23.07.2020 | Original Paper

Determination of initial stress state and rock mass deformation modulus at Lavarak HEPP by back analysis using ant colony optimization and multivariable regression analysis

verfasst von: Ebrahim Ghorbani, Mahdi Moosavi, Mohammad Farouq Hossaini, Mehdi Assary, Yousef Golabchi

Erschienen in: Bulletin of Engineering Geology and the Environment | Ausgabe 1/2021

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

During the design and construction of a project, determination of geomechanical parameters is a key factor for its success. Back analysis is an appropriate method to reduce in situ and field measurements during site investigation and design phase of the projects. Over the past decades, displacement measurements were used as input data for back analysis of geomechanical parameters. In back analysis, an important factor is to choose an appropriate algorithm to minimize the magnitude of the error function in order to reduce the difference between measured and calculated displacements. In this paper, two methods, i.e. continuous ant colony algorithm (CACA) and multivariable regression (MR), were applied to calculate optimized values for four geomechanical parameters in “Lavarak” underground hydroelectric power plant cavern in Iran. These four parameters are maximum principal stress, minimum principal stress, the angle between maximum principal stress and the horizontal axis, and the deformation modulus of the rock mass. Initially, back analysis was conducted with CACA. For this purpose, CACA was programmed in Phase2 software used for numerical modelling to calculate the displacement of the measuring points. Then, back analysis of four parameters was done with both linear and nonlinear MR using Phase2, and the optimized values were calculated. According to the Lar Consulting Engineers’ data for Lavarak HEPP, the results show lower general error function values of CACA than MR. In other words, CACA algorithm shows better performance for obtaining optimal values and for having more accurate calculations. CACA shows better performance for back-calculation of the maximum principal stress, the angel of maximum principal stress, and the deformation modulus of the rock mass.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Amusin B, Shick V, Lama R (1992) Using back analysis to estimate geotechnical field parameters for the design of support systems for tunnels. Tunn Undergr Space Technol 7:281–284CrossRef Amusin B, Shick V, Lama R (1992) Using back analysis to estimate geotechnical field parameters for the design of support systems for tunnels. Tunn Undergr Space Technol 7:281–284CrossRef
Zurück zum Zitat Cai M, Morioka H, Kaiser P, Tasaka Y, Kurose H, Minami M, Maejima T (2007) Back-analysis of rock mass strength parameters using AE monitoring data. Int J Rock Mech Min Sci 44:538–549CrossRef Cai M, Morioka H, Kaiser P, Tasaka Y, Kurose H, Minami M, Maejima T (2007) Back-analysis of rock mass strength parameters using AE monitoring data. Int J Rock Mech Min Sci 44:538–549CrossRef
Zurück zum Zitat Chen B, Zhao H, Ru Z, Li X (2015) Probabilistic back analysis for geotechnical engineering based on Bayesian and support vector machine. J Cent South Univ 22:4778–4786CrossRef Chen B, Zhao H, Ru Z, Li X (2015) Probabilistic back analysis for geotechnical engineering based on Bayesian and support vector machine. J Cent South Univ 22:4778–4786CrossRef
Zurück zum Zitat Cividini A, Jurina L, Gioda G Some aspects of characterization problems in geomechanics. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 1981. vol 6. Elsevier, pp 487–503 Cividini A, Jurina L, Gioda G Some aspects of characterization problems in geomechanics. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 1981. vol 6. Elsevier, pp 487–503
