Skip to main content

2022 | OriginalPaper | Buchkapitel

Capturing and Transforming Planning Processes for Smart Contracts

verfasst von : Marijana Srećković, Goran Šibenik, Dominik Breitfuß

Erschienen in: Blockchain for Construction

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter presents a conceptual framework for the application of blockchain technology with Building Information Modeling (BIM) in the design phase, with a further use case exploration of Smart Contracts implementation. One of the main challenges in BIM workflows is the traceability of changes within a BIM model and closely coupled with it, the accountability for clearances and the sharing of model information. We argue that the different value chain activities, actors, and digital assets in the design phase could be linked on the basis of Blockchain (BC) and Smart Contracts (SC). Our BIMd.sign framework shows mainly three factors why BC and SC can be considered to deliver benefits to a BIM-based process if implemented: documentation, traceability, and transparency. We argue that the gained information from this analysis will give enough insight to evaluate the needed “level of detail” of repeating acts or sequences, in which traceability through SC can deliver a sufficient supplement respectively optimization for planning processes in the design phase. Furthermore, based on our research, we suggest that possible applications of SC in the design phase require a transformation of existing workflows for the implementation of digital technologies.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Abrishami S, Elghaish F (2019) Revolutionising AEC financial system within project delivery stages: a permissioned blockchain digitalised framework. 36th CIB W 78:2019 Abrishami S, Elghaish F (2019) Revolutionising AEC financial system within project delivery stages: a permissioned blockchain digitalised framework. 36th CIB W 78:2019
3.
Zurück zum Zitat Altay H, Motawa I (2020) An investigation on the applicability of smart contracts in the construction industry. Paper presented at the workshop proceedings Altay H, Motawa I (2020) An investigation on the applicability of smart contracts in the construction industry. Paper presented at the workshop proceedings
4.
Zurück zum Zitat Bore N, Kinai A, Mutahi J, Kaguma D, Otieno F, Remy SL, Weldemariam K (2019) On using blockchain based workflows. In: 2019 IEEE international conference on blockchain and cryptocurrency (ICBC). IEEE, pp 112–116 Bore N, Kinai A, Mutahi J, Kaguma D, Otieno F, Remy SL, Weldemariam K (2019) On using blockchain based workflows. In: 2019 IEEE international conference on blockchain and cryptocurrency (ICBC). IEEE, pp 112–116
5.
Zurück zum Zitat Breitfuß D, Šibenik G, Srećković M (2021) Digital traceability for planning processes. In: ECPPM 2021—eWork and eBusiness in architecture, engineering and construction. In: Proceedings of the 13th European conference on product & process modelling (ECPPM 2021), 15–17 Sept 2021, Moscow, Russia Breitfuß D, Šibenik G, Srećković M (2021) Digital traceability for planning processes. In: ECPPM 2021—eWork and eBusiness in architecture, engineering and construction. In: Proceedings of the 13th European conference on product & process modelling (ECPPM 2021), 15–17 Sept 2021, Moscow, Russia
8.
Zurück zum Zitat Cecconi FR, Dejaco MC, Moretti N, Mannino A, Cadena JDB (2020) Digital asset management. In: Digital transformation of the design, construction and management processes of the built environment. Springer, Cham, pp 243–253 Cecconi FR, Dejaco MC, Moretti N, Mannino A, Cadena JDB (2020) Digital asset management. In: Digital transformation of the design, construction and management processes of the built environment. Springer, Cham, pp 243–253
9.
Zurück zum Zitat Chassiakos A, Sakellaropoulos S (2008) A web-based system for managing construction information. Adv Eng Softw 39(11):865–876CrossRef Chassiakos A, Sakellaropoulos S (2008) A web-based system for managing construction information. Adv Eng Softw 39(11):865–876CrossRef
11.
Zurück zum Zitat DIN EN ISO 21597-1:2021-07-00, Informationscontainer zur Datenübergabe—Austausch-Spezifikationen—Teil 1: Container (ISO 21597-12020); Deutsche Fassung EN ISO 21597-1:2020 DIN EN ISO 21597-1:2021-07-00, Informationscontainer zur Datenübergabe—Austausch-Spezifikationen—Teil 1: Container (ISO 21597-12020); Deutsche Fassung EN ISO 21597-1:2020
