Skip to main content
Top

2019 | OriginalPaper | Chapter

A New Framework for Modelling Schedules in Complex and Uncertain NPD Projects

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Producing reliable schedules for new product development (NPD) projects can be difficult. The uncertainty involved in NPD and the complex relationships between project tasks often leads to task repetition. This results in project schedules that are not linear and cannot be predicted using traditional methods. This case introduces a new modelling approach that aims to provide a more accurate and process specific representation of NPD project schedules. It was developed in a large multi-national component company and addresses the challenges they face producing accurate schedules for their NPD projects. The new approach uses a set of process specific variables rather than the subjective iteration probabilities used by earlier approaches. This results in more reliable project schedules accounting for specific project variations.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
2.
go back to reference Browning TR (2001) Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans Eng Manag 48:292–306CrossRef Browning TR (2001) Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans Eng Manag 48:292–306CrossRef
3.
go back to reference Browning TR, Eppinger SD (2002) Modelling impacts of process architecture on cost and schedule risk in product development. IEEE Trans Eng Manag 49(4):428–442CrossRef Browning TR, Eppinger SD (2002) Modelling impacts of process architecture on cost and schedule risk in product development. IEEE Trans Eng Manag 49(4):428–442CrossRef
4.
go back to reference Browning TR, Deyst JJ, Eppinger SD, Whitney DE (2002) Adding value in product development by creating information and reducing risk. IEEE Trans Eng Manag 49(4):443–458 Browning TR, Deyst JJ, Eppinger SD, Whitney DE (2002) Adding value in product development by creating information and reducing risk. IEEE Trans Eng Manag 49(4):443–458
5.
go back to reference Chen C-H, Ling SF, Chen W (2003) Project scheduling for collaborative product development using DSM. Int J Project Manag 21:291–299CrossRef Chen C-H, Ling SF, Chen W (2003) Project scheduling for collaborative product development using DSM. Int J Project Manag 21:291–299CrossRef
6.
go back to reference Cho S-H, Eppinger SD (2005) A simulation based process model for managing complex design projects. IEEE Trans Eng Manag 52(3):316–328CrossRef Cho S-H, Eppinger SD (2005) A simulation based process model for managing complex design projects. IEEE Trans Eng Manag 52(3):316–328CrossRef
7.
go back to reference Cooper KG (1993) The rework cycle: benchmarks for the project manager. Project Manag J 24:17–22 Cooper KG (1993) The rework cycle: benchmarks for the project manager. Project Manag J 24:17–22
8.
go back to reference Cooper KG (1993) The rework cycle: why projects are mismanaged. PM network magazine, Feb 1993, pp 5–7 Cooper KG (1993) The rework cycle: why projects are mismanaged. PM network magazine, Feb 1993, pp 5–7
9.
go back to reference Flanagan TL, Eckert CM, Keller R, Clarkson PJ (2005) Robust planning of design tasks using simulation. In: International conference on engineering design ICED 05, Melbourne Flanagan TL, Eckert CM, Keller R, Clarkson PJ (2005) Robust planning of design tasks using simulation. In: International conference on engineering design ICED 05, Melbourne
10.
go back to reference Ford D, Sterman JD (2003) Overcoming the 90% syndrome: iteration management in concurrent development projects. Concurr Eng Res Appl 11:177–186 Ford D, Sterman JD (2003) Overcoming the 90% syndrome: iteration management in concurrent development projects. Concurr Eng Res Appl 11:177–186
11.
go back to reference Griffin A (1993) Metrics for measuring product development cycle time. J Prod Innov manag 10(2):112–125 Griffin A (1993) Metrics for measuring product development cycle time. J Prod Innov manag 10(2):112–125
12.