Zurück zum Zitat Costa D, Hertz A (1997) Ants can colour graphs. J Oper Res Soc 48:295–305CrossRef Costa D, Hertz A (1997) Ants can colour graphs. J Oper Res Soc 48:295–305CrossRef
Zurück zum Zitat De Mello Franco J, Armelin J, Santiago J, Telles J, Mansur W (2002) Determination of the natural stress state in a Brazilian rock mass by back analysing excavation measurements: a case study. Int J Rock Mech Min Sci 39:1005–1032CrossRef De Mello Franco J, Armelin J, Santiago J, Telles J, Mansur W (2002) Determination of the natural stress state in a Brazilian rock mass by back analysing excavation measurements: a case study. Int J Rock Mech Min Sci 39:1005–1032CrossRef
Zurück zum Zitat Dorigo M (1992) Optimization, learning and natural algorithms. PhD Dissertation, Politecnico di Milano, Italy Dorigo M (1992) Optimization, learning and natural algorithms. PhD Dissertation, Politecnico di Milano, Italy
Zurück zum Zitat Dorigo M, Gambardella LM (1997) Ant colony system: a cooperative learning approach to the traveling salesman problem IEEE. Transactions on evolutionary computation 1:53–66CrossRef Dorigo M, Gambardella LM (1997) Ant colony system: a cooperative learning approach to the traveling salesman problem IEEE. Transactions on evolutionary computation 1:53–66CrossRef
Zurück zum Zitat Dorigo M, Thomas S (2004) Ant colony optimization. Cambridge, vol. 9, Dec. 2002. MIT Press Dorigo M, Thomas S (2004) Ant colony optimization. Cambridge, vol. 9, Dec. 2002. MIT Press
Zurück zum Zitat Dorigo M, Maniezzo V, Colorni A (1996) Ant system: optimization by a colony of cooperating agents IEEE. Transactions on systems, man, and cybernetics. Part B (Cybernetics) 26:29–41CrossRef Dorigo M, Maniezzo V, Colorni A (1996) Ant system: optimization by a colony of cooperating agents IEEE. Transactions on systems, man, and cybernetics. Part B (Cybernetics) 26:29–41CrossRef
Zurück zum Zitat Feng Z, Lewis R (1987) Optimal estimation of in-situ ground stresses from displacement measurements. Int J Numer Anal Methods Geomech 11:391–408CrossRef Feng Z, Lewis R (1987) Optimal estimation of in-situ ground stresses from displacement measurements. Int J Numer Anal Methods Geomech 11:391–408CrossRef
Zurück zum Zitat Feng X-T, Zhang Z, Sheng Q (2000) Estimating mechanical rock mass parameters relating to the three gorges project permanent shiplock using an intelligent displacement back analysis method. Int J Rock Mech Min Sci 37:1039–1054CrossRef Feng X-T, Zhang Z, Sheng Q (2000) Estimating mechanical rock mass parameters relating to the three gorges project permanent shiplock using an intelligent displacement back analysis method. Int J Rock Mech Min Sci 37:1039–1054CrossRef
Zurück zum Zitat Gagné C, Price W, Gravel M (2002) Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times. J Oper Res Soc 53:895–906CrossRef Gagné C, Price W, Gravel M (2002) Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times. J Oper Res Soc 53:895–906CrossRef
Zurück zum Zitat Gambardella LM, Taillard É, Agazzi G (1999) MACS-VRPTW: a multiple ant colony system for vehicle routing problems with time windows. New ideas in optimization Gambardella LM, Taillard É, Agazzi G (1999) MACS-VRPTW: a multiple ant colony system for vehicle routing problems with time windows. New ideas in optimization
Zurück zum Zitat Gao W (2015) Displacement back analysis for underground engineering based on immunized continuous ant colony optimization. Engineering Optimization 48:1–15 Gao W (2015) Displacement back analysis for underground engineering based on immunized continuous ant colony optimization. Engineering Optimization 48:1–15
