Abstract

TNEP is one of the important parts of power system planning which determines the number, time, and location of new lines for adding to transmission network. It is a hard, large-scale and highly nonlinear combinatorial optimization problem that can be solved by classic, nonclassic or heuristic methods. Classic methods like linear programming and Bender decomposition are only based on mathematical principles, but their difficulty is that if the scale of problem is large, it is very difficult to find accurate and reasonable solutions. Contrary to classic methods, nonclassic ones such as evolutionary algorithms like GAs are not based on mathematical rules and simply can be applied for solution of complex problems. GA is a random search method that has demonstrated the ability to deal with nonconvex, nonlinear, integer-mixed optimization problems like the STNEP problem. Although global optimization techniques like GA to be good methods for the solution of TNEP problem, however, when the system has a highly epistatic objective function and number of parameters to be optimized is large, then they have degraded efficiency to obtain global optimum solution and also simulation process use a lot of computing time. Heuristic methods like PSO can improve speed and accuracy of the solution program. PSO is a novel population-based heuristic that is a useful tool for engineering optimization. Unlike the other heuristic techniques, it has a flexible and well-balanced mechanism to enhance the global and local exploration abilities. In this chapter, first we review some research in the field of TNEP. Then, the method of mathematical modeling for TNEP problem is presented. Afterward, GA and PSO algorithms are described completely. Finally, effective parameters on network losses with a few examples are introduced.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Fußnoten
1
Benders hierarchical decomposition approach.
 
Literatur
1.
Zurück zum Zitat Abdelaziz AR (2000) Genetic algorithm based power transmission expansion planning. 7th IEEE Int Conf Electron Circuits and Syst 2:642–645 Abdelaziz AR (2000) Genetic algorithm based power transmission expansion planning. 7th IEEE Int Conf Electron Circuits and Syst 2:642–645
2.
Zurück zum Zitat Levi VA, Calovic MS (1993) Linear-programming-based decomposition method for optimal planning of transmission network investments. IEE Proc Gener Transm Distrib 140:516–522CrossRef Levi VA, Calovic MS (1993) Linear-programming-based decomposition method for optimal planning of transmission network investments. IEE Proc Gener Transm Distrib 140:516–522CrossRef
3.
Zurück zum Zitat Binato S, de Oliveira GC, Araujo JL (2001) A greedy randomized adaptive search procedure for transmission expansion planning. IEEE Trans Power Syst 16:247–253CrossRef Binato S, de Oliveira GC, Araujo JL (2001) A greedy randomized adaptive search procedure for transmission expansion planning. IEEE Trans Power Syst 16:247–253CrossRef
4.
Zurück zum Zitat Choi J, Mount T, Thomas R (2006) Transmission system expansion plans in view point of deterministic, probabilistic and security reliability criteria. The 39th Hawaii Int Conf Syst Sci 10:1–10 Choi J, Mount T, Thomas R (2006) Transmission system expansion plans in view point of deterministic, probabilistic and security reliability criteria. The 39th Hawaii Int Conf Syst Sci 10:1–10
5.
Zurück zum Zitat Silva IDJ, Rider MJ, Romero R, Murari CA (2005) Transmission network expansion planning considering uncertainness in demand. Power Eng Soc Gen Meet 2:1424–1429 Silva IDJ, Rider MJ, Romero R, Murari CA (2005) Transmission network expansion planning considering uncertainness in demand. Power Eng Soc Gen Meet 2:1424–1429
6.
Zurück zum Zitat Binato S, Periera MVF, Granville S (2001) A new Benders decomposition approach to solve power transmission network design problems. IEEE Trans Power Syst 16:235–240CrossRef Binato S, Periera MVF, Granville S (2001) A new Benders decomposition approach to solve power transmission network design problems. IEEE Trans Power Syst 16:235–240CrossRef
7.
Zurück zum Zitat Escobar AH, Gallego RA, Romero R (2004) Multistage and coordinated planning of the expansion of transmission systems. IEEE Trans Power Syst 19:735–744CrossRef Escobar AH, Gallego RA, Romero R (2004) Multistage and coordinated planning of the expansion of transmission systems. IEEE Trans Power Syst 19:735–744CrossRef
8.
Zurück zum Zitat Dodu JC, Merlin A (1981) Dynamic model for long-term expansion planning studies of power transmission systems: The Ortie model. Int J Electr Power & Energy Syst 3:2–16CrossRef Dodu JC, Merlin A (1981) Dynamic model for long-term expansion planning studies of power transmission systems: The Ortie model. Int J Electr Power & Energy Syst 3:2–16CrossRef
9.