go back to reference Hardie N (2001) The prediction and control of project duration: a recursive model. Int J Project Manag 19(7):401–409CrossRef Hardie N (2001) The prediction and control of project duration: a recursive model. Int J Project Manag 19(7):401–409CrossRef
13.
go back to reference Herroelen W, Leus R (2005) Project scheduling under uncertainty: survey and research potentials. Eur J Oper Res 165(2):289–306CrossRef Herroelen W, Leus R (2005) Project scheduling under uncertainty: survey and research potentials. Eur J Oper Res 165(2):289–306CrossRef
14.
go back to reference Kawakita J (1967) Hassohou. Chuokoron-shinsya, Tokyo Kawakita J (1967) Hassohou. Chuokoron-shinsya, Tokyo
15.
go back to reference Lin J, Chai KH, Wong YS, Brombacher AC (2008) A dynamic model for managing overlapped iterative product development. Eur J Oper Res 185:378–392CrossRef Lin J, Chai KH, Wong YS, Brombacher AC (2008) A dynamic model for managing overlapped iterative product development. Eur J Oper Res 185:378–392CrossRef
16.
go back to reference Luh PB, Liu F, Moser B (1999) Scheduling of design projects with uncertain number of iterations. Eur J Oper Res 113(3):575–592CrossRef Luh PB, Liu F, Moser B (1999) Scheduling of design projects with uncertain number of iterations. Eur J Oper Res 113(3):575–592CrossRef
17.
go back to reference Maheswari JU, Varghese K (2005) A structured approach to form dependency structure matrix for construction projects. In: 22nd international symposium on automation and robotics in construction, 2005 Maheswari JU, Varghese K (2005) A structured approach to form dependency structure matrix for construction projects. In: 22nd international symposium on automation and robotics in construction, 2005
18.
go back to reference Repenning NP (2001) Understanding fire fighting in new product development. J Prod Innov Manag 18(5):285–300CrossRef Repenning NP (2001) Understanding fire fighting in new product development. J Prod Innov Manag 18(5):285–300CrossRef
19.
go back to reference Smith RP, Eppinger SD (1993) Characteristics and models of iteration in engineering design. M.I.T. Sloan School of management paper Smith RP, Eppinger SD (1993) Characteristics and models of iteration in engineering design. M.I.T. Sloan School of management paper
20.
go back to reference Smith RP, Eppinger SD (1997) A predictive model of sequential iteration in engineering design. Manag Sci 43(8):1104–1120CrossRef Smith RP, Eppinger SD (1997) A predictive model of sequential iteration in engineering design. Manag Sci 43(8):1104–1120CrossRef
21.
go back to reference Steward DV (1981) The design structure system: a method for managing the design of complex systems. IEEE Trans Eng Manag 28:71–74CrossRef Steward DV (1981) The design structure system: a method for managing the design of complex systems. IEEE Trans Eng Manag 28:71–74CrossRef
22.
go back to reference Wang J, Lin YI (2009) An overlapping process model to assess schedule risk for new product development. Comput Ind Eng 57(2):460–474MathSciNetCrossRef Wang J, Lin YI (2009) An overlapping process model to assess schedule risk for new product development. Comput Ind Eng 57(2):460–474MathSciNetCrossRef
23.
go back to reference Williams T (2003) The contribution of mathematical modelling to the practice of project management. IMA J Manag Math 14:3–30CrossRef Williams T (2003) The contribution of mathematical modelling to the practice of project management. IMA J Manag Math 14:3–30CrossRef
24.
go back to reference Yassine AA (2004) An introduction to modelling and analysing complex product development processes using the design structure matrix (DSM) method. Ital Manag Rev 9:71–88 Yassine AA (2004) An introduction to modelling and analysing complex product development processes using the design structure matrix (DSM) method. Ital Manag Rev 9:71–88
Metadata
Title
A New Framework for Modelling Schedules in Complex and Uncertain NPD Projects
Authors
Ann Ledwith
Evan Murphy
Copyright Year
2019
DOI
https://doi.org/10.1007/978-3-030-16134-7_8