Skip to main content
Top

2023 | OriginalPaper | Chapter

Application of Work Measurement to Reduce the Cycle Time in Manufacturing Firm: A Case Study

Authors : Tejaswini Sapkal, Hari Vasudevan, Rajendra Khavekar

Published in: Proceedings of International Conference on Intelligent Manufacturing and Automation

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

One of the factors affecting the productivity of any manufacturing firm is the Cycle time. Lesser the cycle time required, the more production is obtained. Motion and time study techniques are used as productivity improvement techniques in many manufacturing firms. This case study was conducted in a manufacturing firm, situated at Satara, western India, which is engaged in the manufacturing of machines used for construction work. In this study, an attempt was made to reduce the assembly time of crusher machine, using time and motion study. After conducting this study, assembly time was reduced by 9 m, i.e., 10.71% reduction in cycle time was achieved. Work measurement also helped in proper planning of various tasks and scheduling, in order to reduce the indirect costs like electricity bill and rent, etc.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Singh J, Brar GS (2017) Process improvement and setup time reduction in manufacturing industry: a case study. IJAMR 9(1):15–23 Singh J, Brar GS (2017) Process improvement and setup time reduction in manufacturing industry: a case study. IJAMR 9(1):15–23
2.
go back to reference Gujar S, Moroliya M (2018) Increasing productivity by using work study in a manufacturing industry: literature review. IJMPERD 8(2):369–374 Gujar S, Moroliya M (2018) Increasing productivity by using work study in a manufacturing industry: literature review. IJMPERD 8(2):369–374
3.
go back to reference Singh MP, Yadav H (2016) Improvement in process industries by using work study methods: a case study, Vol 7, Issue 3, pp 426–436 Singh MP, Yadav H (2016) Improvement in process industries by using work study methods: a case study, Vol 7, Issue 3, pp 426–436
4.
go back to reference Desai MS, Warkhedkar RM (2011) Productivity enhancement by reducing adjustment time and setup change. Int J Mech Eng Ind Eng 1(1):37–42 Desai MS, Warkhedkar RM (2011) Productivity enhancement by reducing adjustment time and setup change. Int J Mech Eng Ind Eng 1(1):37–42
5.
go back to reference Kulkarni VN, Darshan KR, Kulkarni P, Singh P (2014) Productivity improvement using work study techniques at assembly work station. Int J Soc Sci Manage 3(2):149–153 Kulkarni VN, Darshan KR, Kulkarni P, Singh P (2014) Productivity improvement using work study techniques at assembly work station. Int J Soc Sci Manage 3(2):149–153
6.
go back to reference Yusoff N, Jaffer A, Abbas MN, Saad NH (2012) Work measurement for process improvement in the car seat polyurethane injection manfacturing line. Proc Eng 41:1800–1805 Yusoff N, Jaffer A, Abbas MN, Saad NH (2012) Work measurement for process improvement in the car seat polyurethane injection manfacturing line. Proc Eng 41:1800–1805
7.
go back to reference Sai Nishanth Reddy A, Srinath Rao P, Rajalakshmi G (2016) Productivity improvement using time study analysis in a small scale solar appliances industry—a case study. ARPN J Eng Appl Sci 11(1):666–674 Sai Nishanth Reddy A, Srinath Rao P, Rajalakshmi G (2016) Productivity improvement using time study analysis in a small scale solar appliances industry—a case study. ARPN J Eng Appl Sci 11(1):666–674
8.
go back to reference Wilson JM (2003) Gantt charts: a centenary appreciation. Europ J Oper Res 149(2):430–437 Wilson JM (2003) Gantt charts: a centenary appreciation. Europ J Oper Res 149(2):430–437
9.
go back to reference Duran C, Cetindere A, Aksu YE (2015) Productivity improvement by work and time study technique for earth energy-glass manufacturing company. Proc Econom Fin 26:109–113 Duran C, Cetindere A, Aksu YE (2015) Productivity improvement by work and time study technique for earth energy-glass manufacturing company. Proc Econom Fin 26:109–113
Metadata
Title
Application of Work Measurement to Reduce the Cycle Time in Manufacturing Firm: A Case Study
Authors
Tejaswini Sapkal
Hari Vasudevan
Rajendra Khavekar
Copyright Year
2023
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-7971-2_7

Premium Partner