Skip to main content
main-content
Top

Hint

Swipe to navigate through the articles of this issue

Published in: WASSERWIRTSCHAFT 6/2016

01-06-2016 | Wasserbau

Deformation Behavior of Sanibey Dam Concrete Slab Joints

Authors: Faruk Çetin, Uğur Akpınar

Published in: WASSERWIRTSCHAFT | Issue 6/2016

Login to get access
share
SHARE

Excerpt

The 130.0 m high Sanibey Dam is located on Seyhan River in the southern part of Turkey. Construction of CFRD, concrete faced rockfill dam, was completed at the beginning of 2010 and full reservoir level was reached in 2011. The goal of this study is to present the prediction of joint movements to be expected during impounding, based on the observed settlements as monitored during construction for Sanibey Dam. For this purpose, first, the actual construction stages are modeled in finite element model according to the real construction schedule and then, material properties are obtained from back analysis of construction stage. Finally, instrumentation readings of impounding stage are compared with calculated joint displacement values and discussed. …
Literature
[1]
go back to reference Design of Concrete Face Rockfill Dams. In: SymposFitzpatrick, M. D.; Cole, B. A.; Kinstler, F. L.; Knoop, B. P.ium on Concrete Face Rockfill Dams — Design, Construction, and Performance, Proceedings of the Geotechnical Division of the American Society of Civil Engineers (1985), S. 410–434. Design of Concrete Face Rockfill Dams. In: SymposFitzpatrick, M. D.; Cole, B. A.; Kinstler, F. L.; Knoop, B. P.ium on Concrete Face Rockfill Dams — Design, Construction, and Performance, Proceedings of the Geotechnical Division of the American Society of Civil Engineers (1985), S. 410–434.
Metadata
Title
Deformation Behavior of Sanibey Dam Concrete Slab Joints
Authors
Faruk Çetin
Uğur Akpınar
Publication date
01-06-2016
Publisher
Springer Fachmedien Wiesbaden
Published in
WASSERWIRTSCHAFT / Issue 6/2016
Print ISSN: 0043-0978
Electronic ISSN: 2192-8762
DOI
https://doi.org/10.1007/s35147-016-0094-9