12.
Zurück zum Zitat DIN SPEC 91391-1:2019-04 Gemeinsame Datenumgebungen (CDE) für BIM Projekte—Funktionen und offener Datenaustausch zwischen Plattformen unterschiedlicher Hersteller—Teil 1: Module und Funktionen einer Gemeinsamen Datenumgebung, mit digitalem Anhang, Deutsches Institut für Normung e.V. DIN SPEC 91391-1:2019-04 Gemeinsame Datenumgebungen (CDE) für BIM Projekte—Funktionen und offener Datenaustausch zwischen Plattformen unterschiedlicher Hersteller—Teil 1: Module und Funktionen einer Gemeinsamen Datenumgebung, mit digitalem Anhang, Deutsches Institut für Normung e.V.
15.
Zurück zum Zitat Goodhue DL, Thompson RL (1995) Task-technology fit and individual performance. MIS quarterly:213–236 Goodhue DL, Thompson RL (1995) Task-technology fit and individual performance. MIS quarterly:213–236
19.
Zurück zum Zitat ISO (International Organization for Standardization) (2016) ISO 29481-1:2016: building information models—information delivery manual—part 1: methodology and format. ISO, Geneva, Switzerland ISO (International Organization for Standardization) (2016) ISO 29481-1:2016: building information models—information delivery manual—part 1: methodology and format. ISO, Geneva, Switzerland
20.
Zurück zum Zitat ISO (International Organization for Standardization) (2012) ISO 29481-2:2012: Building information models—information delivery manual—part 2: interaction framework. ISO, Geneva, Switzerland ISO (International Organization for Standardization) (2012) ISO 29481-2:2012: Building information models—information delivery manual—part 2: interaction framework. ISO, Geneva, Switzerland
21.
Zurück zum Zitat ISO (International Organization for Standardization) (2018) ISO 19650-2:2018 Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)—information management using building information modelling—part 2: delivery phase of the assets. Geneva, Switzerland ISO (International Organization for Standardization) (2018) ISO 19650-2:2018 Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)—information management using building information modelling—part 2: delivery phase of the assets. Geneva, Switzerland
22.
Zurück zum Zitat Kalsaas BT, Sacks R (2011) Conceptualization of interdependency and coordination between construction tasks. Proceedings of the IGLC-19 Lima, Peru Kalsaas BT, Sacks R (2011) Conceptualization of interdependency and coordination between construction tasks. Proceedings of the IGLC-19 Lima, Peru
24.
Zurück zum Zitat Knotten V, Svalestuen F, Hansen GK, Lædre O (2015) Design management in the building process-a review of current literature. Procedia Econ Finance 21:120–127CrossRef Knotten V, Svalestuen F, Hansen GK, Lædre O (2015) Design management in the building process-a review of current literature. Procedia Econ Finance 21:120–127CrossRef
26.
Zurück zum Zitat LM.VM (2014) In: Lechner H, Heck D (eds) Leistungsmodelle + Vergütungsmodelle. Verlag der Technischen Universität Graz, Graz, Austria LM.VM (2014) In: Lechner H, Heck D (eds) Leistungsmodelle + Vergütungsmodelle. Verlag der Technischen Universität Graz, Graz, Austria
28.
Zurück zum Zitat Mason J (2017) Intelligent contracts and the construction industry. J Leg Aff Disput Resolut Eng Constr 9(3):04517012CrossRef Mason J (2017) Intelligent contracts and the construction industry. J Leg Aff Disput Resolut Eng Constr 9(3):04517012CrossRef
29.
Zurück zum Zitat Mason J, Escott H (2018) Smart contracts in construction: views and perceptions of stakeholders. In: Proceedings of FIG conference, Istanbul May 2018 Mason J, Escott H (2018) Smart contracts in construction: views and perceptions of stakeholders. In: Proceedings of FIG conference, Istanbul May 2018
30.
Zurück zum Zitat Nawari NO, Ravindran S (2019) Blockchain technology and BIM process: review and potential applications. J Inform Technol Constr 24(12):209–238 Nawari NO, Ravindran S (2019) Blockchain technology and BIM process: review and potential applications. J Inform Technol Constr 24(12):209–238
33.
Zurück zum Zitat PMI—Project Management Institute (2017) A guide to the project management body of knowledge (PMBOK guide), 6th edn. Project Management Institute, Pennsylvania, USA PMI—Project Management Institute (2017) A guide to the project management body of knowledge (PMBOK guide), 6th edn. Project Management Institute, Pennsylvania, USA
