Skip to main content

2023 | OriginalPaper | Buchkapitel

Construction Management in the Post Covid Era: Towards Improving Construction Productivity in Developing Countries - Example from Nigeria

verfasst von : Muhammad Nasir Ibrahim, Ahsan Nawaz, Xing Su, Abubakar Sadiq Ibrahim

Erschienen in: Proceedings of the 27th International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Covid-19 has caused a standstill in economies and social life worldwide, which is one of the most unexpected deadly events that remains a global pandemic to date. The construction industry is one of those negatively impacted by Covid-19; it brought unprecedented changes to a number of construction sites globally, which has raised serious concerns within the industry. Prior to the pandemic, the productivity of the construction industry has been unsatisfactory due to a variety of factors especially those related to the workforce. However, the advent of Covid-19 has exacerbated the industry’s vulnerabilities, threatening its overall performance and contribution to the economies of most developing countries. The pandemic’s impact on the construction industry have raised management’s pressure to achieve high productivity levels in most projects where labor productivity improvement is critical. The main objective of this paper is to explore the important factors that influence overall construction productivity in most developing countries, while considering the pandemic’s impact on the construction industry. To achieve that, an extensive literature review was conducted, and about 60 papers were shortlisted with the keywords ‘Covid-19’, ‘Construction Productivity’, ‘Construction industry’, ‘Developing countries’, ‘Construction labor productivity’ ‘Nigeria’, etc., among which studies conducted in most developing countries such as, India, Indonesia, Malaysia, Nigeria, Thailand, Uganda, etc., were focused on. Using Nigeria as an example, important factors applicable (but not limited) to Nigeria, were chosen and classified for further review and discussion. Finally, some critical factors were discussed and suggestions for mitigating the impacts they have on the industry were made. The findings and recommendations provided will contribute immensely in related study areas both for present and future research. It will aid researchers and policymakers in most developing countries in understanding the measures required for better management and decisions toward improving construction productivity in current and future construction projects.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Abdul Kadir, M.R., Lee, W.P., Jaafar, M.S., Sapuan, S.M., Ali, A.A.A.: Factors affecting construction labour productivity for Malaysian residential projects. Struct. Surv. 23(1), 42–54 (2005)CrossRef Abdul Kadir, M.R., Lee, W.P., Jaafar, M.S., Sapuan, S.M., Ali, A.A.A.: Factors affecting construction labour productivity for Malaysian residential projects. Struct. Surv. 23(1), 42–54 (2005)CrossRef
2.
Zurück zum Zitat Afolabi, A., Ojelabi, R.A., Omuh, I., Tunji-Olayeni, P., Adeyemi, M.: Critical success factors influencing productivity of construction artisans in the building industry. Technology 9(8), 858–867 (2018) Afolabi, A., Ojelabi, R.A., Omuh, I., Tunji-Olayeni, P., Adeyemi, M.: Critical success factors influencing productivity of construction artisans in the building industry. Technology 9(8), 858–867 (2018)
3.
Zurück zum Zitat Aina, O.O., Adesanya, D.A.: Factors affecting performance of incentive schemes in the construction industry in Nigeria. Civ. Environ. Res. 8(7), 81–89 (2015) Aina, O.O., Adesanya, D.A.: Factors affecting performance of incentive schemes in the construction industry in Nigeria. Civ. Environ. Res. 8(7), 81–89 (2015)
4.
Zurück zum Zitat Ajufo, B.: Challenges of youth unemployment in Nigeria: effective career guidance as a panacea. Afr. Res. Rev. J. 7(1) (2013) Ajufo, B.: Challenges of youth unemployment in Nigeria: effective career guidance as a panacea. Afr. Res. Rev. J. 7(1) (2013)
5.
Zurück zum Zitat Alinaitwe, H.M., Mwakali, J.A., Hansson, B.: Factors affecting the productivity of building craftsmen-studies of Uganda. J. Civ. Eng. Manag. 13(3), 169–176 (2007)CrossRef Alinaitwe, H.M., Mwakali, J.A., Hansson, B.: Factors affecting the productivity of building craftsmen-studies of Uganda. J. Civ. Eng. Manag. 13(3), 169–176 (2007)CrossRef
6.
