Skip to main content

2021 | OriginalPaper | Buchkapitel

Does the Time-Driven ABC Method Apply in a Construction Company

verfasst von : N. Kartalis, Ath Patsios, I. Velentzas, G. Broni, G. Charitoudi, G. Panoy, G. Kiriakoylis

Erschienen in: Advances in Longitudinal Data Methods in Applied Economic Research

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter explores the role of ABC’s business and service business activities, citing the basic principles and structure of their costing, based on TDABC’s time activity. The aim of the TDABC selection is to reduce the complexity of calculating and allocating costs, which characterizes ABC systems, which are used by large companies. The new version of ABC is presented in the service sector.
This chapter is based not only on theoretical and applying methods but also on new versions of ABC. The research that follows in the last part is the basis of the synthetic description of ABC and Time-Driven ABC methodologies, where an example is given, which shows the calculation of costs from service activities, using the TDABC method. The role of time equations in TDABC is explained as an illustrative example for those interested in accounting services to businesses, as exemplified by previous research, and also highlights the strengths and weaknesses of the new expenditure formula, based on the company’s activities.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Fußnoten
1
The total of 29,250 min results from the first determination of the number of weeks per quarter (52/4 = 13 weeks) and then by 13 weeks by 37.5 (number of working hours per employee per week, assuming two 15 min with pay breaks per day). This provides the total number of hours worked per quarter 487.5 op the U the proliferation of 487, 5 h with the 60 min to convert hours to minutes gives 29,250 min per quarter per full-time employee.
 
2
OMEGA management provides an overall estimate 9 min to be performed and the third in activities s with respect to a request or transaction. The estimate does not provide for any change in the ordering process. In addition, the number of orders per quarter.
 
Literatur
Zurück zum Zitat Adeniyi, A. (2012). An insight into management accounting (6th ed.). Mushin: Lagos El-Toda Ventures Limited. Adeniyi, A. (2012). An insight into management accounting (6th ed.). Mushin: Lagos El-Toda Ventures Limited.
Zurück zum Zitat Ahn, H. (2001). Applying the balanced scorecard concept: An experience report. Long Range Planning, 34(4), 441–461.CrossRef Ahn, H. (2001). Applying the balanced scorecard concept: An experience report. Long Range Planning, 34(4), 441–461.CrossRef
Zurück zum Zitat Akbar, J. K., Shahab, G. K., & Zahra, A. S. (2013). Just-in-time manufacturing system, revolution in management accounting from concept to implementation. International Review of Management and Business Research Journal, 2(1), 53–67. Akbar, J. K., Shahab, G. K., & Zahra, A. S. (2013). Just-in-time manufacturing system, revolution in management accounting from concept to implementation. International Review of Management and Business Research Journal, 2(1), 53–67.
Zurück zum Zitat Balla, A., Heva, L., & Vlisma, A. (2014). Cost accounting. Athens: Benou Publications. (In Greek). Balla, A., Heva, L., & Vlisma, A. (2014). Cost accounting. Athens: Benou Publications. (In Greek).
Zurück zum Zitat Banach, S. (1931). Über die Baire’sche Category gewisser Funktionenmengen. Math Studio, 3(1), 174–179.CrossRef Banach, S. (1931). Über die Baire’sche Category gewisser Funktionenmengen. Math Studio, 3(1), 174–179.CrossRef
Zurück zum Zitat Bettina, W. (2017). Problem with quality management process orientation, controllability and zero-defect processes as modern myths. Walsrode. Bettina, W. (2017). Problem with quality management process orientation, controllability and zero-defect processes as modern myths. Walsrode.
Zurück zum Zitat Blinder, A. S., Canetti, E. R. D., Lebow, D. E., & Rudd, J. B. (1998). Asking about prices: A new approach to understanding price stickiness. New York: Russell Sage Foundation. Blinder, A. S., Canetti, E. R. D., Lebow, D. E., & Rudd, J. B. (1998). Asking about prices: A new approach to understanding price stickiness. New York: Russell Sage Foundation.
Zurück zum Zitat Brignal, S. (2002). The Unbalanced scorecard: A social and environmental critique. In Proceedings, Third International Conference on Performance Measurement and Management (PMA2002). Brignal, S. (2002). The Unbalanced scorecard: A social and environmental critique. In Proceedings, Third International Conference on Performance Measurement and Management (PMA2002).
