Skip to main content
Top
Published in: Journal of Intelligent Manufacturing 6/2015

19-12-2013

A reinforcement learning based approach for a multiple-load carrier scheduling problem

Authors: Ci Chen, Beixin Xia, Bing-hai Zhou, Lifeng Xi

Published in: Journal of Intelligent Manufacturing | Issue 6/2015

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper studies the problem of scheduling a multiple-load carrier which is used to deliver parts to line-side buffers of a general assembly (GA) line. In order to maximize the reward of the GA line, both the throughput of the GA line and the material handling distance are considered as scheduling criteria. After formulating the scheduling problem as a reinforcement learning (RL) problem by defining state features, actions and the reward function, we develop a Q(\(\lambda \)) RL algorithm based scheduling approach. To improve performance, forecasted information such as quantities of parts required in a look-ahead horizon is used when we define state features and actions in formulation. Other than applying traditional material handling request generating policy, we use a look-ahead based request generating policy with which material handling requests are generated based not only on current buffer information but also on future part requirement information. Moreover, by utilizing a heuristic dispatching algorithm, the approach is able to handle future requests as well as existing ones. To evaluate the performance of the approach, we conduct simulation experiments to compare the proposed approach with other approaches. Numerical results demonstrate that the policies obtained by the RL approach outperform other approaches.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775–789. doi:10.1007/s10845-012-0627-8.CrossRef Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775–789. doi:10.​1007/​s10845-012-0627-8.CrossRef
go back to reference Chen, C., Xi, L., Zhou, B., & Zhou, S. (2011). A multiple-criteria real-time scheduling approach for multiple-load carriers subject to LIFO-loading constraints. International Journal of Production Research, 49(16), 4787–4806. doi:10.1080/00207543.2010.510486.CrossRef Chen, C., Xi, L., Zhou, B., & Zhou, S. (2011). A multiple-criteria real-time scheduling approach for multiple-load carriers subject to LIFO-loading constraints. International Journal of Production Research, 49(16), 4787–4806. doi:10.​1080/​00207543.​2010.​510486.CrossRef
go back to reference Chen, C., Zhou, B., & Xi, L.. (2010). A support vector machine based scheduling approach for a material handling system. In: Presented at the natural computation (ICNC), 2010 sixth international conference on (Vol. 7, pp. 3768–3772). Chen, C., Zhou, B., & Xi, L.. (2010). A support vector machine based scheduling approach for a material handling system. In: Presented at the natural computation (ICNC), 2010 sixth international conference on (Vol. 7, pp. 3768–3772).
go back to reference Dang, Q.-V., Nielsen, I., Steger-Jensen, K., & Madsen, O. (2013). Scheduling a single mobile robot for part-feeding tasks of production lines. Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0729-y. Dang, Q.-V., Nielsen, I., Steger-Jensen, K., & Madsen, O. (2013). Scheduling a single mobile robot for part-feeding tasks of production lines. Journal of Intelligent Manufacturing. doi:10.​1007/​s10845-013-0729-y.
go back to reference de Koster, R.(M.) B. M., Le-Anh, T., & van der Meer, J. R. (2004). Testing and classifying vehicle dispatching rules in three real-world settings. Journal of Operations Management, 22(4), 369–386. doi:10.1016/j.jom.2004.05.006. de Koster, R.(M.) B. M., Le-Anh, T., & van der Meer, J. R. (2004). Testing and classifying vehicle dispatching rules in three real-world settings. Journal of Operations Management, 22(4), 369–386. doi:10.​1016/​j.​jom.​2004.​05.​006.
go back to reference Duda, R. O., & Hart, P. E. (1973). Pattern classification and scene analysis. New York: Wiley.MATH Duda, R. O., & Hart, P. E. (1973). Pattern classification and scene analysis. New York: Wiley.MATH
go back to reference Ho, Y.-C., Liu, H.-C., & Yih, Y. (2012). A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs. Journal of Manufacturing Systems, 31(3), 288–300. doi:10.1016/j.jmsy.2012.03.002.CrossRef Ho, Y.-C., Liu, H.-C., & Yih, Y. (2012). A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs. Journal of Manufacturing Systems, 31(3), 288–300. doi:10.​1016/​j.​jmsy.​2012.​03.​002.CrossRef
go back to reference Joe, Y. Y., Gan, O. P., & Lewis, F. L. (2012). Multi-commodity flow dynamic resource assignment and matrix-based job dispatching for multi-relay transfer in complex material handling systems (MHS). Journal of Intelligent Manufacturing, 1–17. doi:10.1007/s10845-012-0713-y. Joe, Y. Y., Gan, O. P., & Lewis, F. L. (2012). Multi-commodity flow dynamic resource assignment and matrix-based job dispatching for multi-relay transfer in complex material handling systems (MHS). Journal of Intelligent Manufacturing, 1–17. doi:10.​1007/​s10845-012-0713-y.
go back to reference Le-Anh, T., de Koster, R. B. M., & Yu, Y. (2010). Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems. International Journal of Production Research, 48(24), 7219–7242. doi:10.1080/00207540903443279.CrossRefMATH Le-Anh, T., de Koster, R. B. M., & Yu, Y. (2010). Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems. International Journal of Production Research, 48(24), 7219–7242. doi:10.​1080/​0020754090344327​9.CrossRefMATH