Zurück zum Zitat Alsharef, A., Banerjee, S., Uddin, S.M.J., Albert, A., Jaselskis, E.: Early impacts of the Covid-19 pandemic on the United States construction industry. Int. J. Environ. Res. Public Health 18(4), 1–21 (2021)CrossRef Alsharef, A., Banerjee, S., Uddin, S.M.J., Albert, A., Jaselskis, E.: Early impacts of the Covid-19 pandemic on the United States construction industry. Int. J. Environ. Res. Public Health 18(4), 1–21 (2021)CrossRef
7.
Zurück zum Zitat Alwi, S., Keith, H., Sherif, M.: Effect of quality supervision on rework in the Indonesian context. Asia Pac. Build. Constr. Manage. J. 1–13 (2001) Alwi, S., Keith, H., Sherif, M.: Effect of quality supervision on rework in the Indonesian context. Asia Pac. Build. Constr. Manage. J. 1–13 (2001)
8.
Zurück zum Zitat Anaman, K.A., Osei-Amponsah, C.: Analysis of the causality links between the growth of the construction industry and the growth of the macroeconomy in Ghana. J. Constr. Manage. Econ. 25(9), 951–961 (2007)CrossRef Anaman, K.A., Osei-Amponsah, C.: Analysis of the causality links between the growth of the construction industry and the growth of the macroeconomy in Ghana. J. Constr. Manage. Econ. 25(9), 951–961 (2007)CrossRef
9.
Zurück zum Zitat Anwar Malik, M.S., Nauman, S.: Factors affecting productivity of infrastructure development project attributable to insecurity due to terrorism. Adv. Eng. Mech. Mater. 3(3), 313–319 (2011) Anwar Malik, M.S., Nauman, S.: Factors affecting productivity of infrastructure development project attributable to insecurity due to terrorism. Adv. Eng. Mech. Mater. 3(3), 313–319 (2011)
10.
Zurück zum Zitat Anyanwu, S.O., Ibekwe, U.C., Adesope, O.M.: Agriculture share of the gross domestic product and its implications for rural development. Re. Opin. 2(8), 26–30 (2010) Anyanwu, S.O., Ibekwe, U.C., Adesope, O.M.: Agriculture share of the gross domestic product and its implications for rural development. Re. Opin. 2(8), 26–30 (2010)
11.
Zurück zum Zitat Attar, A.A., Gupta, A.K., Desai, D.B.: A study of various factors affecting labor productivity and methods to improve it. J. Mech. Civ. Eng. 11–14 (2012) Attar, A.A., Gupta, A.K., Desai, D.B.: A study of various factors affecting labor productivity and methods to improve it. J. Mech. Civ. Eng. 11–14 (2012)
12.
Zurück zum Zitat Atomen, E., Chuka, O.C., Emeka, I.K., Samuel, O.S.: Labour productivity in construction industry in Nigeria: case of Lagos and Port Harcourt, Southern Nigeria. Labour 7(4) (2015) Atomen, E., Chuka, O.C., Emeka, I.K., Samuel, O.S.: Labour productivity in construction industry in Nigeria: case of Lagos and Port Harcourt, Southern Nigeria. Labour 7(4) (2015)
13.
Zurück zum Zitat Bilau, A.A., Akintunde Ajagbe, M., Kigbu, H.H., Sholanke, A.B.: Review of shortage of skilled craftsmen in small and medium construction firms in Nigeria. J. Environ. Earth Sci. 5(15), 98–110 (2015) Bilau, A.A., Akintunde Ajagbe, M., Kigbu, H.H., Sholanke, A.B.: Review of shortage of skilled craftsmen in small and medium construction firms in Nigeria. J. Environ. Earth Sci. 5(15), 98–110 (2015)
14.
Zurück zum Zitat Buheji, M., et al.: The extent of covid-19 pandemic socio-economic impact on global poverty. A global integrative multidisciplinary review. Am. J. Econ. 10(4), 213–224 (2020)CrossRef Buheji, M., et al.: The extent of covid-19 pandemic socio-economic impact on global poverty. A global integrative multidisciplinary review. Am. J. Econ. 10(4), 213–224 (2020)CrossRef
16.
Zurück zum Zitat CPWR. The Construction Chart Book: The U.S. Construction industry and its workers sixth edition. The Center for Construction Research and Training, 156p. (2018) CPWR. The Construction Chart Book: The U.S. Construction industry and its workers sixth edition. The Center for Construction Research and Training, 156p. (2018)
17.