Zurück zum Zitat Garver LL (1970) Transmission net estimation using linear programming. IEEE Trans Power Appar Syst PAS-89:1688–1696 Garver LL (1970) Transmission net estimation using linear programming. IEEE Trans Power Appar Syst PAS-89:1688–1696
10.
Zurück zum Zitat Chanda RS, Bhattacharjee PK (1995) A reliability approach to transmission expansion planning using minimal cut theory. Electr Power Syst Res 33:111–117CrossRef Chanda RS, Bhattacharjee PK (1995) A reliability approach to transmission expansion planning using minimal cut theory. Electr Power Syst Res 33:111–117CrossRef
11.
Zurück zum Zitat Chanda RS, Bhattacharjee PK (1998) A reliability approach to transmission expansion planning using fuzzy fault-tree model. Electr Power Syst Res 45:101–108CrossRef Chanda RS, Bhattacharjee PK (1998) A reliability approach to transmission expansion planning using fuzzy fault-tree model. Electr Power Syst Res 45:101–108CrossRef
12.
Zurück zum Zitat Sohtaoglu NH (1998) The effect of economic parameters on power transmission planning. 9th Mediterr Electrotech Conf 2:941–945 Sohtaoglu NH (1998) The effect of economic parameters on power transmission planning. 9th Mediterr Electrotech Conf 2:941–945
13.
Zurück zum Zitat Granville S, Pereira MVF et al (1988) Mathematical decomposition techniques for power system expansion planning-analysis of the linearized power flow model using the benders decomposition technique. EPRI, Technical Report, RP, pp 2473–2476 Granville S, Pereira MVF et al (1988) Mathematical decomposition techniques for power system expansion planning-analysis of the linearized power flow model using the benders decomposition technique. EPRI, Technical Report, RP, pp 2473–2476
14.
Zurück zum Zitat Romero R, Monticelli A (1994) A hierarchical decomposition approach for transmission network expansion planning. IEEE Trans Power Syst 9:373–380CrossRef Romero R, Monticelli A (1994) A hierarchical decomposition approach for transmission network expansion planning. IEEE Trans Power Syst 9:373–380CrossRef
15.
Zurück zum Zitat Lee STY, Hocks KL, Hnyilicza H (1970) Transmission expansion of branch and bound integer programming with optimal cost capacity curves. IEEE Trans Power Appar Syst PAS-93:1390–1400 Lee STY, Hocks KL, Hnyilicza H (1970) Transmission expansion of branch and bound integer programming with optimal cost capacity curves. IEEE Trans Power Appar Syst PAS-93:1390–1400
16.
Zurück zum Zitat Periera MVF, Pinto L (1985) Application of sensitivity analysis of load supplying capacity to interactive transmission expansion planning. IEEE Trans Power Appar Syst PAS-104:381-389 Periera MVF, Pinto L (1985) Application of sensitivity analysis of load supplying capacity to interactive transmission expansion planning. IEEE Trans Power Appar Syst PAS-104:381-389
17.
Zurück zum Zitat Romero R, Gallego RA, Monticelli A (1996) Transmission system expansion planning by simulated annealing. IEEE Trans Power Syst 11:364–369CrossRef Romero R, Gallego RA, Monticelli A (1996) Transmission system expansion planning by simulated annealing. IEEE Trans Power Syst 11:364–369CrossRef
18.
Zurück zum Zitat Gallego RA, Alves AB, Monticelli A, Romero R (1997) Parallel simulated annealing applied to long term transmission network expansion planning. IEEE Trans Power Syst 12:181–188CrossRef Gallego RA, Alves AB, Monticelli A, Romero R (1997) Parallel simulated annealing applied to long term transmission network expansion planning. IEEE Trans Power Syst 12:181–188CrossRef
19.
Zurück zum Zitat Al-Saba T, El-Amin I (2002) The application of artificial intelligent tools to the transmission expansion problem. Electr Power Syst Res 62:117–126CrossRef Al-Saba T, El-Amin I (2002) The application of artificial intelligent tools to the transmission expansion problem. Electr Power Syst Res 62:117–126CrossRef
20.
Zurück zum Zitat Contreras J, Wu FF (2000) A kernel-oriented algorithm for transmission expansion planning. IEEE Trans Power Syst 15:1434–1440CrossRef Contreras J, Wu FF (2000) A kernel-oriented algorithm for transmission expansion planning. IEEE Trans Power Syst 15:1434–1440CrossRef
21.
Zurück zum Zitat Silva EL, Gil HA, Areiza JM (2000) Transmission network expansion planning under an improved genetic algorithm. IEEE Trans Power Syst 15:1168–1174CrossRef Silva EL, Gil HA, Areiza JM (2000) Transmission network expansion planning under an improved genetic algorithm. IEEE Trans Power Syst 15:1168–1174CrossRef
22.