Zurück zum Zitat Ghorbani M, Sharifzadeh M (2009) Long term stability assessment of Siah Bisheh powerhouse cavern based on displacement back analysis method. Tunn Undergr Space Technol 24:574–583CrossRef Ghorbani M, Sharifzadeh M (2009) Long term stability assessment of Siah Bisheh powerhouse cavern based on displacement back analysis method. Tunn Undergr Space Technol 24:574–583CrossRef
Zurück zum Zitat Gioda G (1985) Some remarks on back analysis and characterization problems. International conference on numerical methods in geomechanics pp 47–61 Gioda G (1985) Some remarks on back analysis and characterization problems. International conference on numerical methods in geomechanics pp 47–61
Zurück zum Zitat Gioda G, Maier G (1980) Direct search solution of an inverse problem in elastoplasticity: identification of cohesion, friction angle and in situ stress by pressure tunnel tests. Int J Numer Methods Eng 15:1823–1848CrossRef Gioda G, Maier G (1980) Direct search solution of an inverse problem in elastoplasticity: identification of cohesion, friction angle and in situ stress by pressure tunnel tests. Int J Numer Methods Eng 15:1823–1848CrossRef
Zurück zum Zitat Gioda G, Sakurai S (1987) Back analysis procedures for the interpretation of field measurements in geomechanics. Int J Numer Anal Methods Geomech 11:555–583CrossRef Gioda G, Sakurai S (1987) Back analysis procedures for the interpretation of field measurements in geomechanics. Int J Numer Anal Methods Geomech 11:555–583CrossRef
Zurück zum Zitat Jeon Y, Yang H (2004) Development of a back analysis algorithm using FLAC. Int J Rock Mech Min Sci 41:447–453CrossRef Jeon Y, Yang H (2004) Development of a back analysis algorithm using FLAC. Int J Rock Mech Min Sci 41:447–453CrossRef
Zurück zum Zitat Jia Y, Chi S (2015) Back-analysis of soil parameters of the Malutang II concrete face rockfill dam using parallel mutation particle swarm optimization. Comput Geotech 65:87–96CrossRef Jia Y, Chi S (2015) Back-analysis of soil parameters of the Malutang II concrete face rockfill dam using parallel mutation particle swarm optimization. Comput Geotech 65:87–96CrossRef
Zurück zum Zitat Kaiser P, Zou D, Lang P (1990) Stress determination by back-analysis of excavation-induced stress changes—a case study. Rock Mech Rock Eng 23:185–200CrossRef Kaiser P, Zou D, Lang P (1990) Stress determination by back-analysis of excavation-induced stress changes—a case study. Rock Mech Rock Eng 23:185–200CrossRef
Zurück zum Zitat Li F, Wang J, Brigham JC (2014) Inverse calculation of insitu stress in rock mass using the surrogate-model accelerated random search algorithm. Comput Geotech 61:24–32CrossRef Li F, Wang J, Brigham JC (2014) Inverse calculation of insitu stress in rock mass using the surrogate-model accelerated random search algorithm. Comput Geotech 61:24–32CrossRef
Zurück zum Zitat Liang Z, Gong B, Tang C, Zhang Y, Ma T (2014) Displacement back analysis for a high slope of the Dagangshan Hydroelectric Power Station based on BP neural network and particle swarm optimization. The Scientific World Journal Liang Z, Gong B, Tang C, Zhang Y, Ma T (2014) Displacement back analysis for a high slope of the Dagangshan Hydroelectric Power Station based on BP neural network and particle swarm optimization. The Scientific World Journal
Zurück zum Zitat Merkle D, Middendorf M, Schmeck H (2002) Ant colony optimization for resource-constrained project scheduling. IEEE Trans Evol Comput 6:333–346CrossRef Merkle D, Middendorf M, Schmeck H (2002) Ant colony optimization for resource-constrained project scheduling. IEEE Trans Evol Comput 6:333–346CrossRef
