Skip to main content
Top

Critical barriers to the introduction of shore power supply for green port development: case of Djibouti container terminals

  • 18-05-2019
  • Original Paper
Published in:

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Greenhouse gas emissions and air pollutants from ships contribute to climate change and poor local air quality. While at berth, the use of shore-side electricity as an alternative technique to generate electricity to ships can greatly reduce emissions and improve air quality. The container terminals of Djibouti accommodate a significant number of ship calls, but there is a lack of emissions mitigation measures. The purpose of this study is to identify the most critical barriers that hinder the deployment of shore power supply in the container terminals of Djibouti. To achieve this aim, this study consults professional experts and experienced managers working in the maritime industry. The data collection is based on a survey questionnaire collected in the form of linguistic preferences to handle fuzziness of human perceptions. The collected linguistic preferences are later converted into quantitative data and analyzed using fuzzy cognitive map approach. The results reveal that power requirement, investment cost and electricity cost are the key barriers that currently influence the implementation of the shore power technology in Djibouti. The findings of the study have great implications and are hoped to assist decision makers and port authority in prioritizing the different barriers according to their importance, in an effort to accelerate the introduction and the development of green port strategies.

Graphical abstract

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Business + Economics & Engineering + Technology"

Online-Abonnement

Springer Professional "Business + Economics & Engineering + Technology" gives you access to:

  • more than 130.000 books
  • more than 540 journals

from the following subject areas:

  • Automotive
  • Construction + Real Estate
  • Business IT + Informatics
  • Electrical Engineering + Electronics
  • Energy + Sustainability
  • Finance + Banking
  • Management + Leadership
  • Marketing + Sales
  • Mechanical Engineering + Materials
  • Surfaces + Materials Technology
  • Insurance + Risk


Secure your knowledge advantage now!

Springer Professional "Engineering + Technology"

Online-Abonnement

Springer Professional "Engineering + Technology" gives you access to:

  • more than 75.000 books
  • more than 390 journals

from the following specialised fileds:

  • Automotive
  • Business IT + Informatics
  • Construction + Real Estate
  • Electrical Engineering + Electronics
  • Energy + Sustainability
  • Mechanical Engineering + Materials
  • Surfaces + Materials Technology





 

Secure your knowledge advantage now!

Title
Critical barriers to the introduction of shore power supply for green port development: case of Djibouti container terminals
Authors
Mohamed Elmi Radwan
Jihong Chen
Zheng Wan
Tianxiao Zheng
Chengying Hua
Xiaoling Huang
Publication date
18-05-2019
Publisher
Springer Berlin Heidelberg
Published in
Clean Technologies and Environmental Policy / Issue 6/2019
Print ISSN: 1618-954X
Electronic ISSN: 1618-9558
DOI
https://doi.org/10.1007/s10098-019-01706-z
This content is only visible if you are logged in and have the appropriate permissions.
Image Credits
Korero Solutions/© Korero Solutions