Zurück zum Zitat Bruggeman, W., & Everaert, P. (2007). Time-driven activity-based costing: Exploring the underlying model. Cost Management, 21(2), 16–19. Bruggeman, W., & Everaert, P. (2007). Time-driven activity-based costing: Exploring the underlying model. Cost Management, 21(2), 16–19.
Zurück zum Zitat Butler, A., Letza, S. R., & Neale, B. (1997). Linking the balanced scorecard to strategy. Long Range Planning, 30(2), 242–253.CrossRef Butler, A., Letza, S. R., & Neale, B. (1997). Linking the balanced scorecard to strategy. Long Range Planning, 30(2), 242–253.CrossRef
Zurück zum Zitat Cardinaels, E., & Labro, E. (2008). On the determinants of measurement error in time-driven costing. Accounting Review, 83(3), 735–756.CrossRef Cardinaels, E., & Labro, E. (2008). On the determinants of measurement error in time-driven costing. Accounting Review, 83(3), 735–756.CrossRef
Zurück zum Zitat Ciampa, D. (1992). Total quality: A user’s guide for implementation (p. xxii). Reading, MA: Addison-Wesley. Ciampa, D. (1992). Total quality: A user’s guide for implementation (p. xxii). Reading, MA: Addison-Wesley.
Zurück zum Zitat Colin, D. (2008). Management and cost accounting (6th ed.). Bed Ford Row, London Book Power Thompson Learning Publishers. Colin, D. (2008). Management and cost accounting (6th ed.). Bed Ford Row, London Book Power Thompson Learning Publishers.
Zurück zum Zitat Coners, A., & von der Hardt, G. (2004). Time-driven activity-based costing, motivation und Anwendungsperspektiviven. Controlling und Management, 48(2), 108–118.CrossRef Coners, A., & von der Hardt, G. (2004). Time-driven activity-based costing, motivation und Anwendungsperspektiviven. Controlling und Management, 48(2), 108–118.CrossRef
Zurück zum Zitat Cooper, R., & Kaplan, R. S. (1988, September–October). Measure cost right: Make the right decision. Harvard Business Review, 96–103. Cooper, R., & Kaplan, R. S. (1988, September–October). Measure cost right: Make the right decision. Harvard Business Review, 96–103.
Zurück zum Zitat Cooper, R., & Kaplan, R. S. (1991). The design of cost management system, text, cases and readings. Englewood Cliffs: Prentice-Hall International Editions. Cooper, R., & Kaplan, R. S. (1991). The design of cost management system, text, cases and readings. Englewood Cliffs: Prentice-Hall International Editions.
Zurück zum Zitat Cooper, R., & Kaplan, R. S. (1992, September). Activity-based systems: Measuring the cost of resource usage. Accounting Horizons, 1–13. Cooper, R., & Kaplan, R. S. (1992, September). Activity-based systems: Measuring the cost of resource usage. Accounting Horizons, 1–13.
Zurück zum Zitat Creech, B. (1994). The five pillars of TQM: How to make Total quality management work for you (p. 4). New York: Truman Talley Books/Dutton. Creech, B. (1994). The five pillars of TQM: How to make Total quality management work for you (p. 4). New York: Truman Talley Books/Dutton.
Zurück zum Zitat De La Villarmois, O., & Levant, Y. (2007, April). Time-driven ABC: Simplifying the assessment of costs through resorting to equivalents. Paper presented at the 30th Congress of the European Accounting Association, Lizbon. De La Villarmois, O., & Levant, Y. (2007, April). Time-driven ABC: Simplifying the assessment of costs through resorting to equivalents. Paper presented at the 30th Congress of the European Accounting Association, Lizbon.
Zurück zum Zitat Dlubak, M. (2005). Rachunek kosztów działań bazujący na czasie-(r) ewolucja. Controlling in Rachunkowość Zarządcza, 5, 22–26. Dlubak, M. (2005). Rachunek kosztów działań bazujący na czasie-(r) ewolucja. Controlling in Rachunkowość Zarządcza, 5, 22–26.
