Skip to main content
Top
Published in: The International Journal of Advanced Manufacturing Technology 9/2019

07-05-2019 | ORIGINAL ARTICLE

An Industry 4.0 approach to assembly line resequencing

Authors: Daniel Alejandro Rossit, Fernando Tohmé, Mariano Frutos

Published in: The International Journal of Advanced Manufacturing Technology | Issue 9/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Contemporary assembly line systems are characterized by an increasing capability to offer each client a different product, more tuned to her needs and preferences. These assembly systems will be heavily influenced by the advent of Industry 4.0 technologies, enabling the proposal of business models that allow the late customization of the products, i.e., the customer can modify attributes of its product once the production of it is started. This business model requires that the manufacturing tools are able to make decisions online and negotiate with the customer the changes that can be carried out, according to the workload flowing through the production system. In this work, we analyze the possibilities and limitations of this new paradigm. First, we show that Industry 4.0 systems can autonomously manage the production management process, and then, we present a framework based on tolerance planning strategies (tolerance scheduling problem), to determine which changes can be carried out. The ability of resequencing the production process is also implemented in the case that the operations associated with late customization allow it (i.e., when intermediate buffers are available). This establishes a parallelism with the problem of non-permutation flow shop. We finally discuss future developments necessary to implement these procedures.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Hermann M, Pentek T, & Otto B (2016, January) Design principles for Industrie 4.0 scenarios. In 2016 49th Hawaii International Conference on System Sciences (HICSS), Hawaii USA (pp. 3928-3937). IEEE Hermann M, Pentek T, & Otto B (2016, January) Design principles for Industrie 4.0 scenarios. In 2016 49th Hawaii International Conference on System Sciences (HICSS), Hawaii USA (pp. 3928-3937). IEEE
2.
go back to reference Monostori L (2014) Cyber-physical production systems: roots, expectations and R&D challenges. Procedia CIRP 17:9–13 Monostori L (2014) Cyber-physical production systems: roots, expectations and R&D challenges. Procedia CIRP 17:9–13
3.
go back to reference Rossit D, Tohmé F (2018) Scheduling research contributions to Smart manufacturing. MFGLET 15(B):111–114 Rossit D, Tohmé F (2018) Scheduling research contributions to Smart manufacturing. MFGLET 15(B):111–114
5.
go back to reference Lee E A (2008, May) Cyber physical systems: design challenges. In 2008 11th ieee international symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC), Orlando, FL, USA (pp. 363-369). IEEE Lee E A (2008, May) Cyber physical systems: design challenges. In 2008 11th ieee international symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC), Orlando, FL, USA (pp. 363-369). IEEE
6.
go back to reference Mueller B (2012) Additive manufacturing technologies–rapid prototyping to direct digital manufacturing. Assem Autom 32(2) Mueller B (2012) Additive manufacturing technologies–rapid prototyping to direct digital manufacturing. Assem Autom 32(2)
7.
go back to reference Yao X, Lin Y (2016) Emerging manufacturing paradigm shifts for the incoming industrial revolution. Int J Adv Manuf Technol 85(5-8):1665–1676 Yao X, Lin Y (2016) Emerging manufacturing paradigm shifts for the incoming industrial revolution. Int J Adv Manuf Technol 85(5-8):1665–1676
8.
go back to reference Kumar A (2007) From mass customization to mass personalization: a strategic transformation. Int J Flex Manuf Syst 19(4):533–547 Kumar A (2007) From mass customization to mass personalization: a strategic transformation. Int J Flex Manuf Syst 19(4):533–547
10.
go back to reference Bortolini M, Ferrari E, Gamberi M, Pilati F, Faccio M (2017a) Assembly system design in the Industry 4.0 era: a general framework. IFAC-PapersOnLine 50(1):5700–5705 Bortolini M, Ferrari E, Gamberi M, Pilati F, Faccio M (2017a) Assembly system design in the Industry 4.0 era: a general framework. IFAC-PapersOnLine 50(1):5700–5705
11.
go back to reference ElMaraghy H, ElMaraghy W (2016) Smart adaptable assembly systems. Procedia CIRP 44:4–13 ElMaraghy H, ElMaraghy W (2016) Smart adaptable assembly systems. Procedia CIRP 44:4–13
12.
go back to reference Pine BJ, Victor B, Boynton AC (1993) Making mass customization work. Harv Bus Rev 71(5):108–111 Pine BJ, Victor B, Boynton AC (1993) Making mass customization work. Harv Bus Rev 71(5):108–111
13.
