Skip to main content

2021 | OriginalPaper | Buchkapitel

An Optimal Maintenance Cycle Decision of Relay Protection Device Based on Weibull Distribution Model

verfasst von : Qiuyu Zhuang, Meiju Liu

Erschienen in: Advances in Simulation and Process Modelling

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In view of the problem that there is no accurate optimal maintenance cycle for relay protection device, this paper is based on the Weibull distribution model. We firstly analyze the maintenance cycle data, assume and establish a distribution model, use the least square method combined with a genetic algorithm to estimate the parameters of the Weibull distribution. Then, we use MATLAB to determine the device failure rate function. Finally, we use the fuzzy decision method to get the optimal maintenance cycle for the devices. According to the optimal maintenance cycle, we can develop more appropriate state maintenance strategy and effectively support the state maintenance work.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Gao, X.: Application technology of relay protection status maintenance. China Electric Power Press, Beijing (2008) Gao, X.: Application technology of relay protection status maintenance. China Electric Power Press, Beijing (2008)
2.
Zurück zum Zitat Kumm, J.J., WeBer, M.S., Schweiter, E.O.: Predicting the option routine test interval for protective relays. IEEE Trans. Power Del. 10(2), 659–664 (1995)CrossRef Kumm, J.J., WeBer, M.S., Schweiter, E.O.: Predicting the option routine test interval for protective relays. IEEE Trans. Power Del. 10(2), 659–664 (1995)CrossRef
3.
Zurück zum Zitat Lai, C.D., Xie, M., Murthy, D.N.P.: A modified Weibull distribution. IEEE Trans. Reliab. 52(1), 33–37 (2003)CrossRef Lai, C.D., Xie, M., Murthy, D.N.P.: A modified Weibull distribution. IEEE Trans. Reliab. 52(1), 33–37 (2003)CrossRef
4.
Zurück zum Zitat Chen, S., Gui, W.: Statistical analysis of a lifetime distribution with a bathtub-shaped failure rate function under adaptive progressive type-II censoring. Mathematics 8(5) (2020) Chen, S., Gui, W.: Statistical analysis of a lifetime distribution with a bathtub-shaped failure rate function under adaptive progressive type-II censoring. Mathematics 8(5) (2020)
5.
Zurück zum Zitat Zhang, Z.H.: Reliability Theory and Engineering Application. Science Press, Beijing (2012) Zhang, Z.H.: Reliability Theory and Engineering Application. Science Press, Beijing (2012)
6.
Zurück zum Zitat Yang, J., Lv, Z., Shi, H., Tan, S.: Performance monitoring method based on balanced partial least square and statistics pattern analysis. ISA Trans. 81, 121–131 (2018)CrossRef Yang, J., Lv, Z., Shi, H., Tan, S.: Performance monitoring method based on balanced partial least square and statistics pattern analysis. ISA Trans. 81, 121–131 (2018)CrossRef
7.
Zurück zum Zitat Xu, W., Chen, W.: Feasibility study on the least square method for fitting non-gaussian noise data. Phys. A 492, 1917–1930 (2018)CrossRef Xu, W., Chen, W.: Feasibility study on the least square method for fitting non-gaussian noise data. Phys. A 492, 1917–1930 (2018)CrossRef
8.
Zurück zum Zitat Wais, P.: Two and three-parameter Weibull distribution in available wind power analysis. Renew. Energ. 103, 15–29 (2017)CrossRef Wais, P.: Two and three-parameter Weibull distribution in available wind power analysis. Renew. Energ. 103, 15–29 (2017)CrossRef
9.
Zurück zum Zitat Kim, H., Singh, C.: Power system reliability modeling with aging using thinning algorithm. IEEE Bucharest Power Tech. Conf. 1, 1–6 (2009) Kim, H., Singh, C.: Power system reliability modeling with aging using thinning algorithm. IEEE Bucharest Power Tech. Conf. 1, 1–6 (2009)
10.
Zurück zum Zitat Dehghanian, P., Guan, Y., Kezunovic, M.: Real-time life-cycle assessment of high-voltage circuit breakers for maintenance using online condition monitoring data. IEEE Trans. Ind. Appl. 55(2), 1135–1146 (2018)CrossRef Dehghanian, P., Guan, Y., Kezunovic, M.: Real-time life-cycle assessment of high-voltage circuit breakers for maintenance using online condition monitoring data. IEEE Trans. Ind. Appl. 55(2), 1135–1146 (2018)CrossRef
11.
Zurück zum Zitat Matinez-Soto, R., Rodriguez, A., Castillo, O., Aguilar, L.T.: Gain optimization for inertia wheel pendulum stabilization using particle swarm optimization and genetic algorithms. Int. J. Innovative Comput. Inf. Control. 8(6), 4421–4430 (2012) Matinez-Soto, R., Rodriguez, A., Castillo, O., Aguilar, L.T.: Gain optimization for inertia wheel pendulum stabilization using particle swarm optimization and genetic algorithms. Int. J. Innovative Comput. Inf. Control. 8(6), 4421–4430 (2012)
12.
Zurück zum Zitat Zhang, G., Wang, X., Liang, Y.C., Liu, J.: Fast and robust spectrum sensing via Kolmogorov-Smirnov test. IEEE Trans. Commun. 58(12), 3410–3416 (2010)CrossRef Zhang, G., Wang, X., Liang, Y.C., Liu, J.: Fast and robust spectrum sensing via Kolmogorov-Smirnov test. IEEE Trans. Commun. 58(12), 3410–3416 (2010)CrossRef
13.
Zurück zum Zitat Savsar, M.: Realiability analysis of a flexible manufacturing cell. Reliab. Eng. Syst. Safety. 67(2), 147–152 (2000)CrossRef Savsar, M.: Realiability analysis of a flexible manufacturing cell. Reliab. Eng. Syst. Safety. 67(2), 147–152 (2000)CrossRef
14.
Zurück zum Zitat Propst, J.E., Doan, D.R.: Improvements in modeling and evaluation of electrical power system reliability. IEEE Trans. Ind. Appl. 37(5), 1413–1422 (2001)CrossRef Propst, J.E., Doan, D.R.: Improvements in modeling and evaluation of electrical power system reliability. IEEE Trans. Ind. Appl. 37(5), 1413–1422 (2001)CrossRef
15.
Zurück zum Zitat Zamzuri, H., Zolotas, A., Goodall, R., Malzan, S.A.: Advances in tilt control design of high-speed railway vehicles: a study on fuzzy control methods. Int. J. Innovative Comput. Inf. Control. 8(9), 6076–6080 (2012) Zamzuri, H., Zolotas, A., Goodall, R., Malzan, S.A.: Advances in tilt control design of high-speed railway vehicles: a study on fuzzy control methods. Int. J. Innovative Comput. Inf. Control. 8(9), 6076–6080 (2012)
Metadaten
Titel
An Optimal Maintenance Cycle Decision of Relay Protection Device Based on Weibull Distribution Model
verfasst von
Qiuyu Zhuang
Meiju Liu
Copyright-Jahr
2021
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-33-4575-1_39