Zurück zum Zitat Dantata, S.: General overview of the Nigerian construction industry. Doctoral Dissertation, Massachusetts Institute of Technology (2008) Dantata, S.: General overview of the Nigerian construction industry. Doctoral Dissertation, Massachusetts Institute of Technology (2008)
18.
Zurück zum Zitat De Wit, A.: Measurement of project success. Int. J. Project Manage. 6(3), 164–170 (1988)CrossRef De Wit, A.: Measurement of project success. Int. J. Project Manage. 6(3), 164–170 (1988)CrossRef
19.
Zurück zum Zitat Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.: Analysing factors affecting delays in Indian construction projects. Int. J. Project Manage. 30(4), 479–489 (2012)CrossRef Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.: Analysing factors affecting delays in Indian construction projects. Int. J. Project Manage. 30(4), 479–489 (2012)CrossRef
20.
Zurück zum Zitat Falola, T., Heaton, M.M.: A History of Nigeria. Cambridge University Press, Cambridge (2012) Falola, T., Heaton, M.M.: A History of Nigeria. Cambridge University Press, Cambridge (2012)
21.
Zurück zum Zitat Field, B., Ofori, G.: Construction and economic development; a case study. Third World Plann. Rev. 10(1), 41–50 (1988)CrossRef Field, B., Ofori, G.: Construction and economic development; a case study. Third World Plann. Rev. 10(1), 41–50 (1988)CrossRef
22.
Zurück zum Zitat Gandonu, A.: Nigeria’s 250 ethnic groups realities and assumptions. Perspect. Ethnicity 243–280 (1978) Gandonu, A.: Nigeria’s 250 ethnic groups realities and assumptions. Perspect. Ethnicity 243–280 (1978)
23.
Zurück zum Zitat Hanna, A.S., Haddad, G.: Overtime and productivity in electrical construction. In: Construction Research Congress 2009 (2009) Hanna, A.S., Haddad, G.: Overtime and productivity in electrical construction. In: Construction Research Congress 2009 (2009)
24.
Zurück zum Zitat Iheonu, C.O., Ichoku, H.E.: Poverty and terrorism in Africa: understanding the nexus based on existing levels of terrorism. Poverty Public Policy J. 13(3), 254–272 (2021)CrossRef Iheonu, C.O., Ichoku, H.E.: Poverty and terrorism in Africa: understanding the nexus based on existing levels of terrorism. Poverty Public Policy J. 13(3), 254–272 (2021)CrossRef
25.
Zurück zum Zitat Isa, R.B., Jimoh, R.A., Achuenu, E.: An overview of the contribution of construction sector to sustainable development in Nigeria. Net J. Bus. Manage. 1(1), 1–16 (2013) Isa, R.B., Jimoh, R.A., Achuenu, E.: An overview of the contribution of construction sector to sustainable development in Nigeria. Net J. Bus. Manage. 1(1), 1–16 (2013)
26.
Zurück zum Zitat Jacobsen, H.B., Caban-Martinez, A., Onyebeke, L.C., Sorensen, G., Dennerlein, J.T., Reme, S.E.: Construction workers struggle with a high prevalence of mental distress, and this is associated with their pain and injuries. J. Occup. Environ. Med. 55(10), 1197–1204 (2013)CrossRef Jacobsen, H.B., Caban-Martinez, A., Onyebeke, L.C., Sorensen, G., Dennerlein, J.T., Reme, S.E.: Construction workers struggle with a high prevalence of mental distress, and this is associated with their pain and injuries. J. Occup. Environ. Med. 55(10), 1197–1204 (2013)CrossRef
27.
Zurück zum Zitat Jarkas, A.M.: Buildability factors affecting formwork labour productivity of building floors. Can. J. Civ. Eng. 37(10), 1383–1394 (2010)CrossRef Jarkas, A.M.: Buildability factors affecting formwork labour productivity of building floors. Can. J. Civ. Eng. 37(10), 1383–1394 (2010)CrossRef
28.
Zurück zum Zitat Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C.: Factors influencing craftsmen’s productivity in Indonesia. Int. J. Project Manage. 15(1), 21–30 (1997)CrossRef Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C.: Factors influencing craftsmen’s productivity in Indonesia. Int. J. Project Manage. 15(1), 21–30 (1997)CrossRef
29.
