Abstract

There are many different production situations that can be employed to meet demand. In the engineer-to-order (ETO) production situation, products are manufactured to meet specific customer needs by unique engineering or significant customization. In such an environment, failing to supply the required materials in the right quantities and at the right time increases the risk of breaching due date agreements and thereby losing customer satisfaction. As such, materials management is one of the most important and critical processes within production planning and control in ETO. To bring attention and improvement to this area, ETO companies may benefit from a performance measurement system (PMS) that systematically monitors how well materials management is carried out. The design of a company’s PMS varies with its production situation. Within the large body of literature on performance management and measurement, limited literature specifically addressing performance measurement in ETO has been identified. After being approached by a Norwegian ETO company requesting a PMS for materials management, the authors therefore set out to design the PMS from scratch, using literature on ETO, materials management and performance management and measurement as a starting point. The paper presents the proposed PMS. It provides a basis for further studies on the topic, and could be used by managers in ETO companies to assess and improve their materials management practice.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Sjøbakk B, Bondarenko O, Kamran T (2014) A performance measurement system to support materials management in engineer-to-order companies. Adv Mater Res 1039:569–576CrossRef Sjøbakk B, Bondarenko O, Kamran T (2014) A performance measurement system to support materials management in engineer-to-order companies. Adv Mater Res 1039:569–576CrossRef
2.
Zurück zum Zitat Amaro G, Hendry L, Kingsman B (1999) Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. Int J Oper Prod Manag 19(4):349–371CrossRef Amaro G, Hendry L, Kingsman B (1999) Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. Int J Oper Prod Manag 19(4):349–371CrossRef
3.
Zurück zum Zitat Olhager J (2003) Strategic positioning of the order penetration point. Int J Prod Econ 85:319–329CrossRef Olhager J (2003) Strategic positioning of the order penetration point. Int J Prod Econ 85:319–329CrossRef
4.
Zurück zum Zitat Beckman SL, Rosenfield DB (2008) Operations strategy, competing in the 21st century. McGraw-Hill, New York Beckman SL, Rosenfield DB (2008) Operations strategy, competing in the 21st century. McGraw-Hill, New York
5.
Zurück zum Zitat Persona A, Regattieri A, Romano P (2004) An integrated reference model for production planning and control in SMEs. J Manuf Technol Manag 15(7):626–640CrossRef Persona A, Regattieri A, Romano P (2004) An integrated reference model for production planning and control in SMEs. J Manuf Technol Manag 15(7):626–640CrossRef
6.
Zurück zum Zitat Sjøbakk B, Bakås O (2014) Designing an engineer-to-order performance measurement system: a case study. In: Advances in production management systems innovative and knowledge-based production management in a global-local world. Springer, Ajaccio, pp 473–480 Sjøbakk B, Bakås O (2014) Designing an engineer-to-order performance measurement system: a case study. In: Advances in production management systems innovative and knowledge-based production management in a global-local world. Springer, Ajaccio, pp 473–480
7.
Zurück zum Zitat Neely A, Gregory M, Platts K (1995) Performance measurement system design: a literature review and research agenda. Int J Oper Prod Manag 15(4):80–116CrossRef Neely A, Gregory M, Platts K (1995) Performance measurement system design: a literature review and research agenda. Int J Oper Prod Manag 15(4):80–116CrossRef
8.
Zurück zum Zitat Bourne M, Mills J, Wilcox M et al (2000) Designing, implementing and updating performance measurement systems. Int J Oper Prod Manag 20(7):754–771CrossRef Bourne M, Mills J, Wilcox M et al (2000) Designing, implementing and updating performance measurement systems. Int J Oper Prod Manag 20(7):754–771CrossRef
9.
Zurück zum Zitat Greenwood DJ, Levin M (2007) Introduction to action research: social research for social change. Sage, Thousand Oaks Greenwood DJ, Levin M (2007) Introduction to action research: social research for social change. Sage, Thousand Oaks
10.