Zurück zum Zitat Drucker, P. F. (1999). Management challenges of the 21st century. New York: Harper Business. Drucker, P. F. (1999). Management challenges of the 21st century. New York: Harper Business.
Zurück zum Zitat Elefalke, K. (2001). The Balanced Scorecard of the Swedish Police Service: 7000 employees in total quality management project. Total Quality Management, 12(7), 958–966.CrossRef Elefalke, K. (2001). The Balanced Scorecard of the Swedish Police Service: 7000 employees in total quality management project. Total Quality Management, 12(7), 958–966.CrossRef
Zurück zum Zitat Ellingson, L. L. (2011). Analysis and representation across a continuum. In N. K. Denzin & Y. S. Lincoln (Eds.), The Sage handbook of qualitative research (4th ed., pp. 595–610). Thousand Oaks, CA: Sage. Ellingson, L. L. (2011). Analysis and representation across a continuum. In N. K. Denzin & Y. S. Lincoln (Eds.), The Sage handbook of qualitative research (4th ed., pp. 595–610). Thousand Oaks, CA: Sage.
Zurück zum Zitat Farris, P. W., Bendle, N. T., Pfeifer, P. E., & Reibstein, D. J. (2010). Marketing metrics: The definitive guide to measuring marketing performance. Upper Saddle River, NJ: Pearson Education, Inc. Farris, P. W., Bendle, N. T., Pfeifer, P. E., & Reibstein, D. J. (2010). Marketing metrics: The definitive guide to measuring marketing performance. Upper Saddle River, NJ: Pearson Education, Inc.
Zurück zum Zitat Gervais, M. (2009, May). Time-driven activity-based costing: New wine, or just new bottles? Presented at the Paper 32nd Annual EAA Congress, Tampere. Gervais, M. (2009, May). Time-driven activity-based costing: New wine, or just new bottles? Presented at the Paper 32nd Annual EAA Congress, Tampere.
Zurück zum Zitat Harrison, H., Birks, M., Franklin, R., & Mills, J. (2017). Case study research: Foundations and methodological orientations. Journal Content, 18(1). Harrison, H., Birks, M., Franklin, R., & Mills, J. (2017). Case study research: Foundations and methodological orientations. Journal Content, 18(1).
Zurück zum Zitat Holmes, K. (1992). Total quality management (p. 10). Leatherhead: Pira International, Ltd. Holmes, K. (1992). Total quality management (p. 10). Leatherhead: Pira International, Ltd.
Zurück zum Zitat Houston, A. (1988, December). A total quality management process improvement model (pp. vii–viii). San Diego, CA: Navy Personnel Research and Development Center.CrossRef Houston, A. (1988, December). A total quality management process improvement model (pp. vii–viii). San Diego, CA: Navy Personnel Research and Development Center.CrossRef
Zurück zum Zitat ICAN. (2012). Management accounting professional examination study pack. Lagos Nigeria: Value Analysis Publisher. ICAN. (2012). Management accounting professional examination study pack. Lagos Nigeria: Value Analysis Publisher.
Zurück zum Zitat Irwin, D. (2002). Strategy mapping in the public sector. International Journal of Strategic Management, 35(6), 563–672. Irwin, D. (2002). Strategy mapping in the public sector. International Journal of Strategic Management, 35(6), 563–672.
Zurück zum Zitat Juran, J. M. (1995). A history of managing for quality: The evolution, trends, and future directions of managing for quality (p. 596). Milwaukee, WI: ASQC Quality Press. Juran, J. M. (1995). A history of managing for quality: The evolution, trends, and future directions of managing for quality (p. 596). Milwaukee, WI: ASQC Quality Press.
Zurück zum Zitat Kaplan, R. S., & Anderson, S. R. (2004, November). Time-driven activity-based costing. Harvard Business Review, 131–138. Kaplan, R. S., & Anderson, S. R. (2004, November). Time-driven activity-based costing. Harvard Business Review, 131–138.
Zurück zum Zitat Kaplan, R. S., & Anderson, S. R. (2005). Schneller und besser kalkulieren. Harvard Business Manager, 27(5), 86–98. Kaplan, R. S., & Anderson, S. R. (2005). Schneller und besser kalkulieren. Harvard Business Manager, 27(5), 86–98.
