Skip to main content
Erschienen in: Neural Computing and Applications 1/2015

01.01.2015 | Original Article

Combining statistical analysis and artificial neural network for classifying jobs and estimating the cycle times in wafer fabrication

verfasst von: Toly Chen

Erschienen in: Neural Computing and Applications | Ausgabe 1/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Estimating the cycle time of a job is meaningful in many ways for managing a wafer fabrication factory (wafer fab). However, this estimation is not easy, due to the complexity and uncertainty of the wafer fabrication environment. Recently, a number of hybrid methods have been proposed to improve the accuracy of estimating the cycle time of a job. Most of these methods used job classification, especially pre-classification. Among these methods, several were based on post-classification and achieved even better performances. Such post-classification-based methods were improved in this study by considering the required parameter adjustment instead of the estimation error. Thus, it is possible to classify jobs into more than two categories at the same time. From the view of neurocomputing, this study established a systematic and effective procedure to divide the input examples to an artificial neural network into several parts that can be better handled by different artificial neural networks. A real case was also used to illustrate the applicability of the proposed methodology. The effectiveness of the proposed methodology over several existing methods has been confirmed by statistical tests.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Wein LM (1992) On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans Semicond Manuf 5(2):156–158CrossRefMathSciNet Wein LM (1992) On the relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans Semicond Manuf 5(2):156–158CrossRefMathSciNet
2.
Zurück zum Zitat Inoue T, Ishii Y, Igarashi K, Takagi H, Muneta T, Imaoka K (2006) Conveyer belt model to analyze cycle time conditions in a semiconductor manufacturing line. In: IEEE international symposium on semiconductor manufacturing conference proceedings, pp 74–77 Inoue T, Ishii Y, Igarashi K, Takagi H, Muneta T, Imaoka K (2006) Conveyer belt model to analyze cycle time conditions in a semiconductor manufacturing line. In: IEEE international symposium on semiconductor manufacturing conference proceedings, pp 74–77
3.
Zurück zum Zitat Johnson RT, Yang F, Ankenman BE, Nelson BL (2004) Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 winter simulation conference, vol 2, pp 1951–1955 Johnson RT, Yang F, Ankenman BE, Nelson BL (2004) Nonlinear regression fits for simulated cycle time vs. throughput curves for semiconductor manufacturing. In: Proceedings of the 2004 winter simulation conference, vol 2, pp 1951–1955
4.
Zurück zum Zitat Chen T (2013) A systematic cycle time reduction procedure for enhancing the competitiveness and sustainability of a semiconductor manufacturer. Sustainability 5:4637–4652CrossRef Chen T (2013) A systematic cycle time reduction procedure for enhancing the competitiveness and sustainability of a semiconductor manufacturer. Sustainability 5:4637–4652CrossRef
5.
Zurück zum Zitat Raddon A, Rio Rancho NM, Grigsby B (1997) Throughput time forecasting model. In: 1997 IEEE/SEMI advanced semiconductor manufacturing conference, pp 430–433 Raddon A, Rio Rancho NM, Grigsby B (1997) Throughput time forecasting model. In: 1997 IEEE/SEMI advanced semiconductor manufacturing conference, pp 430–433
6.
Zurück zum Zitat Sivakumar AI, Chong CS (2001) A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Comput Ind 45(1):59–78CrossRef Sivakumar AI, Chong CS (2001) A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Comput Ind 45(1):59–78CrossRef
7.
Zurück zum Zitat Fronckowiak D, Peikert A, Nishinohara K (1996) Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing. In: Advanced semiconductor manufacturing conference and workshop 1996, pp 151–155 Fronckowiak D, Peikert A, Nishinohara K (1996) Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing. In: Advanced semiconductor manufacturing conference and workshop 1996, pp 151–155
8.
Zurück zum Zitat Beeg T (2004) Wafer fab cycle forecast under changing loading situations. In: 2004 IEEE advanced semiconductor manufacturing conference, pp 339–343 Beeg T (2004) Wafer fab cycle forecast under changing loading situations. In: 2004 IEEE advanced semiconductor manufacturing conference, pp 339–343
9.
Zurück zum Zitat Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211–222CrossRef Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2(3):211–222CrossRef
10.
Zurück zum Zitat Tirkel I (2011) Cycle time prediction in wafer fabrication line by applying data mining methods. In: Proceedings of the 22nd annual IEEE/SEMI advanced semiconductor manufacturing conference (ASMC’11), p 5 Tirkel I (2011) Cycle time prediction in wafer fabrication line by applying data mining methods. In: Proceedings of the 22nd annual IEEE/SEMI advanced semiconductor manufacturing conference (ASMC’11), p 5
11.
Zurück zum Zitat Pearn WL, Chung SL, Lai CM (2007) Due-date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165–175CrossRef Pearn WL, Chung SL, Lai CM (2007) Due-date assignment for wafer fabrication under demand variate environment. IEEE Trans Semicond Manuf 20(2):165–175CrossRef
12.