go back to reference Singer G, Golan M, Cohen Y (2014) From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. Int J Prod Res 52(2):507–520 Singer G, Golan M, Cohen Y (2014) From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. Int J Prod Res 52(2):507–520
14.
go back to reference Bucklin LP (1965) Postponement, speculation and the structure of distribution channels. J Mark Res 2:26–31 Bucklin LP (1965) Postponement, speculation and the structure of distribution channels. J Mark Res 2:26–31
15.
go back to reference Naylor JB, Naim MM, Berry D (1999) Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain. Int J Prod Econ 62(1-2):107–118 Naylor JB, Naim MM, Berry D (1999) Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain. Int J Prod Econ 62(1-2):107–118
16.
go back to reference Van Hoek RI (2001) The rediscovery of postponement a literature review and directions for research. J Oper Manag 19(2):161–184 Van Hoek RI (2001) The rediscovery of postponement a literature review and directions for research. J Oper Manag 19(2):161–184
17.
go back to reference Nieuwenhuis P, Katsifou E (2015) More sustainable automotive production through understanding decoupling points in leagile manufacturing. J Clean Prod 95:232–241 Nieuwenhuis P, Katsifou E (2015) More sustainable automotive production through understanding decoupling points in leagile manufacturing. J Clean Prod 95:232–241
18.
go back to reference Shah R, Ward PT (2003) Lean manufacturing: context, practice bundles, and performance. J Oper Manag 21(2):129–149 Shah R, Ward PT (2003) Lean manufacturing: context, practice bundles, and performance. J Oper Manag 21(2):129–149
19.
go back to reference Yusuf YY, Sarhadi M, Gunasekaran A (1999) Agile manufacturing: the drivers, concepts and attributes. Int J Prod Econ 62(1-2):33–43 Yusuf YY, Sarhadi M, Gunasekaran A (1999) Agile manufacturing: the drivers, concepts and attributes. Int J Prod Econ 62(1-2):33–43
20.
go back to reference Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373MathSciNetMATH Boysen N, Fliedner M, Scholl A (2009) Sequencing mixed-model assembly lines: survey, classification and model critique. Eur J Oper Res 192(2):349–373MathSciNetMATH
21.
go back to reference Faccio M, Gamberi M, Bortolini M, Pilati F (2018) Macro and micro-logistic aspects in defining the parts-feeding policy in mixed-model assembly systems. IJSOM 31(4):433–462 Faccio M, Gamberi M, Bortolini M, Pilati F (2018) Macro and micro-logistic aspects in defining the parts-feeding policy in mixed-model assembly systems. IJSOM 31(4):433–462
22.
go back to reference Boysen N, Scholl A, Wopperer N (2012) Resequencing of mixed-model assembly lines: survey and research agenda. Eur J Oper Res 216(3):594–604 Boysen N, Scholl A, Wopperer N (2012) Resequencing of mixed-model assembly lines: survey and research agenda. Eur J Oper Res 216(3):594–604
23.
go back to reference Rossit DA, Tohmé F, Frutos M (2018a) The non-permutation flow-shop scheduling problem: a literature review. Omega 77:143–153 Rossit DA, Tohmé F, Frutos M (2018a) The non-permutation flow-shop scheduling problem: a literature review. Omega 77:143–153
24.
go back to reference Becker C, Scholl A (2006) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168(3):694–715MathSciNetMATH Becker C, Scholl A (2006) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168(3):694–715MathSciNetMATH
25.
go back to reference Boysen N, Fliedner M, Scholl A (2007) A classification of assembly line balancing problems. Eur J Oper Res 183(2):674–693MATH Boysen N, Fliedner M, Scholl A (2007) A classification of assembly line balancing problems. Eur J Oper Res 183(2):674–693MATH
26.
go back to reference Faccio M (2014) The impact of production mix variations and models varieties on the parts-feeding policy selection in a JIT assembly system. Int J Adv Manuf Technol 72(1-4):543–560 Faccio M (2014) The impact of production mix variations and models varieties on the parts-feeding policy selection in a JIT assembly system. Int J Adv Manuf Technol 72(1-4):543–560
27.