34.
Zurück zum Zitat Preidel C, Borrmann A, Mattern H, König M, Schapke S-E (2018) Common data environment. In: Borrmann A, König M, Koch C, Beetz J (eds) Building information modeling: technology foundations and industry practice. Springer International Publishing, Cham, pp 279–291CrossRef Preidel C, Borrmann A, Mattern H, König M, Schapke S-E (2018) Common data environment. In: Borrmann A, König M, Koch C, Beetz J (eds) Building information modeling: technology foundations and industry practice. Springer International Publishing, Cham, pp 279–291CrossRef
36.
Zurück zum Zitat Sibenik G, Kovacic I (2020) Assessment of model-based data exchange between architectural design and structural analysis. J Build Eng 32:101589CrossRef Sibenik G, Kovacic I (2020) Assessment of model-based data exchange between architectural design and structural analysis. J Build Eng 32:101589CrossRef
38.
Zurück zum Zitat Sibenik G, Sreckovic M, Radu A (2021) Modular process patterns in the design phase. In: 2021 European conference on computing in construction (EC3). Proceedings of the European conference on computing in construction. Rhodes, Greece, pp 1–9; 26.07.2021–28.07.2021. ISBN 978-3-907234-54-9 Sibenik G, Sreckovic M, Radu A (2021) Modular process patterns in the design phase. In: 2021 European conference on computing in construction (EC3). Proceedings of the European conference on computing in construction. Rhodes, Greece, pp 1–9; 26.07.2021–28.07.2021. ISBN 978-3-907234-54-9
39.
Zurück zum Zitat Singh S, Ashuri B (2019) Leveraging blockchain technology in AEC industry during design development phase. Computing in civil engineering 2019: visualization, information modeling, and simulation. American Society of Civil Engineers Reston, VA, pp 393–401CrossRef Singh S, Ashuri B (2019) Leveraging blockchain technology in AEC industry during design development phase. Computing in civil engineering 2019: visualization, information modeling, and simulation. American Society of Civil Engineers Reston, VA, pp 393–401CrossRef
40.
Zurück zum Zitat Srećković M, Šibenik G, Breitfuß D, Preindl T, Kastner W (2021) Analysis of design phase processes with BIM for blockchain implementation. In: Semenov V, Scherer RJ (eds) ECPPM 2021—eWork and eBusiness in Architecture, Engineering and Construction: Proceedings of the 13th European Conference on Product & Process Modelling (1st edn). CRC Press, London, UK, 2021. https://doi.org/10.1201/9781003191476 Srećković M, Šibenik G, Breitfuß D, Preindl T, Kastner W (2021) Analysis of design phase processes with BIM for blockchain implementation. In: Semenov V, Scherer RJ (eds) ECPPM 2021—eWork and eBusiness in Architecture, Engineering and Construction: Proceedings of the 13th European Conference on Product & Process Modelling (1st edn). CRC Press, London, UK, 2021. https://​doi.​org/​10.​1201/​9781003191476
41.
Zurück zum Zitat Srećković M, Šibenik G, Sigalow K, Ye X, König M, Reitmayer K (2021) Upkeeping digital assets during construction using blockchain technology, paper for the 38th CIB W78 conference on information and communication echnologies for AECO, Luxembourg, 11–15 Oct 2021 Srećković M, Šibenik G, Sigalow K, Ye X, König M, Reitmayer K (2021) Upkeeping digital assets during construction using blockchain technology, paper for the 38th CIB W78 conference on information and communication echnologies for AECO, Luxembourg, 11–15 Oct 2021
42.
Zurück zum Zitat Strnadl CF (2006) Aligning business and IT: the process-driven architecture model. Inf Syst Manag 23(4):67–77CrossRef Strnadl CF (2006) Aligning business and IT: the process-driven architecture model. Inf Syst Manag 23(4):67–77CrossRef
45.
Zurück zum Zitat van Nederveen GA, Tolman FP (1992) Modelling multiple views on buildings. Autom Constr 1(3):215–224CrossRef van Nederveen GA, Tolman FP (1992) Modelling multiple views on buildings. Autom Constr 1(3):215–224CrossRef
Metadaten
Titel
Capturing and Transforming Planning Processes for Smart Contracts
verfasst von
Marijana Srećković
Goran Šibenik
Dominik Breitfuß
Copyright-Jahr
2022
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-3759-0_5