luca Cardillo D, Mione N (1999) k L-list T colouring of graphs. Eur J Oper Res 106:160–164
Zurück zum Zitat Dollevoet T, Huisman D, Schmidt M, Schöbel A (2012) Delay management with rerouting of passengers. Transp Sci 46:74–89CrossRef Dollevoet T, Huisman D, Schmidt M, Schöbel A (2012) Delay management with rerouting of passengers. Transp Sci 46:74–89CrossRef
Zurück zum Zitat Fischer F, Helmberg C, Janßen J, Krostitz B (2008) Towards solving very large scale train timetabling problems by Lagrangian relaxation. In: Fischetti M, Widmayer P (eds) 8th Workshop on algorithmic approaches for transportation modeling, optimization, and systems (ATMOS08). Schloss Dagstuhl, Germany, pp 1–12 Fischer F, Helmberg C, Janßen J, Krostitz B (2008) Towards solving very large scale train timetabling problems by Lagrangian relaxation. In: Fischetti M, Widmayer P (eds) 8th Workshop on algorithmic approaches for transportation modeling, optimization, and systems (ATMOS08). Schloss Dagstuhl, Germany, pp 1–12
Zurück zum Zitat Fischetti M, Monaci M (2009) Light robustness. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science, vol 5868. Springer, Berlin, pp 61–84CrossRef Fischetti M, Monaci M (2009) Light robustness. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science, vol 5868. Springer, Berlin, pp 61–84CrossRef
Zurück zum Zitat Fischetti M, Salvagnin D, Zanette A (2009) Fast approaches to improve the robustness of a railway timetable. Transp Sci 43:321–335CrossRef Fischetti M, Salvagnin D, Zanette A (2009) Fast approaches to improve the robustness of a railway timetable. Transp Sci 43:321–335CrossRef
Zurück zum Zitat Galli L (2011) Combinatorial and robust optimisation models and algorithms for railway applications. 4OR 9:215–218CrossRef Galli L (2011) Combinatorial and robust optimisation models and algorithms for railway applications. 4OR 9:215–218CrossRef
Zurück zum Zitat Harrod SS (2012) A tutorial on fundamental model structures for railway timetable optimization. Surv Oper Res Manag Sci 17(2):85–96 Harrod SS (2012) A tutorial on fundamental model structures for railway timetable optimization. Surv Oper Res Manag Sci 17(2):85–96
Zurück zum Zitat Higgings A, Kozan E, Ferreira L (1997) Heuristic techniques for single line train scheduling. J Heuristics 3:43–62CrossRef Higgings A, Kozan E, Ferreira L (1997) Heuristic techniques for single line train scheduling. J Heuristics 3:43–62CrossRef
Zurück zum Zitat Huisman D, Kroon LG, Lentink RM, Vromans MJCM (2005) Operations research in passenger railway transportation. Stat Neerl 59:467–497CrossRef Huisman D, Kroon LG, Lentink RM, Vromans MJCM (2005) Operations research in passenger railway transportation. Stat Neerl 59:467–497CrossRef
Zurück zum Zitat Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46–64CrossRef Jovanovic D, Harker PT (1991) Tactical scheduling of rail operations: the SCAN I system. Transp Sci 25:46–64CrossRef
Zurück zum Zitat Kroon LG, Dekker R, Maróti G, Vromans MJCM (2008) Stochastic improvement of cyclic railway timetables. Transp Res Part B 42(6):553–570CrossRef Kroon LG, Dekker R, Maróti G, Vromans MJCM (2008) Stochastic improvement of cyclic railway timetables. Transp Res Part B 42(6):553–570CrossRef
Zurück zum Zitat Kroon LG, Peeters LWP (2003) A variable trip time model for cyclic railway timetabling. Transp Sci 37:198–212CrossRef Kroon LG, Peeters LWP (2003) A variable trip time model for cyclic railway timetabling. Transp Sci 37:198–212CrossRef
Zurück zum Zitat Kroon LG, Romeijn HE, Zwaneveld PJ (1997) Routing trains through railway stations: complexity issues. Eur J Oper Res 98:485–498CrossRef Kroon LG, Romeijn HE, Zwaneveld PJ (1997) Routing trains through railway stations: complexity issues. Eur J Oper Res 98:485–498CrossRef
Zurück zum Zitat Liebchen C (2006) Periodic timetable optimization in public transport. Dissertation.de - verlag im Internet GmbH. ISBN: 3-86624-150-X Liebchen C (2006) Periodic timetable optimization in public transport. Dissertation.de - verlag im Internet GmbH. ISBN: 3-86624-150-X
Zurück zum Zitat Liebchen C, Lübbecke M, Möhring R, Stiller S (2009) The concept of recoverable robustness, linear programming recovery, and railway applications. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science 5868. Springer, Berlin Heidelberg, pp 1–27 Liebchen C, Lübbecke M, Möhring R, Stiller S (2009) The concept of recoverable robustness, linear programming recovery, and railway applications. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science 5868. Springer, Berlin Heidelberg, pp 1–27