Zurück zum Zitat Kaplan, R. S., & Anderson, S. R. (2007). Time-driven activity-based costing: a simpler and more powerful path to higher profits (p. 3, 7, 8). Boston, MA: Harvard Business Publishing. Kaplan, R. S., & Anderson, S. R. (2007). Time-driven activity-based costing: a simpler and more powerful path to higher profits (p. 3, 7, 8). Boston, MA: Harvard Business Publishing.
Zurück zum Zitat Kaplan, R. S., & Bruns, W. (1987). Accounting and management: A field study perspective. Boston: Harvard Business School Press. Kaplan, R. S., & Bruns, W. (1987). Accounting and management: A field study perspective. Boston: Harvard Business School Press.
Zurück zum Zitat Kaplan, R. S., & Cooper, R. (1998). Cost & effect—Using integrated cost systems to drive profitability and performance. Boston. Kaplan, R. S., & Cooper, R. (1998). Cost & effect—Using integrated cost systems to drive profitability and performance. Boston.
Zurück zum Zitat Kartalis, D. N. (2017). Management accounting-budgets. Agia Sofia, Serres (In Greek). Kartalis, D. N. (2017). Management accounting-budgets. Agia Sofia, Serres (In Greek).
Zurück zum Zitat Kartalis, N., & Matis, K. (2015). Time Driven Activity Based Costing applied in Hellenic Post Office. International Conference on Innovation, Entrepreneurship and Competitiveness in the Balkan and Black Sea countries, Co-organization of the University of Macedonia and ATEI of Eastern Macedonia, Kavala, May 2015. Kartalis, N., & Matis, K. (2015). Time Driven Activity Based Costing applied in Hellenic Post Office. International Conference on Innovation, Entrepreneurship and Competitiveness in the Balkan and Black Sea countries, Co-organization of the University of Macedonia and ATEI of Eastern Macedonia, Kavala, May 2015.
Zurück zum Zitat Killam, L. (2013). Research simplified terminology: Paradigms, ontology, epistemology and methodology. Sudbury, ON: Author. [Kindle DX version]. Killam, L. (2013). Research simplified terminology: Paradigms, ontology, epistemology and methodology. Sudbury, ON: Author. [Kindle DX version].
Zurück zum Zitat Kissell, R., & Glantz, M. (2003). Optimal trading strategies (pp. 1–23). AMACOM. Kissell, R., & Glantz, M. (2003). Optimal trading strategies (pp. 1–23). AMACOM.
Zurück zum Zitat Lavoie, M. (2014). Post-Keynesian economics: New foundations (p. 151). Northampton, MA: Edward Elgar Publishing.CrossRef Lavoie, M. (2014). Post-Keynesian economics: New foundations (p. 151). Northampton, MA: Edward Elgar Publishing.CrossRef
Zurück zum Zitat Lincoln, Y. S., Lynham, S. A., & Guba, E. G. (2011). Paradigmatic controversies, contradictions, and emerging confluences, revisited in qualitative research. In N. K. Denzin & Y. S. Lincoln (Eds.), The Sage handbook of qualitative research (4th ed., pp. 97–128). Thousand Oaks, CA: Sage. Lincoln, Y. S., Lynham, S. A., & Guba, E. G. (2011). Paradigmatic controversies, contradictions, and emerging confluences, revisited in qualitative research. In N. K. Denzin & Y. S. Lincoln (Eds.), The Sage handbook of qualitative research (4th ed., pp. 97–128). Thousand Oaks, CA: Sage.
Zurück zum Zitat Malina, M. A., & Selto, F. H. (2001). Communicating and controlling strategy: An empirical study of the effectiveness of the balanced scorecard. Journal of Management Accounting Research, 13, 47–90.CrossRef Malina, M. A., & Selto, F. H. (2001). Communicating and controlling strategy: An empirical study of the effectiveness of the balanced scorecard. Journal of Management Accounting Research, 13, 47–90.CrossRef
Zurück zum Zitat McDonach, C., & Mattimore, R. (2008, April). Strategic applications of time-driven ABC in the service sector: Lessons from Irish SME. In Communication at the 31st Annual Congress of the EAA. Rotterdam. McDonach, C., & Mattimore, R. (2008, April). Strategic applications of time-driven ABC in the service sector: Lessons from Irish SME. In Communication at the 31st Annual Congress of the EAA. Rotterdam.