Zurück zum Zitat Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the international conference on case-based reasoning (ICCBR 2001), Vancouver, British Columbia, Canada Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the international conference on case-based reasoning (ICCBR 2001), Vancouver, British Columbia, Canada
13.
Zurück zum Zitat Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55–61MathSciNet Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55–61MathSciNet
14.
Zurück zum Zitat Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271–288CrossRef Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Process Lett 24(3):271–288CrossRef
15.
Zurück zum Zitat Chang PC, Liao TW (2006) Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6(2):198–206CrossRef Chang PC, Liao TW (2006) Combing SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6(2):198–206CrossRef
16.
Zurück zum Zitat Chen T (2007) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol 35:575–586CrossRef Chen T (2007) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol 35:575–586CrossRef
17.
Zurück zum Zitat Chen T (2007) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21:55–65CrossRef Chen T (2007) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Inform 21:55–65CrossRef
18.
Zurück zum Zitat Chen T (2007) Predicting wafer lot output time with a hybrid FCM-FBPN approach. IEEE Trans Syst Man Cybern B Cybern 37(4):784–793CrossRef Chen T (2007) Predicting wafer lot output time with a hybrid FCM-FBPN approach. IEEE Trans Syst Man Cybern B Cybern 37(4):784–793CrossRef
19.
Zurück zum Zitat Chen T, Wu HC, Wang YC (2009) Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab. Appl Soft Comput 9:1225–1231CrossRef Chen T, Wu HC, Wang YC (2009) Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab. Appl Soft Comput 9:1225–1231CrossRef
20.
Zurück zum Zitat Chen T (2011) Job cycle time estimation in a wafer fabrication factory with a bi-directional classifying fuzzy-neural approach. Int J Adv Manuf Technol 56(9):1007–1018CrossRef Chen T (2011) Job cycle time estimation in a wafer fabrication factory with a bi-directional classifying fuzzy-neural approach. Int J Adv Manuf Technol 56(9):1007–1018CrossRef
22.
Zurück zum Zitat Chen T, Wang YC (2013) An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory. Math Probl Eng. Article ID 740478 Chen T, Wang YC (2013) An iterative procedure for optimizing the performance of the fuzzy-neural job cycle time estimation approach in a wafer fabrication factory. Math Probl Eng. Article ID 740478
23.
Zurück zum Zitat Benardos PG, Vosniakos GC (2002) Prediciton of surface roughness in CNC face milling using neural networks and Taguchi’s design of experiments. Robot Comput Integr Manuf 18(5–6):343–354CrossRef Benardos PG, Vosniakos GC (2002) Prediciton of surface roughness in CNC face milling using neural networks and Taguchi’s design of experiments. Robot Comput Integr Manuf 18(5–6):343–354CrossRef
24.
Zurück zum Zitat Sukthomya W, Tannock J (2005) The optimization of neural network parameters using Taguchi’s design of experiments approach: an application in manufacturing process modeling. Neural Comput Appl 14(4):337–344CrossRef Sukthomya W, Tannock J (2005) The optimization of neural network parameters using Taguchi’s design of experiments approach: an application in manufacturing process modeling. Neural Comput Appl 14(4):337–344CrossRef
26.
Zurück zum Zitat Bonnans JF, Gilbert JC, Lemaréchal C, Sagastizábal CA (2006) Numerical optimization: theoretical and practical aspects. Springer, Berlin Bonnans JF, Gilbert JC, Lemaréchal C, Sagastizábal CA (2006) Numerical optimization: theoretical and practical aspects. Springer, Berlin
27.
Zurück zum Zitat Tesauro G (1995) Temporal difference learning and TD-Gammon. Commun ACM 38(3):58–68CrossRef Tesauro G (1995) Temporal difference learning and TD-Gammon. Commun ACM 38(3):58–68CrossRef
28.
Zurück zum Zitat Hans Raj K, Sharma RS, Srivastava S, Patvardhan C (2000) Modeling of manufacturing processes with ANNs for intelligent manufacturing. Int J Mach Tools Manuf 40(6):851–868CrossRef Hans Raj K, Sharma RS, Srivastava S, Patvardhan C (2000) Modeling of manufacturing processes with ANNs for intelligent manufacturing. Int J Mach Tools Manuf 40(6):851–868CrossRef
29.
Zurück zum Zitat Firoze A, Arifin MS, Rahman RM (2013) Bangla user adaptive word speech recognition: approaches and comparisons. Int J Fuzzy Syst Appl 3(3):1–36 Firoze A, Arifin MS, Rahman RM (2013) Bangla user adaptive word speech recognition: approaches and comparisons. Int J Fuzzy Syst Appl 3(3):1–36
30.
Zurück zum Zitat Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and regression trees. Wadsworth & Brooks/Cole Advanced Books & Software, MontereyMATH Breiman L, Friedman JH, Olshen RA, Stone CJ (1984) Classification and regression trees. Wadsworth & Brooks/Cole Advanced Books & Software, MontereyMATH
Metadaten
Titel
Combining statistical analysis and artificial neural network for classifying jobs and estimating the cycle times in wafer fabrication
verfasst von
Toly Chen
Publikationsdatum
01.01.2015
Verlag
Springer London
Erschienen in
Neural Computing and Applications / Ausgabe 1/2015
Print ISSN: 0941-0643
Elektronische ISSN: 1433-3058
DOI
https://doi.org/10.1007/s00521-014-1739-1

Weitere Artikel der Ausgabe 1/2015

Neural Computing and Applications 1/2015 Zur Ausgabe