Zurück zum Zitat Liebchen C, Möhring R et al (2007) The modeling power of the periodic event scheduling problem: railway timetables—and beyond. In: Geraets F (ed) Algorithmic methods for railway optimization, lecture notes in computer science, vol 4359. Springer, Berlin Liebchen C, Möhring R et al (2007) The modeling power of the periodic event scheduling problem: railway timetables—and beyond. In: Geraets F (ed) Algorithmic methods for railway optimization, lecture notes in computer science, vol 4359. Springer, Berlin
Zurück zum Zitat Liebchen C, Proksch M, Wagner FH (2007) Performance of algorithms for periodic timetable optimization. In: Hickman P, Wagner FH, Voss S (eds) Computer-aided systems in public transport (CASPT 2004), lecture notes in economics and mathematical systems, vol 600. Springer, Berlin Liebchen C, Proksch M, Wagner FH (2007) Performance of algorithms for periodic timetable optimization. In: Hickman P, Wagner FH, Voss S (eds) Computer-aided systems in public transport (CASPT 2004), lecture notes in economics and mathematical systems, vol 600. Springer, Berlin
Zurück zum Zitat Liebchen C, Schachtebeck M, Schöbel A, Stiller S, Prigge A (2010) Computing delay resistant railway timetables. Comput Oper Res 37(5):857–868CrossRef Liebchen C, Schachtebeck M, Schöbel A, Stiller S, Prigge A (2010) Computing delay resistant railway timetables. Comput Oper Res 37(5):857–868CrossRef
Zurück zum Zitat Lindner T (2000) Train schedule optimization in public rail transport. Ph.D. Thesis, University of Technology, Braunschweig Lindner T (2000) Train schedule optimization in public rail transport. Ph.D. Thesis, University of Technology, Braunschweig
Zurück zum Zitat Lindner T, Zimmermann UT (2005) Cost optimal periodic train scheduling. Math Methods Oper Res 62:281–295CrossRef Lindner T, Zimmermann UT (2005) Cost optimal periodic train scheduling. Math Methods Oper Res 62:281–295CrossRef
Zurück zum Zitat Lusby RM, Larsen J, Ehrgott M, Ryan D (2011) Railway track allocation: models and methods. OR Spectr 33(4):843–883CrossRef Lusby RM, Larsen J, Ehrgott M, Ryan D (2011) Railway track allocation: models and methods. OR Spectr 33(4):843–883CrossRef
Zurück zum Zitat Lusby RM, Larsen J, Ehrgott M, Ryan DM (2013) A set-packing inspired method for real-time junction train routing. Comput Oper Res 40:713–724CrossRef Lusby RM, Larsen J, Ehrgott M, Ryan DM (2013) A set-packing inspired method for real-time junction train routing. Comput Oper Res 40:713–724CrossRef
Zurück zum Zitat Mannino C, Mascis A (2009) Optimal real-time traffic control in metro stations. Oper Res 57(4):1026–1039CrossRef Mannino C, Mascis A (2009) Optimal real-time traffic control in metro stations. Oper Res 57(4):1026–1039CrossRef
Zurück zum Zitat Mascis A, Pacciarelli D (2002) Job-shop scheduling with blocking and no-wait constraints. Eur J Oper Res 143(3):498–517CrossRef Mascis A, Pacciarelli D (2002) Job-shop scheduling with blocking and no-wait constraints. Eur J Oper Res 143(3):498–517CrossRef
Zurück zum Zitat Nachtigall K (1994) A branch-and-cut approach for periodic network programming. Technical report 29, Hildesheimer Informatik-Berichte Nachtigall K (1994) A branch-and-cut approach for periodic network programming. Technical report 29, Hildesheimer Informatik-Berichte
Zurück zum Zitat Nemhauser GL, Wolsey LA (1988) Integer and combinatorial optimization (Vol. 18). Wiley, New York Nemhauser GL, Wolsey LA (1988) Integer and combinatorial optimization (Vol. 18). Wiley, New York
Zurück zum Zitat Odijk M (1996) A constraint generation algorithm for the construction of periodic railway timetables. Transp Res Part B 30:455–464CrossRef Odijk M (1996) A constraint generation algorithm for the construction of periodic railway timetables. Transp Res Part B 30:455–464CrossRef
Zurück zum Zitat Oliveira E, Smith BM (2000) A job-shop scheduling model for the single-track railway scheduling problem. Technical Report 2000.21, School of Computing Research Report, University of Leeds Oliveira E, Smith BM (2000) A job-shop scheduling model for the single-track railway scheduling problem. Technical Report 2000.21, School of Computing Research Report, University of Leeds
Zurück zum Zitat Peeters LWP (2003) Cyclic railway timetable optimization. Ph.D Thesis, Erasmus Research Institute of Management, Erasmus University Rotterdam Peeters LWP (2003) Cyclic railway timetable optimization. Ph.D Thesis, Erasmus Research Institute of Management, Erasmus University Rotterdam