Zurück zum Zitat McKay J, Marshall P (2001) The dual imperatives of action research. Inform Technol People 14(1):46–59CrossRef McKay J, Marshall P (2001) The dual imperatives of action research. Inform Technol People 14(1):46–59CrossRef
11.
Zurück zum Zitat Andersen B, Fagerhaug T (2002) Performance measurement explained: designing and implementing your state-of-the-art system. ASQ Quality Press, Wisconsin Andersen B, Fagerhaug T (2002) Performance measurement explained: designing and implementing your state-of-the-art system. ASQ Quality Press, Wisconsin
12.
Zurück zum Zitat Wortmann J (1992) Production management systems for one-of-a-kind products. Comput Ind 19(1):79–88CrossRef Wortmann J (1992) Production management systems for one-of-a-kind products. Comput Ind 19(1):79–88CrossRef
13.
Zurück zum Zitat Porter K, Little D, Peck M et al (1999) Manufacturing classifications: relationships with production control systems. Integr Manuf Syst 10(4):189–199CrossRef Porter K, Little D, Peck M et al (1999) Manufacturing classifications: relationships with production control systems. Integr Manuf Syst 10(4):189–199CrossRef
14.
Zurück zum Zitat Hicks C, Mcgovern T, Earl CF (2001) A typology of UK engineer-to-order companies. Int J Logist 4(1):43–56CrossRef Hicks C, Mcgovern T, Earl CF (2001) A typology of UK engineer-to-order companies. Int J Logist 4(1):43–56CrossRef
15.
Zurück zum Zitat Wacker JG, Miller M (2000) Configure-to-order planning bills of material: simplifying a complex product structure for manufacturing planning and control. Prod Invent Manag J 41(2):21–26 Wacker JG, Miller M (2000) Configure-to-order planning bills of material: simplifying a complex product structure for manufacturing planning and control. Prod Invent Manag J 41(2):21–26
16.
Zurück zum Zitat Wikner J, Rudberg M (2005) Integrating production and engineering perspectives on the customer order decoupling point. Int J Oper Prod Manag 25(7):623–641CrossRef Wikner J, Rudberg M (2005) Integrating production and engineering perspectives on the customer order decoupling point. Int J Oper Prod Manag 25(7):623–641CrossRef
17.
Zurück zum Zitat Bertrand J, Muntslag D (1993) Production control in engineer-to-order firms. Int J Prod Econ 30:3–22CrossRef Bertrand J, Muntslag D (1993) Production control in engineer-to-order firms. Int J Prod Econ 30:3–22CrossRef
18.
Zurück zum Zitat Hill T (1993) Manufacturing strategy: the strategic management of the manufacturing function. Macmillan, London Hill T (1993) Manufacturing strategy: the strategic management of the manufacturing function. Macmillan, London
19.
Zurück zum Zitat Stavrulaki E, Davis M (2010) Aligning products with supply chain processes and strategy. Int J Logist Manag 21(1):127–151CrossRef Stavrulaki E, Davis M (2010) Aligning products with supply chain processes and strategy. Int J Logist Manag 21(1):127–151CrossRef
20.
Zurück zum Zitat Holweg M, Pil FK (2001) Start with the customer. MIT Sloan Manag Rev 43(1):74–83 Holweg M, Pil FK (2001) Start with the customer. MIT Sloan Manag Rev 43(1):74–83
21.
Zurück zum Zitat Krajewski L, Wei JC, Tang LL (2005) Responding to schedule changes in build-to-order supply chains. J Oper Manag 23(5):452–469CrossRef Krajewski L, Wei JC, Tang LL (2005) Responding to schedule changes in build-to-order supply chains. J Oper Manag 23(5):452–469CrossRef
22.
Zurück zum Zitat Fredriksson P, Gadde LE (2005) Flexibility and rigidity in customization and build-to-order production. Ind Mark Manag 34(7):695–705CrossRef Fredriksson P, Gadde LE (2005) Flexibility and rigidity in customization and build-to-order production. Ind Mark Manag 34(7):695–705CrossRef
23.
