Abstract

The construction of shield tunneling through pile foundation will cause additional deformation and internal force of pile foundation, which will affect the safety and applicability of superstructure. Based on the engineering background of a large-diameter shield (\(\Phi\)10.9 m) side crossing a viaduct, a three-dimensional finite element model for the construction of large-diameter shield side crossing viaduct pile foundations is established by using the finite element method. The reliability of the numerical model is verified by using the surface subsidence calculated by Peck formula as a reference. Based on this, the viaduct pier and piles additional response during the construction are developed, the analysis results shows that: Because the pile foot of the viaduct is located below the tunnel, the pier deformation during the shield construction is mainly in the transverse direction along the bridge; The deformation of piles is mainly lateral and vertical, and the lateral deformation is S-shaped, the deformation of piles near the tunnel axis is far away from the tunnel side, and the piles at this position has the maximum lateral deformation; The variation characteristics of the additional internal force of piles are similar to the additional deformation, the position of the maximum additional bending moment is consistent with the position of the maximum lateral deformation, while the maximum additional shear force of pile foundation is slightly lower than the tunnel axis. And the protection measures of elevated pile foundation proposed by the project are demonstrated, The calculation results show that the additional deformation of pier and piles has been significantly improved after taking the measures of stratum reinforcement, and its value is far lower than the standard control value.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Attewell PB (1982) Predicting the dynamics of ground settlement and its derivatives caused by tunnelling in soil. Ground Eng 15(8):13–22 Attewell PB (1982) Predicting the dynamics of ground settlement and its derivatives caused by tunnelling in soil. Ground Eng 15(8):13–22
go back to reference Boldini D, Losacco N, Bertolin S, Amorosi A (2018) Finite element modelling of tunnelling-induced displacements on framed structures. Tunn Undergr Space Technol 80:222–231CrossRef Boldini D, Losacco N, Bertolin S, Amorosi A (2018) Finite element modelling of tunnelling-induced displacements on framed structures. Tunn Undergr Space Technol 80:222–231CrossRef
go back to reference Chen WZ, Wu GJ, Jia SP (2010) Application of ABAQUS in tunnelling and underground engineering. China Water Power Press, Beijing ((in Chinese)) Chen WZ, Wu GJ, Jia SP (2010) Application of ABAQUS in tunnelling and underground engineering. China Water Power Press, Beijing ((in Chinese))
go back to reference Cheng H, Chen J, Chen G (2019) Analysis of ground surface settlement induced by a large EPB shield tunnelling: a case study in Beijing, China. Environ Earth Sci 78(20):1–18CrossRef Cheng H, Chen J, Chen G (2019) Analysis of ground surface settlement induced by a large EPB shield tunnelling: a case study in Beijing, China. Environ Earth Sci 78(20):1–18CrossRef
go back to reference Kaalberg FJ, Teunissen EAH, Van TAF, Bosch JW (2005) Dutch research on the impact of shield tunnelling on pile foundations. In: Proceedings of the 5th international symposium on geotechnical aspects of underground construction in soft ground, pp 123–131 Kaalberg FJ, Teunissen EAH, Van TAF, Bosch JW (2005) Dutch research on the impact of shield tunnelling on pile foundations. In: Proceedings of the 5th international symposium on geotechnical aspects of underground construction in soft ground, pp 123–131
go back to reference Li P, Lu Y, Lai J, Liu H, Wang K (2020) A comparative study of protective schemes for shield tunneling adjacent to pile groups. Adv Civ Eng 2020:1–16 Li P, Lu Y, Lai J, Liu H, Wang K (2020) A comparative study of protective schemes for shield tunneling adjacent to pile groups. Adv Civ Eng 2020:1–16