go back to reference Bortolini M, Faccio M, Gamberi M, Pilati F (2017b) Multi-objective assembly line balancing considering component picking and ergonomic risk. Comput Ind Eng 112:348–367 Bortolini M, Faccio M, Gamberi M, Pilati F (2017b) Multi-objective assembly line balancing considering component picking and ergonomic risk. Comput Ind Eng 112:348–367
28.
go back to reference Bortolini M, Faccio M, Gamberi M, Pilati F (2018b) Motion Analysis System (MAS) for production and ergonomics assessment in the manufacturing processes. Comput Ind Eng Bortolini M, Faccio M, Gamberi M, Pilati F (2018b) Motion Analysis System (MAS) for production and ergonomics assessment in the manufacturing processes. Comput Ind Eng
29.
go back to reference Bard JF, Dar-Elj EZEY, Shtub A (1992) An analytic framework for sequencing mixed model assembly lines. Int J Prod Res 30(1):35–48MATH Bard JF, Dar-Elj EZEY, Shtub A (1992) An analytic framework for sequencing mixed model assembly lines. Int J Prod Res 30(1):35–48MATH
30.
go back to reference Bard JF, Shtub A, Joshi SB (1994) Sequencing mixed-model assembly lines to level parts usage and minimize line length. Int J Prod Res 32(10):2431–2454MATH Bard JF, Shtub A, Joshi SB (1994) Sequencing mixed-model assembly lines to level parts usage and minimize line length. Int J Prod Res 32(10):2431–2454MATH
31.
go back to reference Ouelhadj D, Petrovic S (2009) A survey of dynamic scheduling in manufacturing systems. J Sched 12(4):417–431MathSciNetMATH Ouelhadj D, Petrovic S (2009) A survey of dynamic scheduling in manufacturing systems. J Sched 12(4):417–431MathSciNetMATH
32.
go back to reference Vieira GE, Herrmann JW, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J Sched 6(1):39–62MathSciNetMATH Vieira GE, Herrmann JW, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J Sched 6(1):39–62MathSciNetMATH
33.
go back to reference Bortolini M, Faccio M, Gamberi M, Pilati F (2016) Including material exposure and part attributes in the manual assembly line balancing problem. IFAC-PapersOnLine 49(12):926–931 Bortolini M, Faccio M, Gamberi M, Pilati F (2016) Including material exposure and part attributes in the manual assembly line balancing problem. IFAC-PapersOnLine 49(12):926–931
34.
go back to reference Battini D, Faccio M, Persona A, Sgarbossa F (2009) Design of the optimal feeding policy in an assembly system. Int J Prod Econ 121(1):233–254 Battini D, Faccio M, Persona A, Sgarbossa F (2009) Design of the optimal feeding policy in an assembly system. Int J Prod Econ 121(1):233–254
35.
go back to reference Faccio M, Gamberi M, Pilati F, Bortolini M (2015) Packaging strategy definition for sales kits within an assembly system. Int J Prod Res 53(11):3288–3305 Faccio M, Gamberi M, Pilati F, Bortolini M (2015) Packaging strategy definition for sales kits within an assembly system. Int J Prod Res 53(11):3288–3305
36.
go back to reference Bortolini M, Gamberi M, Pilati F, Regattieri A (2018a) Automatic assessment of the ergonomic risk for manual manufacturing and assembly activities through optical motion capture technology. Procedia CIRP 72:81–86 Bortolini M, Gamberi M, Pilati F, Regattieri A (2018a) Automatic assessment of the ergonomic risk for manual manufacturing and assembly activities through optical motion capture technology. Procedia CIRP 72:81–86
37.
go back to reference Bukchin Y, Cohen Y (2013) Minimising throughput loss in assembly lines due to absenteeism and turnover via work-sharing. Int J Prod Res 51(20):6140–6151 Bukchin Y, Cohen Y (2013) Minimising throughput loss in assembly lines due to absenteeism and turnover via work-sharing. Int J Prod Res 51(20):6140–6151
38.
go back to reference Cohen Y (2012) Absenteeism as a major cause of bottlenecks in assembly lines. Int J Prod Res 50(21):6072–6080 Cohen Y (2012) Absenteeism as a major cause of bottlenecks in assembly lines. Int J Prod Res 50(21):6072–6080
39.
go back to reference Wang L, Törngren M, Onori M (2015) Current status and advancement of cyber-physical systems in manufacturing. J Manuf Syst 37(Part 2):517–527 Wang L, Törngren M, Onori M (2015) Current status and advancement of cyber-physical systems in manufacturing. J Manuf Syst 37(Part 2):517–527
40.
