Skip to main content

2023 | OriginalPaper | Buchkapitel

Construction Equipment Maintenance Supervision: An i-Core and Blockchain-Enabled Conceptual Framework

verfasst von : Liupengfei Wu, Weisheng Lu, Lang Zheng, Jinfeng Lou, Wenjun Gao

Erschienen in: Proceedings of the 27th International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Accidents due to the use of construction equipment are one of the leading causes of serious injuries in the construction industry. The supervision of construction equipment is an essential procedure to ensure the safety of users in the usage stage by requiring appropriate and timely maintenance. However, the following two issues must be tackled to secure its effeteness. Firstly, the execution of maintenance must be guaranteed, especially under a tight construction schedule. Secondly, the immutability, transparency, and traceability of the maintenance information must be enhanced. This research aims to develop an i-Core and blockchain-enabled framework for assuring the effectiveness of supervision of construction equipment maintenance (ESCEM). First, a literature review was conducted to identify ESCEM challenges and i-Core and blockchain potentials. Then, an i-Core and blockchain-enabled conceptual framework was provided. Finally, a prototype system was developed based on a case study to instantiate and test the proposed framework. As a result, it is found that i-Core can protect the effectiveness of ESCEM by automatically notifying construction stakeholders of when equipment maintenance is due, ensuring timely maintenance. Besides, blockchain allows construction stakeholders to submit, share, endorse, and store the maintenance transactions of construction equipment in a decentralized, transparent, immutable, and traceable manner. This study offers a novel solution for construction equipment safety management to construction researchers and practitioners, inspiring more discussions about blockchain applications in the construction industry.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Hinze, J.W., Teizer, J.: Visibility-related fatalities related to construction equipment. Saf. Sci. 49(5), 709–718 (2011)CrossRef Hinze, J.W., Teizer, J.: Visibility-related fatalities related to construction equipment. Saf. Sci. 49(5), 709–718 (2011)CrossRef
2.
Zurück zum Zitat Wang, H., Xiao, G., Zhang, Q.: Design and installation of hanging basket of Fuling Wujiang second bridge. J. Chongq. Jiaotong Univ. 25(1), 24 (2006) Wang, H., Xiao, G., Zhang, Q.: Design and installation of hanging basket of Fuling Wujiang second bridge. J. Chongq. Jiaotong Univ. 25(1), 24 (2006)
3.
Zurück zum Zitat Jung, H., Choi, B., Kang, S., Kang, Y.: Temporal analysis of the frequency of accidents associated with construction equipment. Saf. Sci. 153, 105817 (2022)CrossRef Jung, H., Choi, B., Kang, S., Kang, Y.: Temporal analysis of the frequency of accidents associated with construction equipment. Saf. Sci. 153, 105817 (2022)CrossRef
4.
Zurück zum Zitat Niu, Y., Lu, W., Liu, D., Chen, K., Xue, F.: A smart construction object (SCO)-Enabled proactive data management system for construction equipment management. In: Computing in Civil Engineering, pp. 130–138 (2017) Niu, Y., Lu, W., Liu, D., Chen, K., Xue, F.: A smart construction object (SCO)-Enabled proactive data management system for construction equipment management. In: Computing in Civil Engineering, pp. 130–138 (2017)
5.
Zurück zum Zitat Wu, L., et al.: Using blockchain to improve information sharing accuracy in the onsite assembly of modular construction. J. Manage. Eng. 38(3), 04022014 (2022)CrossRef Wu, L., et al.: Using blockchain to improve information sharing accuracy in the onsite assembly of modular construction. J. Manage. Eng. 38(3), 04022014 (2022)CrossRef
6.
