Skip to main content
Top

2019 | OriginalPaper | Chapter

A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints

Authors : Issam Krimi, Afaf Aloullal, Rachid Benmansour, Abdessamad Ait El Cadi, Laurent Deshayes, David Duvivier

Published in: Variable Neighborhood Search

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In this paper, we consider the integrated Berth Allocation and Crane Assignment problem, with availability constraints and high tides restrictions, in bulk port context. We were inspired by a real case study of a port owned by our industrial partner. The objective is to minimize the total penalty of tardiness. First, we implemented a greedy heuristic to compute an initial solution. Then, we proposed a sequential Variable Neighborhood Descent (seq-VND) for the problem. In addition, we compared the efficiency of different scenarios for the seq-VND against results given by a mathematical model for the problem.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Agra, A., Oliveira, M.: MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem. Eur. J. Oper. Res. 264(1), 138–148 (2018)MathSciNetCrossRef Agra, A., Oliveira, M.: MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem. Eur. J. Oper. Res. 264(1), 138–148 (2018)MathSciNetCrossRef
2.
go back to reference Barros, V.H., Costa, T.S., Oliveira, A.C., Lorena, L.A.: Model and heuristic for berth allocation in tidal bulk ports with stock level constraints. Comput. Ind. Eng. 60(4), 606–613 (2011)CrossRef Barros, V.H., Costa, T.S., Oliveira, A.C., Lorena, L.A.: Model and heuristic for berth allocation in tidal bulk ports with stock level constraints. Comput. Ind. Eng. 60(4), 606–613 (2011)CrossRef
3.
go back to reference Becker, C., Scholl, A.: A survey on problems and methods in generalized assembly line balancing. Eur. J. Oper. Res. 168(3), 694–715 (2006)MathSciNetCrossRef Becker, C., Scholl, A.: A survey on problems and methods in generalized assembly line balancing. Eur. J. Oper. Res. 168(3), 694–715 (2006)MathSciNetCrossRef
4.
go back to reference Blazewicz, J., Cheng, T.E., Machowiak, M., Oguz, C.: Berth and quay crane allocation: a moldable task scheduling model. J. Oper. Res. Soc. 62(7), 1189–1197 (2011)CrossRef Blazewicz, J., Cheng, T.E., Machowiak, M., Oguz, C.: Berth and quay crane allocation: a moldable task scheduling model. J. Oper. Res. Soc. 62(7), 1189–1197 (2011)CrossRef
5.
go back to reference Chang, D., Jiang, Z., Yan, W., He, J.: Integrating berth allocation and quay crane assignments. Transp. Res. Part E: Logist. Transp. Rev. 46(6), 975–990 (2010)CrossRef Chang, D., Jiang, Z., Yan, W., He, J.: Integrating berth allocation and quay crane assignments. Transp. Res. Part E: Logist. Transp. Rev. 46(6), 975–990 (2010)CrossRef
6.
go back to reference Cheng, J.K., Tahar, R.M., Ang, C.L.: A system dynamics approach to operational and strategic planning of a container terminal. Int. J. Logist. Syst. Manag. 10(4), 420–436 (2011)CrossRef Cheng, J.K., Tahar, R.M., Ang, C.L.: A system dynamics approach to operational and strategic planning of a container terminal. Int. J. Logist. Syst. Manag. 10(4), 420–436 (2011)CrossRef
7.
go back to reference Diabat, A., Theodorou, E.: An integrated quay crane assignment and scheduling problem. Comput. Ind. Eng. 73, 115–123 (2014)CrossRef Diabat, A., Theodorou, E.: An integrated quay crane assignment and scheduling problem. Comput. Ind. Eng. 73, 115–123 (2014)CrossRef
8.
go back to reference Duarte, A., Mladenović, N., Sánchez-Oro, J., Todosijević, R.: Variable neighborhood descent. In: Handbook of Heuristics, pp. 1–27 (2016) Duarte, A., Mladenović, N., Sánchez-Oro, J., Todosijević, R.: Variable neighborhood descent. In: Handbook of Heuristics, pp. 1–27 (2016)
9.
go back to reference Ernst, A.T., Oğuz, C., Singh, G., Taherkhani, G.: Mathematical models for the berth allocation problem in dry bulk terminals. J. Sched. 20(5), 459–473 (2017)MathSciNetCrossRef Ernst, A.T., Oğuz, C., Singh, G., Taherkhani, G.: Mathematical models for the berth allocation problem in dry bulk terminals. J. Sched. 20(5), 459–473 (2017)MathSciNetCrossRef
10.
go back to reference Fu, Y.M., Diabat, A.: A lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem. Appl. Math. Model. 39(3–4), 1194–1201 (2015)MathSciNetCrossRef Fu, Y.M., Diabat, A.: A lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem. Appl. Math. Model. 39(3–4), 1194–1201 (2015)MathSciNetCrossRef
11.
go back to reference Giallombardo, G., Moccia, L., Salani, M., Vacca, I.: Modeling and solving the tactical berth allocation problem. Transp. Res. Part B: Methodol. 44(2), 232–245 (2010)CrossRef Giallombardo, G., Moccia, L., Salani, M., Vacca, I.: Modeling and solving the tactical berth allocation problem. Transp. Res. Part B: Methodol. 44(2), 232–245 (2010)CrossRef
12.
go back to reference Hansen, P., Mladenović, N., Pérez, J.A.M.: Variable neighbourhood search: methods and applications. Ann. Oper. Res. 175(1), 367–407 (2010)MathSciNetCrossRef Hansen, P., Mladenović, N., Pérez, J.A.M.: Variable neighbourhood search: methods and applications. Ann. Oper. Res. 175(1), 367–407 (2010)MathSciNetCrossRef