go back to reference Zhong RY, Newman ST, Huang GQ, Lan S (2016) Big data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives. Comput Ind Eng 101:572–591 Zhong RY, Newman ST, Huang GQ, Lan S (2016) Big data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives. Comput Ind Eng 101:572–591
41.
go back to reference Xu X (2012) From cloud computing to cloud manufacturing. Robot Comput Integr Manuf 28(1):75–86 Xu X (2012) From cloud computing to cloud manufacturing. Robot Comput Integr Manuf 28(1):75–86
42.
go back to reference Zhou J, Yao X (2017a) A hybrid artificial bee colony algorithm for optimal selection of QoS-based cloud manufacturing service composition. Int J Adv Manuf Technol 88(9-12):3371–3387 Zhou J, Yao X (2017a) A hybrid artificial bee colony algorithm for optimal selection of QoS-based cloud manufacturing service composition. Int J Adv Manuf Technol 88(9-12):3371–3387
43.
go back to reference Zhou J, Yao X (2017b) DE-caABC: differential evolution enhanced context-aware artificial bee colony algorithm for service composition and optimal selection in cloud manufacturing. Int J Adv Manuf Technol 90(1-4):1085–1103 Zhou J, Yao X (2017b) DE-caABC: differential evolution enhanced context-aware artificial bee colony algorithm for service composition and optimal selection in cloud manufacturing. Int J Adv Manuf Technol 90(1-4):1085–1103
44.
go back to reference Zhou J, Yao X (2017c) Hybrid teaching–learning-based optimization of correlation-aware service composition in cloud manufacturing. Int J Adv Manuf Technol 91(9-12):3515–3533 Zhou J, Yao X (2017c) Hybrid teaching–learning-based optimization of correlation-aware service composition in cloud manufacturing. Int J Adv Manuf Technol 91(9-12):3515–3533
45.
go back to reference Porter ME, Heppelmann JE (2015) How smart, connected products are transforming companies. Harv Bus Rev 93(10):96–114 Porter ME, Heppelmann JE (2015) How smart, connected products are transforming companies. Harv Bus Rev 93(10):96–114
46.
go back to reference Pfeiffer S (2016) Robots, Industry 4.0 and humans, or why assembly work is more than routine work. Societies 6(2):16 Pfeiffer S (2016) Robots, Industry 4.0 and humans, or why assembly work is more than routine work. Societies 6(2):16
47.
go back to reference Hedman R, Almström P (2017) A state of the art system for managing time data in manual assembly. Int J Comput Integr Manuf 30(10):1060–1071 Hedman R, Almström P (2017) A state of the art system for managing time data in manual assembly. Int J Comput Integr Manuf 30(10):1060–1071
48.
go back to reference Xu P, Mei H, Ren L, Chen W (2017) ViDX: Visual diagnostics of assembly line performance in smart factories. IEEE Trans Vis Comput Graph 23(1):291–300 Xu P, Mei H, Ren L, Chen W (2017) ViDX: Visual diagnostics of assembly line performance in smart factories. IEEE Trans Vis Comput Graph 23(1):291–300
49.
go back to reference Gewohn, M., Beyerer, J., Usländer, T., & Sutschet, G. (2018, March). A quality visualization model for the evaluation and control of quality in vehicle assembly. In 2018 7th International Conference on Industrial Technology and Management (ICITM), Oxford, UK (pp. 1–10). IEEE Gewohn, M., Beyerer, J., Usländer, T., & Sutschet, G. (2018, March). A quality visualization model for the evaluation and control of quality in vehicle assembly. In 2018 7th International Conference on Industrial Technology and Management (ICITM), Oxford, UK (pp. 1–10). IEEE
50.
go back to reference Gewohn M, Usländer T, Beyerer J, & Sutschet G (2017) Digital real-time feedback of quality-related information to inspection and installation areas of vehicle assembly. In 2017 11th CIRP Conference on Intelligent Computation in Manufacturing Engineering (CIRP ICME'17), Ischia, Italy. 10.1016/j.procir.2017.12.242. https://doi.org/10.1016/j.procir.2017.12.242 Gewohn M, Usländer T, Beyerer J, & Sutschet G (2017) Digital real-time feedback of quality-related information to inspection and installation areas of vehicle assembly. In 2017 11th CIRP Conference on Intelligent Computation in Manufacturing Engineering (CIRP ICME'17), Ischia, Italy. 10.1016/j.procir.2017.12.242. https://​doi.​org/​10.​1016/​j.​procir.​2017.​12.​242
51.