Zurück zum Zitat Gunasekaran A, Ngai EWT (2005) Build-to-order supply chain management: a literature review and framework for development. J Oper Manag 23(5):423–451CrossRef Gunasekaran A, Ngai EWT (2005) Build-to-order supply chain management: a literature review and framework for development. J Oper Manag 23(5):423–451CrossRef
24.
Zurück zum Zitat Gosling J, Naim MM (2009) Engineer-to-order supply chain management: a literature review and research agenda. Int J Prod Econ 122(2):741–754 Gosling J, Naim MM (2009) Engineer-to-order supply chain management: a literature review and research agenda. Int J Prod Econ 122(2):741–754
25.
Zurück zum Zitat Sjøbakk B, Thomassen MK, Alfnes E (2014) Implications of automation in engineer-to-order production: a case study. Adv Manuf 2(2):1–9CrossRef Sjøbakk B, Thomassen MK, Alfnes E (2014) Implications of automation in engineer-to-order production: a case study. Adv Manuf 2(2):1–9CrossRef
26.
Zurück zum Zitat Hicks C, McGovern T, Earl C (2000) Supply chain management: a strategic issue in engineer to order manufacturing. Int J Prod Econ 65(2):179–190 Hicks C, McGovern T, Earl C (2000) Supply chain management: a strategic issue in engineer to order manufacturing. Int J Prod Econ 65(2):179–190
27.
Zurück zum Zitat McGovern T, Hicks C, Earl CF (1999) Modelling supply chain management processes in engineer-to-order companies. Int J Logist 2(2):147–159CrossRef McGovern T, Hicks C, Earl CF (1999) Modelling supply chain management processes in engineer-to-order companies. Int J Logist 2(2):147–159CrossRef
28.
Zurück zum Zitat Riley DR, Diller BE, Kerr D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. J Constr Eng Manag 131(9):953–962CrossRef Riley DR, Diller BE, Kerr D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. J Constr Eng Manag 131(9):953–962CrossRef
29.
Zurück zum Zitat Caron F, Fiore A (1995) ‘Engineer to order’ companies: how to integrate manufacturing and innovative processes. Int J Proj Manag 13(5):313–319 Caron F, Fiore A (1995) ‘Engineer to order’ companies: how to integrate manufacturing and innovative processes. Int J Proj Manag 13(5):313–319
30.
Zurück zum Zitat Konijnendijk PA (1994) Coordinating marketing and manufacturing in ETO companies. Int J Prod Econ 37(1):19–26CrossRef Konijnendijk PA (1994) Coordinating marketing and manufacturing in ETO companies. Int J Prod Econ 37(1):19–26CrossRef
31.
Zurück zum Zitat Kingsman B, Worden L, Hendry L et al (1993) Integrating marketing and production planning in make-to-order companies. Int J Prod Econ 30:53–66CrossRef Kingsman B, Worden L, Hendry L et al (1993) Integrating marketing and production planning in make-to-order companies. Int J Prod Econ 30:53–66CrossRef
32.
Zurück zum Zitat Hicks C, Braiden P (2000) Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. Int J Prod Res 38(18):4783–4810MATHCrossRef Hicks C, Braiden P (2000) Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. Int J Prod Res 38(18):4783–4810MATHCrossRef
33.
Zurück zum Zitat Muntslag DR (1994) Profit and risk evaluation in customer driven engineering and manufacturing. Int J Prod Econ 36(1):97–107CrossRef Muntslag DR (1994) Profit and risk evaluation in customer driven engineering and manufacturing. Int J Prod Econ 36(1):97–107CrossRef
34.
Zurück zum Zitat Little D, Rollins R, Peck M et al (2000) Integrated planning and scheduling in the engineer-to-order sector. Int J Comput Integr Manuf 13(6):545–554CrossRef Little D, Rollins R, Peck M et al (2000) Integrated planning and scheduling in the engineer-to-order sector. Int J Comput Integr Manuf 13(6):545–554CrossRef
35.