13.
go back to reference Imai, A., Sun, X., Nishimura, E., Papadimitriou, S.: Berth allocation in a container port: using a continuous location space approach. Transp. Res. Part B: Methodol. 39(3), 199–221 (2005)CrossRef Imai, A., Sun, X., Nishimura, E., Papadimitriou, S.: Berth allocation in a container port: using a continuous location space approach. Transp. Res. Part B: Methodol. 39(3), 199–221 (2005)CrossRef
14.
go back to reference Iris, Ç., Pacino, D., Ropke, S.: Improved formulations and an adaptive large neighborhood search heuristic for the integrated berth allocation and quay crane assignment problem. Transp. Res. Part E: Logist. Transp. Rev. 105, 123–147 (2017)CrossRef Iris, Ç., Pacino, D., Ropke, S.: Improved formulations and an adaptive large neighborhood search heuristic for the integrated berth allocation and quay crane assignment problem. Transp. Res. Part E: Logist. Transp. Rev. 105, 123–147 (2017)CrossRef
15.
go back to reference Iris, Ç., Pacino, D., Ropke, S., Larsen, A.: Integrated berth allocation and quay crane assignment problem: set partitioning models and computational results. Transp. Res. Part E: Logist. Transp. Rev. 81, 75–97 (2015)CrossRef Iris, Ç., Pacino, D., Ropke, S., Larsen, A.: Integrated berth allocation and quay crane assignment problem: set partitioning models and computational results. Transp. Res. Part E: Logist. Transp. Rev. 81, 75–97 (2015)CrossRef
16.
go back to reference Krimi, I., Benmansour, R., Ait El Cadi, A., Deshayes, L., Duvivier, D., Elhachemi, N.: A rolling horizon approach for the multi-quay berth allocation and crane assignment problem in bulk ports. Computer and Industrial Engineering, under review Krimi, I., Benmansour, R., Ait El Cadi, A., Deshayes, L., Duvivier, D., Elhachemi, N.: A rolling horizon approach for the multi-quay berth allocation and crane assignment problem in bulk ports. Computer and Industrial Engineering, under review
17.
go back to reference Liang, C., Huang, Y., Yang, Y.: A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Comput. Ind. Eng. 56(3), 1021–1028 (2009)CrossRef Liang, C., Huang, Y., Yang, Y.: A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Comput. Ind. Eng. 56(3), 1021–1028 (2009)CrossRef
18.
go back to reference Meisel, F., Bierwirth, C.: Heuristics for the integration of crane productivity in the berth allocation problem. Transp. Res. Part E: Logist. Transp. Rev. 45(1), 196–209 (2009)CrossRef Meisel, F., Bierwirth, C.: Heuristics for the integration of crane productivity in the berth allocation problem. Transp. Res. Part E: Logist. Transp. Rev. 45(1), 196–209 (2009)CrossRef
20.
go back to reference Raa, B., Dullaert, W., Van Schaeren, R.: An enriched model for the integrated berth allocation and quay crane assignment problem. Expert Syst. Appl. 38(11), 14136–14147 (2011) Raa, B., Dullaert, W., Van Schaeren, R.: An enriched model for the integrated berth allocation and quay crane assignment problem. Expert Syst. Appl. 38(11), 14136–14147 (2011)
21.
go back to reference Rodriguez-Molins, M., Salido, M.A., Barber, F.: A grasp-based metaheuristic for the berth allocation problem and the quay crane assignment problem by managing vessel cargo holds. Appl. Intell. 40(2), 273–290 (2014)CrossRef Rodriguez-Molins, M., Salido, M.A., Barber, F.: A grasp-based metaheuristic for the berth allocation problem and the quay crane assignment problem by managing vessel cargo holds. Appl. Intell. 40(2), 273–290 (2014)CrossRef
22.
go back to reference Stopford, M.: Maritime Economics. Routledge, Abingdon (2013) Stopford, M.: Maritime Economics. Routledge, Abingdon (2013)
23.
go back to reference Umang, N., Bierlaire, M., Vacca, I.: Exact and heuristic methods to solve the berth allocation problem in bulk ports. Transp. Res. Part E: Logist. Transp. Rev. 54, 14–31 (2013)CrossRef Umang, N., Bierlaire, M., Vacca, I.: Exact and heuristic methods to solve the berth allocation problem in bulk ports. Transp. Res. Part E: Logist. Transp. Rev. 54, 14–31 (2013)CrossRef
24.
go back to reference Vacca, I., Salani, M., Bierlaire, M.: An exact algorithm for the integrated planning of berth allocation and quay crane assignment. Transp. Sci. 47(2), 148–161 (2013)CrossRef Vacca, I., Salani, M., Bierlaire, M.: An exact algorithm for the integrated planning of berth allocation and quay crane assignment. Transp. Sci. 47(2), 148–161 (2013)CrossRef
25.
go back to reference Yang, C., Wang, X., Li, Z.: An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal. Comput. Ind. Eng. 63(1), 243–253 (2012)CrossRef Yang, C., Wang, X., Li, Z.: An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal. Comput. Ind. Eng. 63(1), 243–253 (2012)CrossRef
Metadata
Title
A Variable Neighborhood Descent Heuristic for the Multi-quay Berth Allocation and Crane Assignment Problem Under Availability Constraints
Authors
Issam Krimi
Afaf Aloullal
Rachid Benmansour
Abdessamad Ait El Cadi
Laurent Deshayes
David Duvivier
Copyright Year
2019
DOI
https://doi.org/10.1007/978-3-030-15843-9_18

Premium Partner