Zurück zum Zitat Lu, W., Wu, L., Xue, F.: Blockchain technology for projects: a multicriteria decision matrix. Proj. Manage. J. 53(1), 84–99 (2022)CrossRef Lu, W., Wu, L., Xue, F.: Blockchain technology for projects: a multicriteria decision matrix. Proj. Manage. J. 53(1), 84–99 (2022)CrossRef
7.
Zurück zum Zitat Lu, W., Wu, L., Xu, J., Lou, J.: Construction E-Inspection 2.0 in the COVID-19 pandemic era: a blockchain-based technical solution. J. Manage. Eng. 38(4), 04022032 (2022) Lu, W., Wu, L., Xu, J., Lou, J.: Construction E-Inspection 2.0 in the COVID-19 pandemic era: a blockchain-based technical solution. J. Manage. Eng. 38(4), 04022032 (2022)
8.
Zurück zum Zitat Zhong, B., Wu, H., Ding, L., Luo, H., Luo, Y., Pan, X.: Hyperledger fabric-based consortium blockchain for construction quality information management. Front. Eng. Manage.7(4), 512–527 (2020) Zhong, B., Wu, H., Ding, L., Luo, H., Luo, Y., Pan, X.: Hyperledger fabric-based consortium blockchain for construction quality information management. Front. Eng. Manage.7(4), 512–527 (2020)
9.
Zurück zum Zitat Baumeister, R.F., Leary, M.R.: Writing narrative literature reviews. Rev. Gen. Psychol. 1(3), 311–320 (1997)CrossRef Baumeister, R.F., Leary, M.R.: Writing narrative literature reviews. Rev. Gen. Psychol. 1(3), 311–320 (1997)CrossRef
10.
Zurück zum Zitat Webster, J., Watson, R.T.: Analyzing the past to prepare for the future: writing a literature review. MIS Q. xiii-xxiii (2002) Webster, J., Watson, R.T.: Analyzing the past to prepare for the future: writing a literature review. MIS Q. xiii-xxiii (2002)
11.
Zurück zum Zitat Brown, T., Wyatt, J.: Design thinking for social innovation. Dev. Outreach 12(1), 29–43 (2010)CrossRef Brown, T., Wyatt, J.: Design thinking for social innovation. Dev. Outreach 12(1), 29–43 (2010)CrossRef
12.
Zurück zum Zitat Castro, M., Liskov, B.: Practical Byzantine fault tolerance and proactive recovery. ACM Trans. Comput. Syst. (TOCS) 20(4), 398–461 (2002)CrossRef Castro, M., Liskov, B.: Practical Byzantine fault tolerance and proactive recovery. ACM Trans. Comput. Syst. (TOCS) 20(4), 398–461 (2002)CrossRef
13.
Zurück zum Zitat Pop, C., Cioara, T., Antal, M., Anghel, I., Salomie, I., Bertoncini, M.: Blockchain based decentralized management of demand response programs in smart energy grids. Sensors 18(1), 162 (2018)CrossRef Pop, C., Cioara, T., Antal, M., Anghel, I., Salomie, I., Bertoncini, M.: Blockchain based decentralized management of demand response programs in smart energy grids. Sensors 18(1), 162 (2018)CrossRef
15.
Zurück zum Zitat Zhou, B., Wu, Q., Zhao, X., Zhang, W., Wu, W., Guo, Z.: Construction of 5G all-wireless network and information system for cabin hospitals. J. Am. Med. Inform. Assoc. 27(6), 934–938 (2020)CrossRef Zhou, B., Wu, Q., Zhao, X., Zhang, W., Wu, W., Guo, Z.: Construction of 5G all-wireless network and information system for cabin hospitals. J. Am. Med. Inform. Assoc. 27(6), 934–938 (2020)CrossRef
16.
Zurück zum Zitat Kuhle, P., Arroyo, D., Schuster, E.: Building A blockchain-based decentralized digital asset management system for commercial aircraft leasing. Comput. Ind. 126, 103393 (2021)CrossRef Kuhle, P., Arroyo, D., Schuster, E.: Building A blockchain-based decentralized digital asset management system for commercial aircraft leasing. Comput. Ind. 126, 103393 (2021)CrossRef
17.
Zurück zum Zitat Alzahrani, J.I., Emsley, M.W.: The impact of contractors’ attributes on construction project success: a post construction evaluation. Int. J. Project Manage. 31(2), 313–322 (2013)CrossRef Alzahrani, J.I., Emsley, M.W.: The impact of contractors’ attributes on construction project success: a post construction evaluation. Int. J. Project Manage. 31(2), 313–322 (2013)CrossRef
Metadaten
Titel
Construction Equipment Maintenance Supervision: An i-Core and Blockchain-Enabled Conceptual Framework
verfasst von
Liupengfei Wu
Weisheng Lu
Lang Zheng
Jinfeng Lou
Wenjun Gao
Copyright-Jahr
2023
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-99-3626-7_27