Zurück zum Zitat Terwiesch C, Loch CH (1999) Managing the process of engineering change orders: the case of the climate control system in automobile development. J Prod Innov Manag 16(2):160–172CrossRef Terwiesch C, Loch CH (1999) Managing the process of engineering change orders: the case of the climate control system in automobile development. J Prod Innov Manag 16(2):160–172CrossRef
36.
Zurück zum Zitat Danese P, Romano P (2004) Improving inter-functional coordination to face high product variety and frequent modifications. Int J Oper Prod Manag 24(9–10):863–885 Danese P, Romano P (2004) Improving inter-functional coordination to face high product variety and frequent modifications. Int J Oper Prod Manag 24(9–10):863–885
37.
Zurück zum Zitat Pandit A, Zhu Y (2007) An ontology-based approach to support decision-making for the design of ETO (Engineer-to-Order) products. Autom Constr 16(6):759–770 Pandit A, Zhu Y (2007) An ontology-based approach to support decision-making for the design of ETO (Engineer-to-Order) products. Autom Constr 16(6):759–770
38.
Zurück zum Zitat Parthiban P, Goh M (2011) An integrated model for performance management of manufacturing units. Benchmarking Int J 18(2):261–281CrossRef Parthiban P, Goh M (2011) An integrated model for performance management of manufacturing units. Benchmarking Int J 18(2):261–281CrossRef
39.
Zurück zum Zitat de Leeuw S, van den Berg JP (2011) Improving operational performance by influencing shopfloor behavior via performance management practices. J Oper Manag 29(3):224–235CrossRef de Leeuw S, van den Berg JP (2011) Improving operational performance by influencing shopfloor behavior via performance management practices. J Oper Manag 29(3):224–235CrossRef
40.
Zurück zum Zitat Fortuin L (1988) Performance indicators: why, where and how? Eur J Oper Res 34(1):1–9 Fortuin L (1988) Performance indicators: why, where and how? Eur J Oper Res 34(1):1–9
41.
Zurück zum Zitat Behn RD (2003) Why measure performance? Different purposes require different measures. Public Adm Rev 63(5):586–606CrossRef Behn RD (2003) Why measure performance? Different purposes require different measures. Public Adm Rev 63(5):586–606CrossRef
42.
Zurück zum Zitat Kaplan RS, Norton DP (1996) Using the balanced scorecard as a strategic management system. Harv Bus Rev 74(1):75–85 Kaplan RS, Norton DP (1996) Using the balanced scorecard as a strategic management system. Harv Bus Rev 74(1):75–85
43.
Zurück zum Zitat Stephens S (2001) The supply chain council and the supply chain operations reference model. Supply Chain Manag 1:9–13 Stephens S (2001) The supply chain council and the supply chain operations reference model. Supply Chain Manag 1:9–13
44.
Zurück zum Zitat Browne J, Devlin J, Rolstadas A et al (1997) Performance measurement: the ENAPS approach. Int J Bus Transform 1:73–84 Browne J, Devlin J, Rolstadas A et al (1997) Performance measurement: the ENAPS approach. Int J Bus Transform 1:73–84
45.
Zurück zum Zitat Plemmons JK, Bell LC (1995) Measuring effectiveness of materials management process. J Manag Eng 11(6):26–32CrossRef Plemmons JK, Bell LC (1995) Measuring effectiveness of materials management process. J Manag Eng 11(6):26–32CrossRef
46.
Zurück zum Zitat Beatham S, Anumba C, Thorpe T et al (2004) KPIs: a critical appraisal of their use in construction. Benchmarking Int J 11(1):93–117CrossRef Beatham S, Anumba C, Thorpe T et al (2004) KPIs: a critical appraisal of their use in construction. Benchmarking Int J 11(1):93–117CrossRef
47.
