Skip to main content

2020 | OriginalPaper | Buchkapitel

Determining Criticality of Performance Indicators for a Construction Company

verfasst von : K. K. Tripathi, K. N. Jha, A. K. Jain

Erschienen in: ICSBE 2018

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Because of stiff competition in the construction business, it is necessary for construction companies to measure their performance on a regular interval for long-term survival. Therefore, it is imperative for construction companies to determine the parameters critical to the measurement of their performance. This study identifies the performance indicators, financial as well as non-financial, for construction companies to measure their performance. In a previous study, the authors identified a total of 20 performance attributes and applied principal component analysis which extracted six components called performance indicators. These performance indicators are profitability and asset management; key stakeholders’ satisfaction; time and cost predictability; environment, health, and safety; quality consciousness; and employee turnover. The present study utilized structural equation modelling (SEM) to determine the criticality of these performance indicators for which a questionnaire survey and structured interview approach were adopted. A total of 106 responses were collected from 90 different construction companies operating in various parts of India. The findings indicate that ‘quality consciousness’ is the most critical performance indicator whereas the ‘employee turnover’ is the least critical performance indicator in measuring the performance of a construction company. The performance indicators obtained from this study may help construction companies to measure and compare their performances with their competitors and setting out a strategy to remain competitive in the market.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Ali HAEM, Al-Sulaihi IA, Al-Gahtani KS (2013) Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. J King Saud Univ - Eng Sci 25:125–134 Ali HAEM, Al-Sulaihi IA, Al-Gahtani KS (2013) Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. J King Saud Univ - Eng Sci 25:125–134
Zurück zum Zitat Balatbat MCA, Lin C, Carmichael DG (2010) Comparative performance of publicly listed construction companies: Australian evidence. Constr Manag Econ 28(9):919–932CrossRef Balatbat MCA, Lin C, Carmichael DG (2010) Comparative performance of publicly listed construction companies: Australian evidence. Constr Manag Econ 28(9):919–932CrossRef
Zurück zum Zitat Bassioni HA, Price ADF, Hassan TM (2004) Performance measurement in construction. J Manag Eng ASCE 20(2):42–50CrossRef Bassioni HA, Price ADF, Hassan TM (2004) Performance measurement in construction. J Manag Eng ASCE 20(2):42–50CrossRef
Zurück zum Zitat Bassioni HA, Price ADF, Hassan TM (2005) Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Constr Manag Econ 23(5):495–507CrossRef Bassioni HA, Price ADF, Hassan TM (2005) Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Constr Manag Econ 23(5):495–507CrossRef
Zurück zum Zitat Chan TK (2009) Measuring performance of Malaysian construction industry. Constr Manag Econ 27(12):1231–1244CrossRef Chan TK (2009) Measuring performance of Malaysian construction industry. Constr Manag Econ 27(12):1231–1244CrossRef
Zurück zum Zitat Chan IYS, Liu AMM, Richard Fellows R (2014) Role of leadership in fostering an innovation. Constr Manag Econ 30(6):1–7 Chan IYS, Liu AMM, Richard Fellows R (2014) Role of leadership in fostering an innovation. Constr Manag Econ 30(6):1–7
Zurück zum Zitat Cox RF, Issa RRA, Ahrens D (2003) Management’s perception of key performance indicators for construction. J Constr Eng Manag ASCE 129(2):142–151CrossRef Cox RF, Issa RRA, Ahrens D (2003) Management’s perception of key performance indicators for construction. J Constr Eng Manag ASCE 129(2):142–151CrossRef
Zurück zum Zitat Elyamany A, Basha I, Zayed T (2007) Performance evaluating model for construction companies: egyptian case study. J Constr Eng Manag ASCE 133(8):574–581CrossRef Elyamany A, Basha I, Zayed T (2007) Performance evaluating model for construction companies: egyptian case study. J Constr Eng Manag ASCE 133(8):574–581CrossRef
Zurück zum Zitat Hassaan HS, Fors MN, Shehata MS (2013) Fuzzy decision model for construction contractor’s selection in Egypt: tender Phase. In: Proceedings of the international conference on industrial engineering and engineering management, institute of electrical and electronics engineers (IEEE), Bangkok, Thailand Hassaan HS, Fors MN, Shehata MS (2013) Fuzzy decision model for construction contractor’s selection in Egypt: tender Phase. In: Proceedings of the international conference on industrial engineering and engineering management, institute of electrical and electronics engineers (IEEE), Bangkok, Thailand
Zurück zum Zitat Horta IM, Camanho AS, Da Costa JM (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. J Constr Eng Manag ASCE 136(5):581–594CrossRef Horta IM, Camanho AS, Da Costa JM (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. J Constr Eng Manag ASCE 136(5):581–594CrossRef