Zurück zum Zitat Miranda T, Dias D, Eclaircy-Caudron S, Correia AG, Costa L (2011) Back analysis of geomechanical parameters by optimisation of a 3D model of an underground structure. Tunn Undergr Space Technol 26:659–673CrossRef Miranda T, Dias D, Eclaircy-Caudron S, Correia AG, Costa L (2011) Back analysis of geomechanical parameters by optimisation of a 3D model of an underground structure. Tunn Undergr Space Technol 26:659–673CrossRef
Zurück zum Zitat Nadimi S, Shahriar K, Sharifzadeh M, Moarefvand P (2011) Triaxial creep tests and back analysis of time-dependent behavior of Siah Bisheh cavern by 3-dimensional distinct element method. Tunn Undergr Space Technol 26:155–162CrossRef Nadimi S, Shahriar K, Sharifzadeh M, Moarefvand P (2011) Triaxial creep tests and back analysis of time-dependent behavior of Siah Bisheh cavern by 3-dimensional distinct element method. Tunn Undergr Space Technol 26:155–162CrossRef
Zurück zum Zitat Oreste P (2005) Back-analysis techniques for the improvement of the understanding of rock in underground constructions. Tunn Undergr Space Technol 20:7–21CrossRef Oreste P (2005) Back-analysis techniques for the improvement of the understanding of rock in underground constructions. Tunn Undergr Space Technol 20:7–21CrossRef
Zurück zum Zitat Park D, Park E-S (2015) Inverse parameter fitting of tunnels using a response surface approach. Int J Rock Mech Min Sci 77:11–18CrossRef Park D, Park E-S (2015) Inverse parameter fitting of tunnels using a response surface approach. Int J Rock Mech Min Sci 77:11–18CrossRef
Zurück zum Zitat Pichler B, Lackner R, Mang HA (2003) Back analysis of model parameters in geotechnical engineering by means of soft computing. Int J Numer Methods Eng 57:1943–1978CrossRef Pichler B, Lackner R, Mang HA (2003) Back analysis of model parameters in geotechnical engineering by means of soft computing. Int J Numer Methods Eng 57:1943–1978CrossRef
Zurück zum Zitat Sakurai S (1993) Back analysis in rock engineering. Comprehensive Rock Mechanics 4:543–569 Sakurai S (1993) Back analysis in rock engineering. Comprehensive Rock Mechanics 4:543–569
Zurück zum Zitat Sakurai S, Takeuchi K (1983) Back analysis of measured displacements of tunnels. Rock Mech Rock Eng 16:173–180CrossRef Sakurai S, Takeuchi K (1983) Back analysis of measured displacements of tunnels. Rock Mech Rock Eng 16:173–180CrossRef
Zurück zum Zitat Sakurai S, Akutagawa S, Takeuchi K, Shinji M, Shimizu N (2001) Back analysis for observational methods in tunneling engineering. Proceedings of the International Symposium on Modern Tunneling Science and Technology, IS-Kyoto, pp 1165–1188 Sakurai S, Akutagawa S, Takeuchi K, Shinji M, Shimizu N (2001) Back analysis for observational methods in tunneling engineering. Proceedings of the International Symposium on Modern Tunneling Science and Technology, IS-Kyoto, pp 1165–1188
Zurück zum Zitat Shang Y, Cai J, Hao W, Wu X, Li S (2002) Intelligent back analysis of displacements using precedent type analysis for tunneling. Tunnelling and Underground Space Technology 17:381–389CrossRef Shang Y, Cai J, Hao W, Wu X, Li S (2002) Intelligent back analysis of displacements using precedent type analysis for tunneling. Tunnelling and Underground Space Technology 17:381–389CrossRef
Zurück zum Zitat Sharifzadeh M, Tarifard A, Moridi MA (2013) Time-dependent behavior of tunnel lining in weak rock mass based on displacement back analysis method. Tunn Undergr Space Technol 38:348–356CrossRef Sharifzadeh M, Tarifard A, Moridi MA (2013) Time-dependent behavior of tunnel lining in weak rock mass based on displacement back analysis method. Tunn Undergr Space Technol 38:348–356CrossRef
Zurück zum Zitat Socha K, Dorigo M (2008) Ant colony optimization for continuous domains. Eur J Oper Res 185:1155–1173CrossRef Socha K, Dorigo M (2008) Ant colony optimization for continuous domains. Eur J Oper Res 185:1155–1173CrossRef