go back to reference Cohen Y, Faccio M, Galizia FG, Mora C, Pilati F (2017) Assembly system configuration through Industry 4.0 principles: the expected change in the actual paradigms. IFAC-PapersOnLine 50(1):14958–14963 Cohen Y, Faccio M, Galizia FG, Mora C, Pilati F (2017) Assembly system configuration through Industry 4.0 principles: the expected change in the actual paradigms. IFAC-PapersOnLine 50(1):14958–14963
52.
go back to reference Vollmann Thomas E, Berry William L, Whybark DC & Jacobs R (2005) Manufacturing planning and control for supply chain management. McGraw-Hill/Irwin. 5th Edition Vollmann Thomas E, Berry William L, Whybark DC & Jacobs R (2005) Manufacturing planning and control for supply chain management. McGraw-Hill/Irwin. 5th Edition
54.
go back to reference Anderson C (2008) The long tail: why the future of business is selling less of more. Hyperion Books Anderson C (2008) The long tail: why the future of business is selling less of more. Hyperion Books
55.
go back to reference Yusuf YY, Gunasekaran A, Adeleye EO, Sivayoganathan K (2004) Agile supply chain capabilities: determinants of competitive objectives. Eur J Oper Res 159(2):379–392MATH Yusuf YY, Gunasekaran A, Adeleye EO, Sivayoganathan K (2004) Agile supply chain capabilities: determinants of competitive objectives. Eur J Oper Res 159(2):379–392MATH
56.
go back to reference Alderson W (1950) Marketing efficiency and the principle of postponement. Cost and Profit Outlook 3:15–18 Alderson W (1950) Marketing efficiency and the principle of postponement. Cost and Profit Outlook 3:15–18
57.
go back to reference Alderson W (2006) Marketing efficiency and the principle of postponement. In: A twenty-first century guide to Aldersonian marketing thought. Springer, Boston, MA, pp 109–113 Alderson W (2006) Marketing efficiency and the principle of postponement. In: A twenty-first century guide to Aldersonian marketing thought. Springer, Boston, MA, pp 109–113
58.
go back to reference Mason-Jones R, Naylor B, Towill DR (2000) Lean, agile or leagile? Matching your supply chain to the marketplace. Int J Prod Res 38(17):4061–4070 Mason-Jones R, Naylor B, Towill DR (2000) Lean, agile or leagile? Matching your supply chain to the marketplace. Int J Prod Res 38(17):4061–4070
59.
go back to reference Ghobakhloo M, Azar A (2018) Business excellence via advanced manufacturing technology and lean-agile manufacturing. J Manuf Technol Manag 29(1):2–24 Ghobakhloo M, Azar A (2018) Business excellence via advanced manufacturing technology and lean-agile manufacturing. J Manuf Technol Manag 29(1):2–24
60.
go back to reference Aljorephani SK, ElMaraghy HA (2016) Impact of product platform and market demand on manufacturing system performance and production cost. Procedia CIRP 52:74–79 Aljorephani SK, ElMaraghy HA (2016) Impact of product platform and market demand on manufacturing system performance and production cost. Procedia CIRP 52:74–79
61.
go back to reference Hu SJ, Zhu X, Wang H, Koren Y (2008) Product variety and manufacturing complexity in assembly systems and supply chains. CIRP Ann Manuf Technol 57(1):45–48 Hu SJ, Zhu X, Wang H, Koren Y (2008) Product variety and manufacturing complexity in assembly systems and supply chains. CIRP Ann Manuf Technol 57(1):45–48
62.
go back to reference Abbas M, ElMaraghy H (2018) Co-platforming of products and assembly systems. Omega 78:5–20 Abbas M, ElMaraghy H (2018) Co-platforming of products and assembly systems. Omega 78:5–20
63.
go back to reference Simpson TW, Jiao J, Siddique Z, Hölttä-Otto K (2014) Advances in product family and product platform design. Springer, New YorN Simpson TW, Jiao J, Siddique Z, Hölttä-Otto K (2014) Advances in product family and product platform design. Springer, New YorN
64.
go back to reference Simpson TW (2004) Product platform design and customization: status and promise. Ai Edam 18(1):3–20 Simpson TW (2004) Product platform design and customization: status and promise. Ai Edam 18(1):3–20
65.