Zurück zum Zitat Peeters LWP, Kroon LG (2001) A cycle based optimization model for the cyclic railway timetabling problem. In: Daduna J, Voss S (eds) Computer-aided transit scheduling, lecture notes in economics and mathematical systems, vol 505. Springer, Berlin, pp 275–296 Peeters LWP, Kroon LG (2001) A cycle based optimization model for the cyclic railway timetabling problem. In: Daduna J, Voss S (eds) Computer-aided transit scheduling, lecture notes in economics and mathematical systems, vol 505. Springer, Berlin, pp 275–296
Zurück zum Zitat Schlechte T, Borndörfer R (2010) Balancing efficiency and robustness-A Bi-criteria optimization approach to railway track allocation. In: Ehrgott M, Naujoks B, Stewart TJ, Wallenius J (eds) Multiple criteria decision making for sustainable energy and transportation systems, lecture notes in economics and mathematical systems, vol 634. Springer, Berlin, pp 105–116 Schlechte T, Borndörfer R (2010) Balancing efficiency and robustness-A Bi-criteria optimization approach to railway track allocation. In: Ehrgott M, Naujoks B, Stewart TJ, Wallenius J (eds) Multiple criteria decision making for sustainable energy and transportation systems, lecture notes in economics and mathematical systems, vol 634. Springer, Berlin, pp 105–116
Zurück zum Zitat Schöbel A (2009) Capacity constraints in delay management. Public Transport 1(2):135–154CrossRef Schöbel A (2009) Capacity constraints in delay management. Public Transport 1(2):135–154CrossRef
Zurück zum Zitat Schöbel A, Kratz A (2009) A bicriteria approach for robust timetabling. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science 5868. Springer, Berlin Heidelberg, pp 119–144 Schöbel A, Kratz A (2009) A bicriteria approach for robust timetabling. In: Ahuja RK, Moehring R, Zaroliagis C (eds) Robust and online large-scale optimization, lecture notes in computer science 5868. Springer, Berlin Heidelberg, pp 119–144
Zurück zum Zitat Schrijver A, Steenbeek A (1994) Timetable construction for railned. Technical report, CWI, Amsterdam, (in Dutch) Schrijver A, Steenbeek A (1994) Timetable construction for railned. Technical report, CWI, Amsterdam, (in Dutch)
Zurück zum Zitat Serafini P, Ukovich W (1989) A mathematical model for periodic event scheduling problems. SIAM J Discret Math 2:550–581CrossRef Serafini P, Ukovich W (1989) A mathematical model for periodic event scheduling problems. SIAM J Discret Math 2:550–581CrossRef
Zurück zum Zitat Szpigel B (1973) Optimal train scheduling on a single track railway. In: Ross M (ed) OR’72. North-Holland, Amsterdam, pp 343–351 Szpigel B (1973) Optimal train scheduling on a single track railway. In: Ross M (ed) OR’72. North-Holland, Amsterdam, pp 343–351
Zurück zum Zitat Veelenturf LP, Potthoff D, Huisman D, Kroon LG (2012) Railway crew rescheduling with retiming. Transp Res Part C 20:95–110CrossRef Veelenturf LP, Potthoff D, Huisman D, Kroon LG (2012) Railway crew rescheduling with retiming. Transp Res Part C 20:95–110CrossRef
Zurück zum Zitat Walker CG, Snowdon JN, Ryan DM (2005) Simultaneous disruption recovery of a train timetable and crew roster in real time. Comput Oper Res 32:2077–2094CrossRef Walker CG, Snowdon JN, Ryan DM (2005) Simultaneous disruption recovery of a train timetable and crew roster in real time. Comput Oper Res 32:2077–2094CrossRef
Zurück zum Zitat Zwaneveld PJ (1997) Railway planning and allocation of passenger lines. Ph.D. Thesis, Rotterdam School of Management Zwaneveld PJ (1997) Railway planning and allocation of passenger lines. Ph.D. Thesis, Rotterdam School of Management
Zurück zum Zitat Zwaneveld PJ, Kroon LG, van Hoesel CPM (2001) Routing trains through a railway station based on a node packing model. Eur J Oper Res 128:14–33CrossRef Zwaneveld PJ, Kroon LG, van Hoesel CPM (2001) Routing trains through a railway station based on a node packing model. Eur J Oper Res 128:14–33CrossRef
Zurück zum Zitat Zwaneveld PJ, Kroon LG, Romeijn HE, Salomon M, Dauzere-Peres S, van Hoesel CPM, Ambergen HW (1996) Routing trains through railway stations: model formulation and algorithm. Transp Sci 30:181–194CrossRef Zwaneveld PJ, Kroon LG, Romeijn HE, Salomon M, Dauzere-Peres S, van Hoesel CPM, Ambergen HW (1996) Routing trains through railway stations: model formulation and algorithm. Transp Sci 30:181–194CrossRef
Metadaten
Titel
A tutorial on non-periodic train timetabling and platforming problems
verfasst von
Valentina Cacchiani
Laura Galli
Paolo Toth
Publikationsdatum
01.09.2015
Verlag
Springer Berlin Heidelberg
Erschienen in
EURO Journal on Transportation and Logistics / Ausgabe 3/2015
Print ISSN: 2192-4376
Elektronische ISSN: 2192-4384
DOI
https://doi.org/10.1007/s13676-014-0046-4