Zurück zum Zitat Silva EL, Oritz JMA, Oleveria GC, Binato S (2001) Transmission network expansion planning under a Tabu search approach. IEEE Trans Power Syst 16:62–68CrossRef Silva EL, Oritz JMA, Oleveria GC, Binato S (2001) Transmission network expansion planning under a Tabu search approach. IEEE Trans Power Syst 16:62–68CrossRef
23.
Zurück zum Zitat Jalilzadeh S, Kazemi A, Shayeghi H, Mahdavi M (2008) Technical and economic evaluation of voltage level in transmission network expansion planning using GA. Energy Convers Manag 49:1119–1125CrossRef Jalilzadeh S, Kazemi A, Shayeghi H, Mahdavi M (2008) Technical and economic evaluation of voltage level in transmission network expansion planning using GA. Energy Convers Manag 49:1119–1125CrossRef
24.
Zurück zum Zitat Shayeghi H, Jalilzadeh S, Mahdavi M, Haddadian H (2008) Studying influence of two effective parameters on network losses in transmission expansion planning using DCGA. Energy Convers Manag 49:3017–3024CrossRef Shayeghi H, Jalilzadeh S, Mahdavi M, Haddadian H (2008) Studying influence of two effective parameters on network losses in transmission expansion planning using DCGA. Energy Convers Manag 49:3017–3024CrossRef
25.
Zurück zum Zitat Shayeghi H, Mahdavi M, Bagheri A (2010) Discrete PSO algorithm based optimization of transmission lines loading in TNEP problem. Energy Convers Manag 51:112–121CrossRef Shayeghi H, Mahdavi M, Bagheri A (2010) Discrete PSO algorithm based optimization of transmission lines loading in TNEP problem. Energy Convers Manag 51:112–121CrossRef
26.
Zurück zum Zitat Shayeghi H, Mahdavi M, Bagheri A (2010) An improved DPSO with mutation based on similarity algorithm for optimization of transmission lines loading. Energy Convers Manag 51:2715–2723CrossRef Shayeghi H, Mahdavi M, Bagheri A (2010) An improved DPSO with mutation based on similarity algorithm for optimization of transmission lines loading. Energy Convers Manag 51:2715–2723CrossRef
27.
Zurück zum Zitat Contreras J, Wu FF (2000) A kernel-oriented algorithm for transmission expansion planning. IEEE Trans Power Syst 15:1434–1440CrossRef Contreras J, Wu FF (2000) A kernel-oriented algorithm for transmission expansion planning. IEEE Trans Power Syst 15:1434–1440CrossRef
28.
Zurück zum Zitat Braga ASD, Saraiva JT (2005) A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation. IEEE Trans Power Syst 20:1631–1639CrossRef Braga ASD, Saraiva JT (2005) A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation. IEEE Trans Power Syst 20:1631–1639CrossRef
29.
Zurück zum Zitat Sepasian MS, Seifi H, Foroud AA, Hatami AR (2009) A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs. IEEE Trans Power Syst 24:1609–1618CrossRef Sepasian MS, Seifi H, Foroud AA, Hatami AR (2009) A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs. IEEE Trans Power Syst 24:1609–1618CrossRef
30.
Zurück zum Zitat Bulent Tor O, Guven AN, Shahidehpour M (2008) Congestion-driven transmission planning considering the impact of generator expansion. IEEE Trans Power Syst 23:781–789CrossRef Bulent Tor O, Guven AN, Shahidehpour M (2008) Congestion-driven transmission planning considering the impact of generator expansion. IEEE Trans Power Syst 23:781–789CrossRef
31.
Zurück zum Zitat Mahdavi M, Shayeghi H, Kazemi A (2009) DCGA based evaluating role of bundle lines in TNEP considering expansion of substations from voltage level point of view. Energy Convers Manag 50:2067–2073CrossRef Mahdavi M, Shayeghi H, Kazemi A (2009) DCGA based evaluating role of bundle lines in TNEP considering expansion of substations from voltage level point of view. Energy Convers Manag 50:2067–2073CrossRef
32.
Zurück zum Zitat Sum-Im T, Taylor GA, Irving MR, Song YH (2009) Differential evolution algorithm for static and multistage transmission expansion planning. IET Gener Transm Distrib 3:365–384CrossRef Sum-Im T, Taylor GA, Irving MR, Song YH (2009) Differential evolution algorithm for static and multistage transmission expansion planning. IET Gener Transm Distrib 3:365–384CrossRef
33.