Zurück zum Zitat Chan AP, Chan AP (2004) Key performance indicators for measuring construction success. Benchmarking Int J 11(2):203–221CrossRef Chan AP, Chan AP (2004) Key performance indicators for measuring construction success. Benchmarking Int J 11(2):203–221CrossRef
48.
Zurück zum Zitat Takim R, Akintoye A (2002) Performance indicators for successful construction project performance, In: The 18th annual ARCOM conference, Northumbria, UK, pp 545–555 Takim R, Akintoye A (2002) Performance indicators for successful construction project performance, In: The 18th annual ARCOM conference, Northumbria, UK, pp 545–555
49.
Zurück zum Zitat Robinson HS, Carrillo PM, Anumba CJ et al (2005) Review and implementation of performance management models in construction engineering organizations. Constr Innov Inf Process Manag 5(4):203–217CrossRef Robinson HS, Carrillo PM, Anumba CJ et al (2005) Review and implementation of performance management models in construction engineering organizations. Constr Innov Inf Process Manag 5(4):203–217CrossRef
50.
Zurück zum Zitat Navon R (2007) Research in automated measurement of project performance indicators. Autom Constr 16(2):176–188MathSciNetCrossRef Navon R (2007) Research in automated measurement of project performance indicators. Autom Constr 16(2):176–188MathSciNetCrossRef
51.
Zurück zum Zitat Gunasekaran A, Patel C, Tirtiroglu E (2001) Performance measures and metrics in a supply chain environment. Int J Oper Prod Manag 21(1–2):71–87 Gunasekaran A, Patel C, Tirtiroglu E (2001) Performance measures and metrics in a supply chain environment. Int J Oper Prod Manag 21(1–2):71–87
52.
Zurück zum Zitat Chae BK (2009) Developing key performance indicators for supply chain: an industry perspective. Supply Chain Manag Int J 14(6):422–428MathSciNetCrossRef Chae BK (2009) Developing key performance indicators for supply chain: an industry perspective. Supply Chain Manag Int J 14(6):422–428MathSciNetCrossRef
53.
Zurück zum Zitat Beamon BM (1999) Measuring supply chain performance. Int J Oper Prod Manag 19(3):275–292CrossRef Beamon BM (1999) Measuring supply chain performance. Int J Oper Prod Manag 19(3):275–292CrossRef
54.
Zurück zum Zitat Gunasekaran A, Kobu B (2007) Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995–2004) for research and applications. Int J Prod Res 45(12):2819–2840MATHCrossRef Gunasekaran A, Kobu B (2007) Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995–2004) for research and applications. Int J Prod Res 45(12):2819–2840MATHCrossRef
55.
Zurück zum Zitat Gaur V, Fisher ML, Raman A (2005) An econometric analysis of inventory turnover performance in retail services. Manag Sci 51(2):181–194MATHCrossRef Gaur V, Fisher ML, Raman A (2005) An econometric analysis of inventory turnover performance in retail services. Manag Sci 51(2):181–194MATHCrossRef
56.
Zurück zum Zitat Parmenter D (2010) Key performance indicators (KPI): developing, implementing, and using winning KPIs. Wiley, Hoboken Parmenter D (2010) Key performance indicators (KPI): developing, implementing, and using winning KPIs. Wiley, Hoboken
Metadaten
Titel
Designing a performance measurement system to support materials management in engineer-to-order: a case study
verfasst von
Børge Sjøbakk
Ottar Bakås
Oksana Bondarenko
Tara Kamran
Publikationsdatum
01.06.2015
Verlag
Shanghai University
Erschienen in
Advances in Manufacturing / Ausgabe 2/2015
Print ISSN: 2095-3127
Elektronische ISSN: 2195-3597
DOI
https://doi.org/10.1007/s40436-015-0109-2

Weitere Artikel der Ausgabe 2/2015

Advances in Manufacturing 2/2015 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.