go back to reference Liu C, Zhang Z, Regueiro RA (2014) Pile and pile group response to tunnelling using a large diameter slurry shield-Case study in Shanghai. Comput Geotech 59:21–43CrossRef Liu C, Zhang Z, Regueiro RA (2014) Pile and pile group response to tunnelling using a large diameter slurry shield-Case study in Shanghai. Comput Geotech 59:21–43CrossRef
go back to reference Lv J, Li X, Li Z, Fu H (2020) Numerical simulations of construction of shield tunnel with small clearance to adjacent tunnel without and with isolation pile reinforcement. KSCE J Civ Eng 24(1):295–309CrossRef Lv J, Li X, Li Z, Fu H (2020) Numerical simulations of construction of shield tunnel with small clearance to adjacent tunnel without and with isolation pile reinforcement. KSCE J Civ Eng 24(1):295–309CrossRef
go back to reference Mashimo H, Ishimura T (2003) Evaluation of the load on shield tunnel lining in gravel. Tunn Undergr Space Technol 18(2–3):233–241CrossRef Mashimo H, Ishimura T (2003) Evaluation of the load on shield tunnel lining in gravel. Tunn Undergr Space Technol 18(2–3):233–241CrossRef
go back to reference Nematollahi M, Dias D (2019) Three-dimensional numerical simulation of pile-twin tunnels interaction—case of the Shiraz subway line. Tunn Undergr Space Technol 86:75–88CrossRef Nematollahi M, Dias D (2019) Three-dimensional numerical simulation of pile-twin tunnels interaction—case of the Shiraz subway line. Tunn Undergr Space Technol 86:75–88CrossRef
go back to reference Peck RB (1969) Deep excavations and tunneling in soft ground. In: Proc 7th ICSMFE, pp 225–290 Peck RB (1969) Deep excavations and tunneling in soft ground. In: Proc 7th ICSMFE, pp 225–290
go back to reference Sirivachiraporn A, Phienwej N (2012) Ground movements in EPB shield tunneling of Bangkok subway project and impacts on adjacent buildings. Tunn Undergr Space Technol 30:10–24CrossRef Sirivachiraporn A, Phienwej N (2012) Ground movements in EPB shield tunneling of Bangkok subway project and impacts on adjacent buildings. Tunn Undergr Space Technol 30:10–24CrossRef
go back to reference Teparaksa W, Tangpraprutgul T, Boonsong C, Boonard J (2006) Ground and bridge displacement due to epb shield tunnel bored underneath bridge pile foundation. In: Proceedings of the international symposium on underground excavation and tunneling, pp 299–307 Teparaksa W, Tangpraprutgul T, Boonsong C, Boonard J (2006) Ground and bridge displacement due to epb shield tunnel bored underneath bridge pile foundation. In: Proceedings of the international symposium on underground excavation and tunneling, pp 299–307
go back to reference Xu Q, Zhu H, Ma X, Ma Z, Li X, Tang Z, Zhuo K (2015) A case history of shield tunnel crossing through group pile foundation of a road bridge with pile underpinning technologies in Shanghai. Tunn Undergr Space Technol 45:20–33CrossRef Xu Q, Zhu H, Ma X, Ma Z, Li X, Tang Z, Zhuo K (2015) A case history of shield tunnel crossing through group pile foundation of a road bridge with pile underpinning technologies in Shanghai. Tunn Undergr Space Technol 45:20–33CrossRef
go back to reference Xu X, Li Z, Fang Q, Zheng H (2020) Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station. Tunn Undergr Space Technol 98:103326CrossRef Xu X, Li Z, Fang Q, Zheng H (2020) Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station. Tunn Undergr Space Technol 98:103326CrossRef
go back to reference Zhang M, Li S, Li P (2020) Numerical analysis of ground displacement and segmental stress and influence of yaw excavation loadings for a curved shield tunnel. Comput Geotech 118:103325CrossRef Zhang M, Li S, Li P (2020) Numerical analysis of ground displacement and segmental stress and influence of yaw excavation loadings for a curved shield tunnel. Comput Geotech 118:103325CrossRef
Metadata
Title
Analysis of Construction Impact of a Large Diameter Shield Tunneling Side-Crossing Viaduct Pile Foundations in Short Distance
Authors
Jian Wang
Zhifang Wen
Publication date
16-05-2021
Publisher
Springer International Publishing
Published in
Geotechnical and Geological Engineering / Issue 8/2021
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-021-01846-4

Other articles of this Issue 8/2021

Geotechnical and Geological Engineering 8/2021 Go to the issue