Zurück zum Zitat Isik Z (2009) A conceptual performance measurement framework for construction industry. Ph.D. thesis, The Graduate School of Natural and Applied Science of Middle East Technical University Isik Z (2009) A conceptual performance measurement framework for construction industry. Ph.D. thesis, The Graduate School of Natural and Applied Science of Middle East Technical University
Zurück zum Zitat Kagioglou M, Cooper R, Aouad G (2001) Performance management in construction: a conceptual framework. Constr Manag Econ 19(1):85–95CrossRef Kagioglou M, Cooper R, Aouad G (2001) Performance management in construction: a conceptual framework. Constr Manag Econ 19(1):85–95CrossRef
Zurück zum Zitat Kaplan RS, Norton DP (1996) The balanced scorecard. Harvard Business School Press, Boston Kaplan RS, Norton DP (1996) The balanced scorecard. Harvard Business School Press, Boston
Zurück zum Zitat Lin G, Shen GQ, Sun M, Kelly J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. J Constr Eng Manag ASCE 137(9):698–706CrossRef Lin G, Shen GQ, Sun M, Kelly J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. J Constr Eng Manag ASCE 137(9):698–706CrossRef
Zurück zum Zitat Love PED, Holt GD (2000) Construction business performance measurement: the stakeholder perspective measurement alternative. Bus Process Manag J 6(5):408–416CrossRef Love PED, Holt GD (2000) Construction business performance measurement: the stakeholder perspective measurement alternative. Bus Process Manag J 6(5):408–416CrossRef
Zurück zum Zitat Luu T-V, Kim S-Y, Cao H-L, Park Y-M (2008) Performance measurement of construction firms in developing countries. Constr Manag Econ 26(4):373–386CrossRef Luu T-V, Kim S-Y, Cao H-L, Park Y-M (2008) Performance measurement of construction firms in developing countries. Constr Manag Econ 26(4):373–386CrossRef
Zurück zum Zitat Mbugua LM, Harris P, Holt GD, Olomolaiye PO (1999) Framework for determining critical success factors influencing construction business performance. In: Hughes W (ed) 15th Annual ARCOM conference of association for research in construction management held in Liverpool, John Moores University, 15–17 September 1999, vol 1, pp 255–264 Mbugua LM, Harris P, Holt GD, Olomolaiye PO (1999) Framework for determining critical success factors influencing construction business performance. In: Hughes W (ed) 15th Annual ARCOM conference of association for research in construction management held in Liverpool, John Moores University, 15–17 September 1999, vol 1, pp 255–264
Zurück zum Zitat Menches CL, Hanna AS (2006) Quantitative measurement of successful performance from the project manager’s perspective. J Constr Eng Manag ASCE 132(12):1284–1293CrossRef Menches CL, Hanna AS (2006) Quantitative measurement of successful performance from the project manager’s perspective. J Constr Eng Manag ASCE 132(12):1284–1293CrossRef
Zurück zum Zitat Nemcova-Zuzana (2009) Application of key performance indicators in the construction industry: a comparison of the United Kingdom with the Czech Republic. The European Council of Construction Economists, 6 p Nemcova-Zuzana (2009) Application of key performance indicators in the construction industry: a comparison of the United Kingdom with the Czech Republic. The European Council of Construction Economists, 6 p
Zurück zum Zitat Rimbalova J, Vilcekova S (2013) The proposal of key performance indicators in facility management and determination the Weights of Significance. J Civil Eng 8(2):73–84 Rimbalova J, Vilcekova S (2013) The proposal of key performance indicators in facility management and determination the Weights of Significance. J Civil Eng 8(2):73–84
Zurück zum Zitat Skibniewski MJ, Ghosh S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. J Constr Eng Manag ASCE 135(10):965–978CrossRef Skibniewski MJ, Ghosh S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. J Constr Eng Manag ASCE 135(10):965–978CrossRef
Zurück zum Zitat Tripathi KK, Jha KN (2018a) An empirical study on performance measurement factors for construction organizations. KSCE J Civil Eng 22(4):1152–1166CrossRef Tripathi KK, Jha KN (2018a) An empirical study on performance measurement factors for construction organizations. KSCE J Civil Eng 22(4):1152–1166CrossRef
Zurück zum Zitat Tripathi KK, Jha KN (2018b) Determining success factors for a construction organization: a structural equation modeling approach. J Manag Eng 34(1):1–15CrossRef Tripathi KK, Jha KN (2018b) Determining success factors for a construction organization: a structural equation modeling approach. J Manag Eng 34(1):1–15CrossRef
Zurück zum Zitat Tsolas IE (2011) Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis. Constr Manag Econ 29(8):795–807CrossRef Tsolas IE (2011) Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis. Constr Manag Econ 29(8):795–807CrossRef
Zurück zum Zitat Yu I, Kim K, Jung Y, Chin S (2007) Comparable performance measurement system for construction companies. J Manag Eng ASCE 23(3):131–139CrossRef Yu I, Kim K, Jung Y, Chin S (2007) Comparable performance measurement system for construction companies. J Manag Eng ASCE 23(3):131–139CrossRef
Metadaten
Titel
Determining Criticality of Performance Indicators for a Construction Company
verfasst von
K. K. Tripathi
K. N. Jha
A. K. Jain
Copyright-Jahr
2020
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-13-9749-3_32