Zurück zum Zitat Kontoangelos, K., Economou, M., Papageorgiou, C.: Mental health effects of Covid-19 pandemia: a review of clinical and psychological traits. J. Psychiatry Invest. 17(6), 491–505 (2020)CrossRef Kontoangelos, K., Economou, M., Papageorgiou, C.: Mental health effects of Covid-19 pandemia: a review of clinical and psychological traits. J. Psychiatry Invest. 17(6), 491–505 (2020)CrossRef
30.
Zurück zum Zitat Leach, M., MacGregor, H., Scoones, I., Wilkinson, A.: Post-pandemic transformations: how and why Covid-19 requires us to rethink development. J. World Dev. 138, 105233 (2021)CrossRef Leach, M., MacGregor, H., Scoones, I., Wilkinson, A.: Post-pandemic transformations: how and why Covid-19 requires us to rethink development. J. World Dev. 138, 105233 (2021)CrossRef
31.
Zurück zum Zitat Lim, E.C., Alum, J.: Construction productivity: issues encountered by contractors in Singapore. Int. J. Project Manage. 13(1), 51–58 (1995)CrossRef Lim, E.C., Alum, J.: Construction productivity: issues encountered by contractors in Singapore. Int. J. Project Manage. 13(1), 51–58 (1995)CrossRef
32.
Zurück zum Zitat Love, P.E.D., Matthews, J., Sing, M.C.P., Porter, S.R., Fang, W.: State of science: why does rework occur in construction? What are its consequences? And what can be done to mitigate its occurrence? J. Eng. (2022) Love, P.E.D., Matthews, J., Sing, M.C.P., Porter, S.R., Fang, W.: State of science: why does rework occur in construction? What are its consequences? And what can be done to mitigate its occurrence? J. Eng. (2022)
33.
Zurück zum Zitat Love, P., Smith, J.: Unpacking the ambiguity of rework in construction: making sense of the literature. J. Civ. Eng. Environ. Syst. 35(1–4), 180–203 (2018)CrossRef Love, P., Smith, J.: Unpacking the ambiguity of rework in construction: making sense of the literature. J. Civ. Eng. Environ. Syst. 35(1–4), 180–203 (2018)CrossRef
34.
Zurück zum Zitat Milner, A., Spittal, M., Pirkis, J., Lamontagne, A.: Suicide by occupation: systematic review and meta-analysis. Br. J. Psychiatry 203, 409–416 (2013)CrossRef Milner, A., Spittal, M., Pirkis, J., Lamontagne, A.: Suicide by occupation: systematic review and meta-analysis. Br. J. Psychiatry 203, 409–416 (2013)CrossRef
35.
Zurück zum Zitat Moavenzadeh, F.: Construction industry in developing countries. World Dev. 6(1), 97–116 (1978)CrossRef Moavenzadeh, F.: Construction industry in developing countries. World Dev. 6(1), 97–116 (1978)CrossRef
36.
Zurück zum Zitat Muqeem, S., Idrus, A., Khamidi, M.F., Bin Ahmad, J., Bin Zakaria, S.: Construction labor production rates modeling using artificial neural network. Electron. J. Inf. Technol. Constr. 713–726 (2011) Muqeem, S., Idrus, A., Khamidi, M.F., Bin Ahmad, J., Bin Zakaria, S.: Construction labor production rates modeling using artificial neural network. Electron. J. Inf. Technol. Constr. 713–726 (2011)
38.
Zurück zum Zitat Ogunlana, S.O., Pien Chang, W.: Worker motivation on selected construction sites in Bangkok, Thailand. Eng. Constr. Archit. Manage. 5(1), 61–81 (1998) Ogunlana, S.O., Pien Chang, W.: Worker motivation on selected construction sites in Bangkok, Thailand. Eng. Constr. Archit. Manage. 5(1), 61–81 (1998)
39.
Zurück zum Zitat Ogunnusi, M., Omotayo, T., Hamma-Adama, M., Awuzie, B.O., Egbelakin, T.: Lessons learned from the impact of Covid-19 on the global construction industry. J. Eng. Design Technol. 20(1), 299–320 (2021)CrossRef Ogunnusi, M., Omotayo, T., Hamma-Adama, M., Awuzie, B.O., Egbelakin, T.: Lessons learned from the impact of Covid-19 on the global construction industry. J. Eng. Design Technol. 20(1), 299–320 (2021)CrossRef
40.