go back to reference ElMaraghy H, Abbas M (2015) Products-manufacturing systems co-platforming. CIRP Ann 64(1):407–410 ElMaraghy H, Abbas M (2015) Products-manufacturing systems co-platforming. CIRP Ann 64(1):407–410
66.
go back to reference Manzini M, Unglert J, Gyulai D, Colledani M, Jauregui-Becker JM, Monostori L, Urgo M (2018) An integrated framework for design, management and operation of reconfigurable assembly systems. Omega 78:69–84 Manzini M, Unglert J, Gyulai D, Colledani M, Jauregui-Becker JM, Monostori L, Urgo M (2018) An integrated framework for design, management and operation of reconfigurable assembly systems. Omega 78:69–84
67.
go back to reference Pereira J, Álvarez-Miranda E (2018) An exact approach for the robust assembly line balancing problem. Omega 78:85–98 Pereira J, Álvarez-Miranda E (2018) An exact approach for the robust assembly line balancing problem. Omega 78:85–98
68.
go back to reference Brucker P, Shakhlevich NV (2009) Inverse scheduling with maximum lateness objective. IJSOM 12(5):475–488MathSciNetMATH Brucker P, Shakhlevich NV (2009) Inverse scheduling with maximum lateness objective. IJSOM 12(5):475–488MathSciNetMATH
69.
go back to reference Koulamas C (2005) Inverse scheduling with controllable job parameters. International Journal of Services and Operations Management 1(1):35–43 Koulamas C (2005) Inverse scheduling with controllable job parameters. International Journal of Services and Operations Management 1(1):35–43
70.
go back to reference Brucker P, Shakhlevich NV (2011) Inverse scheduling: two-machine flow-shop problem. J Sched 14(3):239–256MathSciNetMATH Brucker P, Shakhlevich NV (2011) Inverse scheduling: two-machine flow-shop problem. J Sched 14(3):239–256MathSciNetMATH
71.
go back to reference Rossit D, Tohmé F, Frutos M, Bard J, Broz D (2016) A non-permutation flowshop scheduling problem with lot streaming: a mathematical model. Int J Ind Eng Comput 7(3):507–516 Rossit D, Tohmé F, Frutos M, Bard J, Broz D (2016) A non-permutation flowshop scheduling problem with lot streaming: a mathematical model. Int J Ind Eng Comput 7(3):507–516
72.
go back to reference Brucker P, Heitmann S, Hurink J (2003) Flow-shop problems with intermediate buffers. JACM 25(4):549–574MathSciNetMATH Brucker P, Heitmann S, Hurink J (2003) Flow-shop problems with intermediate buffers. JACM 25(4):549–574MathSciNetMATH
73.
go back to reference Papadimitriou CH, Kanellakis PC (1980) Flowshop scheduling with limited temporary storage. Journal of the ACM (JACM) 27(3):533–549MathSciNetMATH Papadimitriou CH, Kanellakis PC (1980) Flowshop scheduling with limited temporary storage. Journal of the ACM (JACM) 27(3):533–549MathSciNetMATH
74.
go back to reference Ritt M, Costa AM, Miralles C (2016) The assembly line worker assignment and balancing problem with stochastic worker availability. Int J Prod Res 54(3):907–922 Ritt M, Costa AM, Miralles C (2016) The assembly line worker assignment and balancing problem with stochastic worker availability. Int J Prod Res 54(3):907–922
75.
go back to reference Rossit DA, Vásquez ÓC, Tohmé F, Frutos M, Safe MD (2018c) The dominance flow shop scheduling problem. Electron Notes Discrete Math 69:21–28MathSciNet Rossit DA, Vásquez ÓC, Tohmé F, Frutos M, Safe MD (2018c) The dominance flow shop scheduling problem. Electron Notes Discrete Math 69:21–28MathSciNet
Metadata
Title
An Industry 4.0 approach to assembly line resequencing
Authors
Daniel Alejandro Rossit
Fernando Tohmé
Mariano Frutos
Publication date
07-05-2019
Publisher
Springer London
Published in
The International Journal of Advanced Manufacturing Technology / Issue 9/2019
Print ISSN: 0268-3768
Electronic ISSN: 1433-3015
DOI
https://doi.org/10.1007/s00170-019-03804-0

Other articles of this Issue 9/2019

The International Journal of Advanced Manufacturing Technology 9/2019 Go to the issue

Premium Partners