Dynamic job shop scheduling with fixed interval deliveries

verfasst von: Cheng-Hsiang Liu, Cheng-I Hsu

Erschienen in: Production Engineering | Ausgabe 3/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Most classical scheduling models assume a job is delivered to a customer immediately after job processing is complete. In numerous practical situations, however, multiple delivery dates exist, and the time interval between any two consecutive delivery dates is constant. A finished job is supplied to a customer by truck on the earliest date in a series of fixed delivery dates, typically at or after processing is complete. This fixed delivery strategy results in substantial cost savings when delivery is expensive or complex. The goal of this study is to minimize the sum of due-date cost and earliness penalty associated with jobs scheduling in a dynamic job shop environment. The due date cost for a job is incurred for time spent delivering a job to a customer. Earliness penalty is incurred if a job is completed before the delivery date. This study identifies three dispatching rules, and proposes nine new rules by explicitly considering different due date costs per time unit and the earliness penalty per time unit of a job. The proposed rules are simple and easily implemented without preliminary runs for parameter estimation. Simulation results show that the proposed dispatching rules are significantly superior to their counterparts.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Chand S, Chhajed D, Traub R (1994) A single-machine scheduling model with fixed-interval deliveries. Prod Oper Manag 3(4):296–307CrossRef Chand S, Chhajed D, Traub R (1994) A single-machine scheduling model with fixed-interval deliveries. Prod Oper Manag 3(4):296–307CrossRef
2.
Zurück zum Zitat Chhajed D (1995) A fixed interval due-date scheduling problem with earliness and due-date costs. Eur J Oper Res 84(2):385–401MathSciNetCrossRef Chhajed D (1995) A fixed interval due-date scheduling problem with earliness and due-date costs. Eur J Oper Res 84(2):385–401MathSciNetCrossRef
3.
Zurück zum Zitat Fu B, Huo Y, Zhao H (2012) Coordinated scheduling of production and delivery with production window and delivery capacity constraints. Theoret Comput Sci 422:39–51MathSciNetCrossRef Fu B, Huo Y, Zhao H (2012) Coordinated scheduling of production and delivery with production window and delivery capacity constraints. Theoret Comput Sci 422:39–51MathSciNetCrossRef
5.
Zurück zum Zitat Lee C-Y, Li C-L (1996) On the fixed interval due-date scheduling problem. Discrete Appl Math 68(1–2):101–117MathSciNetCrossRef Lee C-Y, Li C-L (1996) On the fixed interval due-date scheduling problem. Discrete Appl Math 68(1–2):101–117MathSciNetCrossRef
6.
Zurück zum Zitat Lesaoana M (1991) Scheduling with fixed delivery dates. Ph.D. Thesis, University of Southampton Lesaoana M (1991) Scheduling with fixed delivery dates. Ph.D. Thesis, University of Southampton
7.
Zurück zum Zitat Matsuo H (1988) The weighted total tardiness problem with fixed shipping times and overtime utilization. Oper Res 36(2):293–307MathSciNetCrossRef Matsuo H (1988) The weighted total tardiness problem with fixed shipping times and overtime utilization. Oper Res 36(2):293–307MathSciNetCrossRef
8.
Zurück zum Zitat Wang X, Cheng TCE (2012) Performance bound analysis of a heuristic for the total weighted flowtime problem with fixed delivery dates. Comput Ind Eng 62(2):451–456CrossRef Wang X, Cheng TCE (2012) Performance bound analysis of a heuristic for the total weighted flowtime problem with fixed delivery dates. Comput Ind Eng 62(2):451–456CrossRef
Metadaten
Titel
Dynamic job shop scheduling with fixed interval deliveries
verfasst von
Cheng-Hsiang Liu
Cheng-I Hsu
Publikationsdatum
01.08.2015
Verlag
Springer Berlin Heidelberg
Erschienen in
Production Engineering / Ausgabe 3/2015
Print ISSN: 0944-6524
Elektronische ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-015-0605-z

Weitere Artikel der Ausgabe 3/2015

Production Engineering 3/2015 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.