Analysis and Mitigation of Delay in Construction of Multistoried Building

Authors : C. P. Muneera, K. J. Joe Maria

Published in: Advances in Civil Engineering

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Any constructional project success can be realized by achieving its objectives within the planned time, budget and level of quality. One of the major problems that face the construction projects is being behind the schedule. Hence, there is a need to analyse the delays in the construction process followed by the mitigation process. This study focuses on the factor that causes a delay in the construction of multistoried residential buildings located in Kerala, India. The methodology adopted comprises data collection and analysis. Data collected include project type, duration of each activity, planned schedule and actual schedule. Time overrun of each activity was calculated, using this data. Duration Index and Delay Index was proposed and used to determine the critical activities. Delay prediction model was developed by considering its significant variables. The results from the prediction model revealed that the foundation, painting and masonry are the most influencing activities that contribute to the delay in the construction of a multistoried building. A questionnaire was developed in order to evaluate the cause of the delay in each activity. Data were gathered through the survey, ranked using Likert scale and relative importance index (RII) was found. Significant causes of delay and their severities on each activity were identified using RII. Response from the questionnaire survey concludes that the inadequacy of material and labour resources is the prominent cause of the delay in construction. This study paves a way in the construction engineering field to mitigate, analyse and overcome the overall delay in the construction of multistoried buildings.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
3.
go back to reference Abdul Kadir MR, Lee WP, Jaafar MS, et al (2005) Factors affecting construction labour productivity for Malaysian residential projects. Struct Surv. https://doi.org/10.1108/02630800510586907 Abdul Kadir MR, Lee WP, Jaafar MS, et al (2005) Factors affecting construction labour productivity for Malaysian residential projects. Struct Surv. https://​doi.​org/​10.​1108/​0263080051058690​7
6.
go back to reference Haseeb M, Bibi A, Rabbani W (2011) Problems of projects and effects of delays in the construction industry of Pakistan. Aust J Bus Manag Res Haseeb M, Bibi A, Rabbani W (2011) Problems of projects and effects of delays in the construction industry of Pakistan. Aust J Bus Manag Res
9.
go back to reference Salleh R (2009) Critical success factors of project management for brunei construction projects: improving project performance. Queensl Univ Technol Salleh R (2009) Critical success factors of project management for brunei construction projects: improving project performance. Queensl Univ Technol
12.
go back to reference Besner C, Hobbs B (2012) An empirical identification of project management toolsets and a comparison among project types. Proj Manag J Besner C, Hobbs B (2012) An empirical identification of project management toolsets and a comparison among project types. Proj Manag J
13.
go back to reference Rao BP, Shekar SC, Jaiswal N, et al (2016) Delay analysis of construction projects. J IT Econ Dev Rao BP, Shekar SC, Jaiswal N, et al (2016) Delay analysis of construction projects. J IT Econ Dev
17.
go back to reference Motaleb O, Kishk M (2010) An investigation into causes and effects of construction delays in UAE. In: 26th Annual ARCOM Conference Motaleb O, Kishk M (2010) An investigation into causes and effects of construction delays in UAE. In: 26th Annual ARCOM Conference
18.
go back to reference Assbeihat JM, Publication I (2016) Factors affecting delays on private construction projects Assbeihat JM, Publication I (2016) Factors affecting delays on private construction projects
20.
go back to reference Rajgor M, Paresh C, Dhruv P, Dhrmesh B (2016) RII & IMPI: effective techniques for finding delay in construction project. Int Res J Eng Technol Rajgor M, Paresh C, Dhruv P, Dhrmesh B (2016) RII & IMPI: effective techniques for finding delay in construction project. Int Res J Eng Technol
21.
go back to reference Senouci A, Ismail A, Eldin N (2016) Time delay and cost overrun in Qatari public construction projects. Procedia Eng Senouci A, Ismail A, Eldin N (2016) Time delay and cost overrun in Qatari public construction projects. Procedia Eng
Metadata
Title
Analysis and Mitigation of Delay in Construction of Multistoried Building
Authors
C. P. Muneera
K. J. Joe Maria
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-5644-9_4