go back to reference Li, X., Tao Geng, YuPu Yang, & Xiaoming Xu. (2002). Multiagent AGVs dispatching system using multilevel decisions method. In Presented at the American control conference, 2002. Proceedings of the 2002, IEEE (Vol. 2, pp. 1135–1136 vol. 2). doi:10.1109/ACC.2002.1023172. Li, X., Tao Geng, YuPu Yang, & Xiaoming Xu. (2002). Multiagent AGVs dispatching system using multilevel decisions method. In Presented at the American control conference, 2002. Proceedings of the 2002, IEEE (Vol. 2, pp. 1135–1136 vol. 2). doi:10.​1109/​ACC.​2002.​1023172.
go back to reference Min, H.-S., & Yih, Y. (2003). Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system. International Journal of Production Research, 41(16), 3921–3941.CrossRefMATH Min, H.-S., & Yih, Y. (2003). Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system. International Journal of Production Research, 41(16), 3921–3941.CrossRefMATH
go back to reference Montazeri, M., & Van Wassenhove, L. N. (1990). Analysis of scheduling rules for an FMS. International journal of production research, 28(4), 785.CrossRef Montazeri, M., & Van Wassenhove, L. N. (1990). Analysis of scheduling rules for an FMS. International journal of production research, 28(4), 785.CrossRef
go back to reference Nayyar, P., & Khator, S. K. (1993). Operational control of multi-load vehicles in an automated guided vehicle system. In Proceedings of the 15th annual conference on computers and industrial engineering (pp. 503–506). Blacksburg, Virginia, United States: Pergamon Press, Inc., Retrieved from http://portal.acm.org/citation.cfm?id=186340 Nayyar, P., & Khator, S. K. (1993). Operational control of multi-load vehicles in an automated guided vehicle system. In Proceedings of the 15th annual conference on computers and industrial engineering (pp. 503–506). Blacksburg, Virginia, United States: Pergamon Press, Inc., Retrieved from http://​portal.​acm.​org/​citation.​cfm?​id=​186340
go back to reference Occena, L. G., & Yokota, T. (1993). Analysis of the AGV loading capacity in a JIT environment. Journal of Manufacturing Systems, 12(1), 24.CrossRef Occena, L. G., & Yokota, T. (1993). Analysis of the AGV loading capacity in a JIT environment. Journal of Manufacturing Systems, 12(1), 24.CrossRef
go back to reference Orides, M., Castro, P. A. D., Kato, E. R. R., & Camargo, H. A. (2006). A genetic fuzzy system for defining a reactive dispatching rule for AGVs. In Systems, Man and Cybernetics, 2006. SMC ’06. IEEE international conference on (Vol. 1, pp. 56–61). doi:10.1109/ICSMC.2006.384358. Orides, M., Castro, P. A. D., Kato, E. R. R., & Camargo, H. A. (2006). A genetic fuzzy system for defining a reactive dispatching rule for AGVs. In Systems, Man and Cybernetics, 2006. SMC ’06. IEEE international conference on (Vol. 1, pp. 56–61). doi:10.​1109/​ICSMC.​2006.​384358.
go back to reference Ozden, M. (1988). A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 26(8), 1353–1366. doi:10.1080/00207548808947950. Ozden, M. (1988). A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 26(8), 1353–1366. doi:10.​1080/​0020754880894795​0.
go back to reference Sinriech, D., & Kotlarski, J. (2002). A dynamic scheduling algorithm for a multiple-load multiple-carrier system. International Journal of Production Research, 40(5), 1065–1080. doi:10.1080/00207540110105662. Sinriech, D., & Kotlarski, J. (2002). A dynamic scheduling algorithm for a multiple-load multiple-carrier system. International Journal of Production Research, 40(5), 1065–1080. doi:10.​1080/​0020754011010566​2.
go back to reference Vahdani, B., Tavakkoli-Moghaddam, R., Zandieh, M., & Razmi, J. (2012). Vehicle routing scheduling using an enhanced hybrid optimization approach. Journal of Intelligent Manufacturing, 23(3), 759–774. doi:10.1007/s10845-010-0427-y. Vahdani, B., Tavakkoli-Moghaddam, R., Zandieh, M., & Razmi, J. (2012). Vehicle routing scheduling using an enhanced hybrid optimization approach. Journal of Intelligent Manufacturing, 23(3), 759–774. doi:10.​1007/​s10845-010-0427-y.
go back to reference Wang, C.-N., & Chen, L.-C. (2012). The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication. Journal of Intelligent Manufacturing, 23(5), 2047–2056. doi:10.1007/s10845-011-0531-7.CrossRef Wang, C.-N., & Chen, L.-C. (2012). The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication. Journal of Intelligent Manufacturing, 23(5), 2047–2056. doi:10.​1007/​s10845-011-0531-7.CrossRef
go back to reference Weng, W. W., & Leachman, R. C. (1993). An improved methodology for real-time production decisions at batch-process work stations. IEEE Transactions on Semiconductor Manufacturing, 6(3), 219–225. doi:10.1109/66.238169.CrossRef Weng, W. W., & Leachman, R. C. (1993). An improved methodology for real-time production decisions at batch-process work stations. IEEE Transactions on Semiconductor Manufacturing, 6(3), 219–225. doi:10.​1109/​66.​238169.CrossRef
Metadata
Title
A reinforcement learning based approach for a multiple-load carrier scheduling problem
Authors
Ci Chen
Beixin Xia
Bing-hai Zhou
Lifeng Xi
Publication date
19-12-2013
Publisher
Springer US
Published in
Journal of Intelligent Manufacturing / Issue 6/2015
Print ISSN: 0956-5515
Electronic ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-013-0852-9

Other articles of this Issue 6/2015

Journal of Intelligent Manufacturing 6/2015 Go to the issue

Premium Partners