Zurück zum Zitat Shayeghi H, Mahdavi M (2009) Genetic algorithm based studying of bundle lines effect on network losses in transmission network expansion planning. J Electr Eng 60:237–245 Shayeghi H, Mahdavi M (2009) Genetic algorithm based studying of bundle lines effect on network losses in transmission network expansion planning. J Electr Eng 60:237–245
34.
Zurück zum Zitat Eldershaw C (2000) A brief Survey of genetic algorithms as applied to non-linear optimization. Technical Report, University of Queensland, pp 1–14 Eldershaw C (2000) A brief Survey of genetic algorithms as applied to non-linear optimization. Technical Report, University of Queensland, pp 1–14
35.
Zurück zum Zitat Chipperfield A, Fleming P, Pohlheim H, Fonseca C (1994) Genetic algorithms toolbox for use with MATLAB®. Users Guide, University of Sheffield, p 1–94 Chipperfield A, Fleming P, Pohlheim H, Fonseca C (1994) Genetic algorithms toolbox for use with MATLAB®. Users Guide, University of Sheffield, p 1–94
36.
Zurück zum Zitat Mitchell M (1995) Genetic algorithms: an overview, Technical Report, vol. 1. Santa Fe Institute, pp 31–39 Mitchell M (1995) Genetic algorithms: an overview, Technical Report, vol. 1. Santa Fe Institute, pp 31–39
37.
Zurück zum Zitat Townsend AAR (2003) Genetic algorithms, A tutorial, pp 1–52 Townsend AAR (2003) Genetic algorithms, A tutorial, pp 1–52
38.
Zurück zum Zitat Shayeghi H, Jalili A, Shayanfar HA (2008) Multi-stage fuzzy load frequency control using PSO. Energy Convers Manag 49:2570–2580CrossRef Shayeghi H, Jalili A, Shayanfar HA (2008) Multi-stage fuzzy load frequency control using PSO. Energy Convers Manag 49:2570–2580CrossRef
39.
Zurück zum Zitat Clerc M, Kennedy J (2002) The particle swarm-explosion, stability, and convergence in a multidimensional complex space. IEEE Trans Evol Comput 6:58–73CrossRef Clerc M, Kennedy J (2002) The particle swarm-explosion, stability, and convergence in a multidimensional complex space. IEEE Trans Evol Comput 6:58–73CrossRef
40.
Zurück zum Zitat Jin YX, Cheng HZ, Yan JYM, Zhang L (2007) New discrete method for particle swarm optimization and its application in transmission network expansion planning. Electr Power Syst Res 77:227–233CrossRef Jin YX, Cheng HZ, Yan JYM, Zhang L (2007) New discrete method for particle swarm optimization and its application in transmission network expansion planning. Electr Power Syst Res 77:227–233CrossRef
41.
Zurück zum Zitat Jin N, Samii YR (2007) Advances in particle swarm optimization for antenna designs: real-number, binary, single-objective and multiobjective implementations. IEEE Trans Antennas Propag 55:556–567CrossRef Jin N, Samii YR (2007) Advances in particle swarm optimization for antenna designs: real-number, binary, single-objective and multiobjective implementations. IEEE Trans Antennas Propag 55:556–567CrossRef
42.
Zurück zum Zitat Mahdavi M, Monsef H, Bagheri A (2012) Lines loading optimization in transmission expansion planning based on binary PSO algorithm. i-manag J Inf Technol 1:24–32 Mahdavi M, Monsef H, Bagheri A (2012) Lines loading optimization in transmission expansion planning based on binary PSO algorithm. i-manag J Inf Technol 1:24–32
43.
Zurück zum Zitat Liu J, Fan X, Qu Z (2007) An improved particle swarm optimization with mutation based on similarity. Third Int Conf Nat Comput 4:824–828 Liu J, Fan X, Qu Z (2007) An improved particle swarm optimization with mutation based on similarity. Third Int Conf Nat Comput 4:824–828
44.
Zurück zum Zitat Trelea IC (2003) The particle swarm optimization algorithm: convergence analysis and parameter selection. Inf Process Lett 85:317–325CrossRefMATHMathSciNet Trelea IC (2003) The particle swarm optimization algorithm: convergence analysis and parameter selection. Inf Process Lett 85:317–325CrossRefMATHMathSciNet
Metadaten
Titel
Application of PSO and GA for Transmission Network Expansion Planning
verfasst von
Hossein Shayeghi
Meisam Mahdavi
Copyright-Jahr
2013
Verlag
Springer London
DOI
https://doi.org/10.1007/978-1-4471-5538-6_6

Neuer Inhalt