Skip to main content

2015 | OriginalPaper | Buchkapitel

An Integrated Approach for Progress Tracking in Liquefied Natural Gas Construction

verfasst von : Jun Wang, Wenchi Shou, Xiangyu Wang, Hung-Lin Chi

Erschienen in: Cooperative Design, Visualization, and Engineering

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Progress tracking is an essential management function for successful delivery of Liquefied Natural Gas (LNG) projects. It relies on accurate and prompt data collection from construction sites and project participants, which is then used to early detect actual or potential schedule delay. Currently, many Information Technology (IT)-supported methods have been implemented to improve progress tracking. However, none of them has been able to deliver satisfactory and reliable information. This paper aims to develop an integrated approach for construction progress tracking by integrating laser scanning, Building Information Modeling, mobile computing and Radio Frequency Identification. The approach consists of three modules: milestone progress tracking, onsite activity/Task progress tracking, and supply chain tracking. Finally, a pilot LNG project was selected to validate this approach.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Ellis, M., Heyning, C., Legrand, O.: Extending the LNG boom: improving Australian LNG productivity and competitiveness. McKinsey Global Institute, Report (2013) Ellis, M., Heyning, C., Legrand, O.: Extending the LNG boom: improving Australian LNG productivity and competitiveness. McKinsey Global Institute, Report (2013)
2.
Zurück zum Zitat Halpin, D.W.: Construction Management. Wiley, Hoboken (2010) Halpin, D.W.: Construction Management. Wiley, Hoboken (2010)
3.
Zurück zum Zitat Dong, N., Fischer, M., Haddad, Z., Levitt, R.: A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects. Autom. Constr. 35, 157–173 (2013) Dong, N., Fischer, M., Haddad, Z., Levitt, R.: A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects. Autom. Constr. 35, 157–173 (2013)
4.
Zurück zum Zitat Turkan, Y., Bosche, F., Haas, C.T., Haas, R.: Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22, 414–421 (2012)CrossRef Turkan, Y., Bosche, F., Haas, C.T., Haas, R.: Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22, 414–421 (2012)CrossRef
5.
Zurück zum Zitat El-Omari, S., Moselhi, O.: Integrating automated data acquisition technologies for progress reporting of construction projects. Autom. Constr. 20(6), 699–705 (2011)CrossRef El-Omari, S., Moselhi, O.: Integrating automated data acquisition technologies for progress reporting of construction projects. Autom. Constr. 20(6), 699–705 (2011)CrossRef
6.
Zurück zum Zitat Chi, H.-L., Wang, J., Wang, X., Truijens, M., Yung, P.: A conceptual framework of quality-assured fabrication, delivery and installation processes for liquefied natural gas (LNG) plant construction. J. Intell. Rob. Syst. 1–16 (2014) Chi, H.-L., Wang, J., Wang, X., Truijens, M., Yung, P.: A conceptual framework of quality-assured fabrication, delivery and installation processes for liquefied natural gas (LNG) plant construction. J. Intell. Rob. Syst. 1–16 (2014)
7.
Zurück zum Zitat Wang, J., Sun, W., Shou, W., Wang, X., Wu, C., Chong, H.-Y., Liu, Y., Sun, C.: Integrating BIM and LiDAR for real-time construction quality control. J. Intell. Rob. Syst. 1–16 (2014) Wang, J., Sun, W., Shou, W., Wang, X., Wu, C., Chong, H.-Y., Liu, Y., Sun, C.: Integrating BIM and LiDAR for real-time construction quality control. J. Intell. Rob. Syst. 1–16 (2014)
8.
Zurück zum Zitat Kiziltas, S., Akinci, B.: The need for prompt schedule update by utilizing reality capture technologies: a case study. In: Proceedings of Construction Research Congress, San Diego, CA (2005) Kiziltas, S., Akinci, B.: The need for prompt schedule update by utilizing reality capture technologies: a case study. In: Proceedings of Construction Research Congress, San Diego, CA (2005)
9.
Zurück zum Zitat Azimi, R., Lee, S., AbouRizk, S.M., Alvanchi, A.: A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 20(1), 88–97 (2011)CrossRef Azimi, R., Lee, S., AbouRizk, S.M., Alvanchi, A.: A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 20(1), 88–97 (2011)CrossRef