Zurück zum Zitat Olomolaiye, P.O., Wahab, K.A., Price, A.D.F.: Problems influencing craftsmen’s productivity in Nigeria. J. Build. Environ. 22(4), 317–323 (1987)CrossRef Olomolaiye, P.O., Wahab, K.A., Price, A.D.F.: Problems influencing craftsmen’s productivity in Nigeria. J. Build. Environ. 22(4), 317–323 (1987)CrossRef
41.
Zurück zum Zitat Olomolaiye, P.O.: An evaluation of the relationships between bricklayers’ motivation and productivity. J. Constr. Manage. Econ. 8(3), 301–313 (1990)CrossRef Olomolaiye, P.O.: An evaluation of the relationships between bricklayers’ motivation and productivity. J. Constr. Manage. Econ. 8(3), 301–313 (1990)CrossRef
42.
Zurück zum Zitat Oswald, D., Sherratt, F., Smith, S., Dainty, A.: An exploration into the implications of the ‘compensation culture’ on construction safety. Saf. Sci. 109, 294–302 (2018)CrossRef Oswald, D., Sherratt, F., Smith, S., Dainty, A.: An exploration into the implications of the ‘compensation culture’ on construction safety. Saf. Sci. 109, 294–302 (2018)CrossRef
43.
Zurück zum Zitat Palikhe, S., Kim, S., Kim, J.J.: Critical success factors and dynamic modeling of construction labour productivity. Int. J. Civ. Eng. 17(3), 427–442 (2019)CrossRef Palikhe, S., Kim, S., Kim, J.J.: Critical success factors and dynamic modeling of construction labour productivity. Int. J. Civ. Eng. 17(3), 427–442 (2019)CrossRef
44.
Zurück zum Zitat Rudolph, C.W., et al.: Pandemics: implications for research and practice in industrial and organizational psychology. J. Ind. Organ. Psychol. 14(1–2), 1–3 (2021) Rudolph, C.W., et al.: Pandemics: implications for research and practice in industrial and organizational psychology. J. Ind. Organ. Psychol. 14(1–2), 1–3 (2021)
45.
Zurück zum Zitat Shan, Y., Zhai, D., Goodrum, P.M., Haas, C.T., Caldas, C.H.: Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects. J. Manage. Eng. 32(1) (2016) Shan, Y., Zhai, D., Goodrum, P.M., Haas, C.T., Caldas, C.H.: Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects. J. Manage. Eng. 32(1) (2016)
46.
Zurück zum Zitat Sunindijo, R.Y., Kamardeen, I.: Work stress is a threat to gender diversity in the construction industry. J. Constr. Eng. Manage. 143(10) (2017) Sunindijo, R.Y., Kamardeen, I.: Work stress is a threat to gender diversity in the construction industry. J. Constr. Eng. Manage. 143(10) (2017)
47.
Zurück zum Zitat Tran, V.D., Tookey, J.E.: Labour productivity in the New Zealand construction industry: a thorough investigation. Constr. Econ. Build. 11(1), 41–60 (2011)CrossRef Tran, V.D., Tookey, J.E.: Labour productivity in the New Zealand construction industry: a thorough investigation. Constr. Econ. Build. 11(1), 41–60 (2011)CrossRef
48.
Zurück zum Zitat Zulkifly, S.S., Ismail Syed, S.N., Hasan, N.H., Mahadi, M.R., Baharudin, M.R.: Assessing the level of safety knowledge-attitude-behaviour (Safety KAB): a case study in a public cleansing firm. J. Saf. Health Ergon. 2(1), 1–7 (2020) Zulkifly, S.S., Ismail Syed, S.N., Hasan, N.H., Mahadi, M.R., Baharudin, M.R.: Assessing the level of safety knowledge-attitude-behaviour (Safety KAB): a case study in a public cleansing firm. J. Saf. Health Ergon. 2(1), 1–7 (2020)
Metadaten
Titel
Construction Management in the Post Covid Era: Towards Improving Construction Productivity in Developing Countries - Example from Nigeria
verfasst von
Muhammad Nasir Ibrahim
Ahsan Nawaz
Xing Su
Abubakar Sadiq Ibrahim
Copyright-Jahr
2023
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-99-3626-7_90