Zurück zum Zitat Merriam, S. B. (2009). Qualitative research: A guide to design and implementation (2nd ed.). San Francisco, CA: Jossey-Bass. Merriam, S. B. (2009). Qualitative research: A guide to design and implementation (2nd ed.). San Francisco, CA: Jossey-Bass.
Zurück zum Zitat Mocciaro Li Destri, A., Picone, P. M., & Minà, A. (2012). Bringing strategy back into financial systems of performance measurement: Integrating EVA and PBC. Business System Review, 1(1), 85–102. Mocciaro Li Destri, A., Picone, P. M., & Minà, A. (2012). Bringing strategy back into financial systems of performance measurement: Integrating EVA and PBC. Business System Review, 1(1), 85–102.
Zurück zum Zitat Moulin, M. (2017). Improving and evaluating performance with the Public Sector Scorecard. International Journal of Productivity and Performance Management, 66(4), 442–458.CrossRef Moulin, M. (2017). Improving and evaluating performance with the Public Sector Scorecard. International Journal of Productivity and Performance Management, 66(4), 442–458.CrossRef
Zurück zum Zitat North, D. C. (1992). Transaction costs, institutions, and economic performance. San Francisco, CA: ICS Press. North, D. C. (1992). Transaction costs, institutions, and economic performance. San Francisco, CA: ICS Press.
Zurück zum Zitat O’Sullivan, A., & Sheffrin, S. M. (2003). Economics: Principles in action (p. 111). Upper Saddle River, NJ: Pearson Prentice Hall. O’Sullivan, A., & Sheffrin, S. M. (2003). Economics: Principles in action (p. 111). Upper Saddle River, NJ: Pearson Prentice Hall.
Zurück zum Zitat Ohno, T. (1997, February 8). Toyota to Recalibrate just-in-time (p. 9). International Herald Tribune. Ohno, T. (1997, February 8). Toyota to Recalibrate just-in-time (p. 9). International Herald Tribune.
Zurück zum Zitat Omoregie, N. V. (2002). Effective cost management: An introductory text. Lagos: Novgie Press Publication. Omoregie, N. V. (2002). Effective cost management: An introductory text. Lagos: Novgie Press Publication.
Zurück zum Zitat Pessali, H. F. (2006). The rhetoric of Oliver Williamson’s transaction cost economics. Journal of Institutional Economics, 2(1), 45–65.CrossRef Pessali, H. F. (2006). The rhetoric of Oliver Williamson’s transaction cost economics. Journal of Institutional Economics, 2(1), 45–65.CrossRef
Zurück zum Zitat Przytula, M. (2005). Jakie są zalety i wady nowego podejścia do rachunku kosztów działań Time-Driven Activity Based Costing. Controlling in Rachunkowość Zarządcza, 8, 28–32. Przytula, M. (2005). Jakie są zalety i wady nowego podejścia do rachunku kosztów działań Time-Driven Activity Based Costing. Controlling in Rachunkowość Zarządcza, 8, 28–32.
Zurück zum Zitat Radnor, Z., & Lovell, W. (2003). Defining, justifying and implementing the Balanced Scorecard in the National Health Service. International Journal of Medical Marketing, 3(3), 174–188.CrossRef Radnor, Z., & Lovell, W. (2003). Defining, justifying and implementing the Balanced Scorecard in the National Health Service. International Journal of Medical Marketing, 3(3), 174–188.CrossRef
Zurück zum Zitat Roger, H., & Hermansion, N. (1998). Accounting for business perspective (7th ed.). New York: McGraw-Hilirwin Companies Inc. Roger, H., & Hermansion, N. (1998). Accounting for business perspective (7th ed.). New York: McGraw-Hilirwin Companies Inc.
Zurück zum Zitat Sapp, R., Crawford, D. and Rebishcke, S. (1990). Activity Based Information for Financial Institutions. The Journal of Bank Cost and Management Accounting, Vol.3(2), pp.221–237. Sapp, R., Crawford, D. and Rebishcke, S. (1990). Activity Based Information for Financial Institutions. The Journal of Bank Cost and Management Accounting, Vol.3(2), pp.221–237.