Zurück zum Zitat Stützle T, Hoos HH (2000) MAX–MIN ant system. Futur Gener Comput Syst 16:889–914CrossRef Stützle T, Hoos HH (2000) MAX–MIN ant system. Futur Gener Comput Syst 16:889–914CrossRef
Zurück zum Zitat Tian H, Chen W, Yang D, Dai Y, Yang J (2015) Application of the orthogonal design method in geotechnical parameter back analysis for underground structures. Bull Eng Geol Environ 75:239–249CrossRef Tian H, Chen W, Yang D, Dai Y, Yang J (2015) Application of the orthogonal design method in geotechnical parameter back analysis for underground structures. Bull Eng Geol Environ 75:239–249CrossRef
Zurück zum Zitat Yazdani M, Sharifzadeh M, Kamrani K, Ghorbani M (2012) Displacement-based numerical back analysis for estimation of rock mass parameters in Siah Bisheh powerhouse cavern using continuum and discontinuum approach. Tunn Undergr Space Technol 28:41–48CrossRef Yazdani M, Sharifzadeh M, Kamrani K, Ghorbani M (2012) Displacement-based numerical back analysis for estimation of rock mass parameters in Siah Bisheh powerhouse cavern using continuum and discontinuum approach. Tunn Undergr Space Technol 28:41–48CrossRef
Zurück zum Zitat Yong-song L, Jian-min Y, Jian-ping C, Jing X (2012) Analysis of 3D in-situ stress field and query system’s development based on visual BP neural network. Procedia Earth and Planetary Science 5:64–69CrossRef Yong-song L, Jian-min Y, Jian-ping C, Jing X (2012) Analysis of 3D in-situ stress field and query system’s development based on visual BP neural network. Procedia Earth and Planetary Science 5:64–69CrossRef
Zurück zum Zitat Zhang L, Yue Z, Yang Z, Qi J, Liu F (2006) A displacement-based back-analysis method for rock mass modulus and horizontal in situ stress in tunneling–illustrated with a case study. Tunn Undergr Space Technol 21:636–649CrossRef Zhang L, Yue Z, Yang Z, Qi J, Liu F (2006) A displacement-based back-analysis method for rock mass modulus and horizontal in situ stress in tunneling–illustrated with a case study. Tunn Undergr Space Technol 21:636–649CrossRef
Zurück zum Zitat Zhang J, Tang WH, Zhang L (2009) Efficient probabilistic back-analysis of slope stability model parameters. J Geotech Geoenviron 136:99–109CrossRef Zhang J, Tang WH, Zhang L (2009) Efficient probabilistic back-analysis of slope stability model parameters. J Geotech Geoenviron 136:99–109CrossRef
Zurück zum Zitat Zhao B, Zhang L, Jeng D, Wang J, Chen J (2015) Inverse analysis of deep excavation using differential evolution algorithm. Int J Numer Anal Methods Geomech 39:115–134CrossRef Zhao B, Zhang L, Jeng D, Wang J, Chen J (2015) Inverse analysis of deep excavation using differential evolution algorithm. Int J Numer Anal Methods Geomech 39:115–134CrossRef
Zurück zum Zitat Zhifa Y, Lee C, Sijing W (2000) Three-dimensional back-analysis of displacements in exploration adits-principles and application. Int J Rock Mech Min Sci 37:525–533CrossRef Zhifa Y, Lee C, Sijing W (2000) Three-dimensional back-analysis of displacements in exploration adits-principles and application. Int J Rock Mech Min Sci 37:525–533CrossRef
Metadaten
Titel
Determination of initial stress state and rock mass deformation modulus at Lavarak HEPP by back analysis using ant colony optimization and multivariable regression analysis
verfasst von
Ebrahim Ghorbani
Mahdi Moosavi
Mohammad Farouq Hossaini
Mehdi Assary
Yousef Golabchi
Publikationsdatum
23.07.2020
Verlag
Springer Berlin Heidelberg
Erschienen in
Bulletin of Engineering Geology and the Environment / Ausgabe 1/2021
Print ISSN: 1435-9529
Elektronische ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-020-01936-2

Weitere Artikel der Ausgabe 1/2021

Bulletin of Engineering Geology and the Environment 1/2021 Zur Ausgabe