10.
Zurück zum Zitat Song, L., Eldin, N.N.: Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. Autom. Constr. 27, 32–39 (2012)CrossRef Song, L., Eldin, N.N.: Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. Autom. Constr. 27, 32–39 (2012)CrossRef
11.
Zurück zum Zitat Cheng, J.C., Law, K.H., Bjornsson, H., Jones, A., Sriram, R.: A service oriented framework for construction supply chain integration. Autom. Constr. 19(2), 245–260 (2010)CrossRef Cheng, J.C., Law, K.H., Bjornsson, H., Jones, A., Sriram, R.: A service oriented framework for construction supply chain integration. Autom. Constr. 19(2), 245–260 (2010)CrossRef
12.
Zurück zum Zitat Chou, J.-S., Chen, H.-M., Hou, C.-C., Lin, C.-W.: Visualized EVM system for assessing project performance. Autom. Constr. 19(5), 596–607 (2010)CrossRef Chou, J.-S., Chen, H.-M., Hou, C.-C., Lin, C.-W.: Visualized EVM system for assessing project performance. Autom. Constr. 19(5), 596–607 (2010)CrossRef
13.
Zurück zum Zitat Akhavian, R., Behzadan, A.H.: An integrated data collection and analysis framework for remote monitoring and planning of construction operations. Adv. Eng. Inform. 26(4), 749–761 (2012)CrossRef Akhavian, R., Behzadan, A.H.: An integrated data collection and analysis framework for remote monitoring and planning of construction operations. Adv. Eng. Inform. 26(4), 749–761 (2012)CrossRef
14.
Zurück zum Zitat Yang, Y.-C., Park, C.-J., Kim, J.-H., Kim, J.-J.: Management of daily progress in a construction project of multiple apartment buildings. J. Constr. Eng. Manage. 133(3), 242–253 (2007)CrossRef Yang, Y.-C., Park, C.-J., Kim, J.-H., Kim, J.-J.: Management of daily progress in a construction project of multiple apartment buildings. J. Constr. Eng. Manage. 133(3), 242–253 (2007)CrossRef
15.
Zurück zum Zitat Cheng, T., Teizer, J.: Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Autom. Constr. 34, 3–15 (2013)CrossRef Cheng, T., Teizer, J.: Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Autom. Constr. 34, 3–15 (2013)CrossRef
16.
Zurück zum Zitat Koo, B., Fischer, M.: Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 126(4), 251–260 (2000)CrossRef Koo, B., Fischer, M.: Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manage. 126(4), 251–260 (2000)CrossRef
17.
Zurück zum Zitat Wang, J., Wang, X., Shou, W., Xu, B.: Integrating BIM and augmented reality for interactive architectural visualisation. Constr. Innov. 14(4), 453–476 (2014)CrossRef Wang, J., Wang, X., Shou, W., Xu, B.: Integrating BIM and augmented reality for interactive architectural visualisation. Constr. Innov. 14(4), 453–476 (2014)CrossRef
18.
Zurück zum Zitat Shou, W., Wang, J., Wang, X., Chong, H.Y.: A comparative review of building information modelling implementation in building and infrastructure industries. Arch. Comput. Methods Eng. 22(2), 291–308 (2015) Shou, W., Wang, J., Wang, X., Chong, H.Y.: A comparative review of building information modelling implementation in building and infrastructure industries. Arch. Comput. Methods Eng. 22(2), 291–308 (2015)
19.
Zurück zum Zitat Hou, L., Wang, X., Wang, J., Truijens, M.: An integration framework of advanced technologies for productivity improvement for LNG mega-projects. J. Inf. Technol. Constr. 19, 360–382 (2014) Hou, L., Wang, X., Wang, J., Truijens, M.: An integration framework of advanced technologies for productivity improvement for LNG mega-projects. J. Inf. Technol. Constr. 19, 360–382 (2014)
20.
Zurück zum Zitat Thorp, J.: The Information Paradox – Realizing the Business Benefits of Information Technology. McGraw-Hill, Toronto (2003) Thorp, J.: The Information Paradox – Realizing the Business Benefits of Information Technology. McGraw-Hill, Toronto (2003)
Metadaten
Titel
An Integrated Approach for Progress Tracking in Liquefied Natural Gas Construction
verfasst von
Jun Wang
Wenchi Shou
Xiangyu Wang
Hung-Lin Chi
Copyright-Jahr
2015
DOI
https://doi.org/10.1007/978-3-319-24132-6_33

Neuer Inhalt