Zurück zum Zitat Shulver, M. J., & Antarkar, N. (2001). The balanced scorecard as a communication protocol for managing across intra-organizational borders. In Proceedings from the 12th Annual Conference of the Production and Operations Management Society. Orlando, Florida, USA. Shulver, M. J., & Antarkar, N. (2001). The balanced scorecard as a communication protocol for managing across intra-organizational borders. In Proceedings from the 12th Annual Conference of the Production and Operations Management Society. Orlando, Florida, USA.
Zurück zum Zitat Simon, C., & Blume, L. (1994). Mathematics for economists. London: WW Norton & Company. Simon, C., & Blume, L. (1994). Mathematics for economists. London: WW Norton & Company.
Zurück zum Zitat Stake, R. E. (1995). The art of case study research. Thousand Oaks, CA: Sage. Stake, R. E. (1995). The art of case study research. Thousand Oaks, CA: Sage.
Zurück zum Zitat Staubus, G. J. (1971). Activity costing and input-output accounting. Homewood: Richard D. Irwin, Inc. Staubus, G. J. (1971). Activity costing and input-output accounting. Homewood: Richard D. Irwin, Inc.
Zurück zum Zitat Stout, D., & Joseph M. Propri. (2011). Implementing Time-Driven Activity-Based Costing at a Medium-Sized Electronics Company. Management Accounting Quarterly 12(1). Stout, D., & Joseph M. Propri. (2011). Implementing Time-Driven Activity-Based Costing at a Medium-Sized Electronics Company. Management Accounting Quarterly 12(1).
Zurück zum Zitat Szychta, A. (2008). Rachunek kosztów działań: podejście klasyczne a Time-Driven. Zeszyty Teoretyczne Rachunkowości, 42(98), 285–306. Szychta, A. (2008). Rachunek kosztów działań: podejście klasyczne a Time-Driven. Zeszyty Teoretyczne Rachunkowości, 42(98), 285–306.
Zurück zum Zitat Szychta, A. (2010, Spring). Time-driven activity-based costing in service industries. Management Accounting Quarterly, 1–11. Szychta, A. (2010, Spring). Time-driven activity-based costing in service industries. Management Accounting Quarterly, 1–11.
Zurück zum Zitat Tsaklaganos, A. (2000). Cost theory and accounting. Athens: Kyriakidis Publications. (In Greek). Tsaklaganos, A. (2000). Cost theory and accounting. Athens: Kyriakidis Publications. (In Greek).
Zurück zum Zitat Tsimaras, M. (1995). Cost, costing, industrial accounting. Athens: Publications Papazisis. (In Greek). Tsimaras, M. (1995). Cost, costing, industrial accounting. Athens: Publications Papazisis. (In Greek).
Zurück zum Zitat Vickrey, W. (2008). Marginal and average cost pricing. In F. Macmillan (Ed.), The new Palgrave dictionary of economics. London: Palgrave Macmillan. Vickrey, W. (2008). Marginal and average cost pricing. In F. Macmillan (Ed.), The new Palgrave dictionary of economics. London: Palgrave Macmillan.
Zurück zum Zitat Yin, R. K. (2014). Case study research: Design and methods. Los Angeles, CA: Sage. Yin, R. K. (2014). Case study research: Design and methods. Los Angeles, CA: Sage.
Zurück zum Zitat Κartalis, N., & Matis, K. (2015). Time driven activity based costing applied in Hellenic post office. In International Conference on Innovation, Entrepreneurship and Competitiveness in the Balkans and Black Sea Countries, Co-organized by University of Macedonia and ATEI Eastern Macedonia, Kavala, May 2015. Κartalis, N., & Matis, K. (2015). Time driven activity based costing applied in Hellenic post office. In International Conference on Innovation, Entrepreneurship and Competitiveness in the Balkans and Black Sea Countries, Co-organized by University of Macedonia and ATEI Eastern Macedonia, Kavala, May 2015.
Metadaten
Titel
Does the Time-Driven ABC Method Apply in a Construction Company
verfasst von
N. Kartalis
Ath Patsios
I. Velentzas
G. Broni
G. Charitoudi
G. Panoy
G. Kiriakoylis
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-63970-9_27