Skip to main content

2016 | OriginalPaper | Buchkapitel

Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A

verfasst von : Erezi Utiome, Sherif Mohamed, Kriengsak Panuwatwanich, Emerson Lin, Lei Hou

Erschienen in: Cooperative Design, Visualization, and Engineering

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Many of the shortcomings associated with dated design and construction methods as well as project fast-tracking can be addressed by exploring the concept of concurrency facilitated by Building Information Modelling (BIM). From a BIM perspective, concurrency facilitates the involvement of stakeholders from very early on during the lifecycle of a project. Leveraging the 5 W/H (Who, What, When/Where, Why and How) method of exploratory research, this paper explores how BIM and Concurrent Engineering (CE) at Terminal 3A of the Chongqing Jiangbei International Airport compares with a historical exemplar of BIM deployment in the AEC industry. Based on existing definitions of CE, we compare both projects to determine their conformance to three CE criteria: 1) compressed project duration, 2) enhanced product value, and 3) reduced project costs. We also review their use of collaborative tools and techniques. The paper shows how the success of BIM-based projects can be rationalised by CE.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
The IIF framework is useful for gaining a general understanding of information dynamics from a very basic investigative perspective. This approach is widely known as the 5W1H method.
 
2
The TOPP framework captures BIM content in three key dimensions depicting unique perspectives for uniformly evaluating BIM-based case-study projects.
 
Literatur
1.
Zurück zum Zitat Latham, M.: Constructing the team: final report of The Government/Industry review of procurement and contractual arrangements in the United Kingdom construction industry. In: The Stationery Office. Department of Environment, London (1994) Latham, M.: Constructing the team: final report of The Government/Industry review of procurement and contractual arrangements in the United Kingdom construction industry. In: The Stationery Office. Department of Environment, London (1994)
2.
Zurück zum Zitat Egan, J.: Rethinking construction: the report of the construction task force. Department of the Environment, Transport and the Regions, London (1998) Egan, J.: Rethinking construction: the report of the construction task force. Department of the Environment, Transport and the Regions, London (1998)
3.
Zurück zum Zitat Alarcon, L.: Lean Construction. A.A. Balkema, Rotterdam (1997) Alarcon, L.: Lean Construction. A.A. Balkema, Rotterdam (1997)
4.
Zurück zum Zitat Love, P.E.D., Gunasekaran, A., Li, H.: Concurrent engineering: a strategy for procuring construction projects. Int. J. Project Manage. 16(6), 375–383 (1998)CrossRef Love, P.E.D., Gunasekaran, A., Li, H.: Concurrent engineering: a strategy for procuring construction projects. Int. J. Project Manage. 16(6), 375–383 (1998)CrossRef
5.
Zurück zum Zitat Castagna, J.: Benefits of BIM. Environ. Des. Constr. 11(11), 140–143 (2008) Castagna, J.: Benefits of BIM. Environ. Des. Constr. 11(11), 140–143 (2008)
6.
Zurück zum Zitat Costin, A., Pradhananga, N., Teizer, J., Marks, E.: Real-time resource location tracking in building information models (BIM). In: Luo, Y. (ed.) CDVE 2012. LNCS, vol. 7467, pp. 41–48. Springer, Heidelberg (2012)CrossRef Costin, A., Pradhananga, N., Teizer, J., Marks, E.: Real-time resource location tracking in building information models (BIM). In: Luo, Y. (ed.) CDVE 2012. LNCS, vol. 7467, pp. 41–48. Springer, Heidelberg (2012)CrossRef
7.
Zurück zum Zitat Wang, Y., et al.: Engagement of facilities management in design stage through BIM: framework and a case study. Adv. Civ. Eng. (2013) Wang, Y., et al.: Engagement of facilities management in design stage through BIM: framework and a case study. Adv. Civ. Eng. (2013)
8.
Zurück zum Zitat Ren, Y., Skibniewski, M.J., Jiang, S.: Building information modeling integrated with electronic commerce material procurement and supplier performance management system. J. Civ. Eng. Manage. 18(5), 642–654 (2012)CrossRef Ren, Y., Skibniewski, M.J., Jiang, S.: Building information modeling integrated with electronic commerce material procurement and supplier performance management system. J. Civ. Eng. Manage. 18(5), 642–654 (2012)CrossRef
9.
Zurück zum Zitat Brandon, P.S., Betts, M.: Integrated Construction Information. Taylor & Francis Group, Boca Raton (1995) Brandon, P.S., Betts, M.: Integrated Construction Information. Taylor & Francis Group, Boca Raton (1995)
10.
Zurück zum Zitat Staub‐French, S., et al.: Building Information Modeling (BIM) ‘Best Practices’ Project Report. University of British Colombia, École de Technologie Supérieure (2011) Staub‐French, S., et al.: Building Information Modeling (BIM) ‘Best Practices’ Project Report. University of British Colombia, École de Technologie Supérieure (2011)
Metadaten
Titel
Concurrency in BIM-Based Project Implementation: An Exploratory Study of Chongqing Jiangbei International Airport’s Terminal 3A
verfasst von
Erezi Utiome
Sherif Mohamed
Kriengsak Panuwatwanich
Emerson Lin
Lei Hou
Copyright-Jahr
2016
DOI
https://doi.org/10.1007/978-3-319-46771-9_33

Neuer Inhalt