Skip to main content
Top

2019 | OriginalPaper | Chapter

5. Delay-Time Models for Multi-unit Technical Systems Working in Various Reliability Structures

Author : Sylwia Werbińska-Wojciechowska

Published in: Technical System Maintenance

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The objective of this Chapter is to present delay-time based maintenance models for multi-unit systems performing in various reliability structures (series, parallel, nk-out-of-n types) for the two cases of perfect and imperfect inspection performance. First, the necessity of the DT modelling for multi-unit systems performing in various reliability structures is discussed. The research gap is underlined and structure of the Chapter is presented. Moreover, preliminary simulation DT models are characterized. They focus on availability and maintenance costs of technical systems performing in series and non-series structures with perfect and imperfect inspection. Their sensitivity analysis is carried out and main results are discussed. Moreover, first decision rules for maintenance managers are specified. Later, the short overview of recent developments on delay-time based maintenance modelling for systems in non-series reliability structures is presented and structure for the next Sections is given. In Sect. 5.2 new analytical delay-time maintenance models are developed. The implemented maintenance policy bases on Block Inspection policy implementation and the analytical model is presented for the perfect inspection case. The solution is based on renewal reward theory use and is given for the first inspection cycle. The main decision variable is the time period between successive system inspection actions performance Tin, while the purpose of the developed model is to estimate the expected maintenance cost per unit of system time. As a result, the main assumptions for the DT models are defined. This gives the possibility to obtain the main reliability functions for the modelled system performing in various reliability structures. Later, the expected maintenance cost model is introduced. Section 5.3 provides the reader with extended delay-time maintenance models for systems performing in two reliability structures—series and parallel ones. The analysed system is a two-component system (including component A and component B). The main assumptions are defined and compatible with the ones determined in Sect. 5.2. The main difference is connected with the possibility of planned and unplanned inspection actions performance during the time interval (0, Tin). First, the number of event scenarios is presented and analysed. Later, the probability functions of system failure and preventive replacement are presented. This gives the possibility to obtain the expected maintenance cost model. In the next Sections the author discusses and analyses the possibilities of use of the obtained simple delay-time based maintenance models for determining the best inspection time interval. First, the convergence of the chosen analytical model with the simulation model is given. Later, the optimization modelling issues are discussed and the new cost coefficient is proposed. The Chapter is completed by concluding remarks that contain the most important conclusions obtained from the performed research developments.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Footnotes
1
www.​gnu.​org/​software/​octave/​ (available June 13th, 2017).
 
2
Defect in the system elements—defined as the occurrence of symptoms of a potential future failure.
 
Literature
2.
go back to reference Blischke WR, Prabhakar Murthy DN (2000) Reliability: modelling, prediction and optimization. Willey, New YorkCrossRef Blischke WR, Prabhakar Murthy DN (2000) Reliability: modelling, prediction and optimization. Willey, New YorkCrossRef
5.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2018) Delay-time based inspection model with imperfect inspection for technical system. In: Proceedings of the XLVI winter school on reliability 2018, Szczyrk, 7–13 Jan 2018, Poland, 1–26 Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2018) Delay-time based inspection model with imperfect inspection for technical system. In: Proceedings of the XLVI winter school on reliability 2018, Szczyrk, 7–13 Jan 2018, Poland, 1–26
6.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2016) Influence of data uncertainty on the optimum inspection period in a multi-unit system maintained according to the block inspection policy. In: Dependability engineering and complex systems: proceedings of the eleventh international conference on dependability and complex systems DepCoS-RELCOMEX, June 27–July 1, 2016, Brunów, Poland: Springer International Publishing, 239–256 Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2016) Influence of data uncertainty on the optimum inspection period in a multi-unit system maintained according to the block inspection policy. In: Dependability engineering and complex systems: proceedings of the eleventh international conference on dependability and complex systems DepCoS-RELCOMEX, June 27–July 1, 2016, Brunów, Poland: Springer International Publishing, 239–256
7.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2015) Availability model of technical objects—block inspection policy implementation. In: Safety and reliability: methodology and applications: proceedings of the European safety and reliability conference, ESREL 2014, Wroclaw, Poland, 14–18 Sept 2014. CRC Press/Balkema, Leiden, 1275–1280CrossRef Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2015) Availability model of technical objects—block inspection policy implementation. In: Safety and reliability: methodology and applications: proceedings of the European safety and reliability conference, ESREL 2014, Wroclaw, Poland, 14–18 Sept 2014. CRC Press/Balkema, Leiden, 1275–1280CrossRef
8.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2015b) A guide for Block Inspection Policy implementation. In: Safety and reliability: methodology and applications: proc. of the European safety and reliability conference, ESREL 2014, Wrocław, Poland, 14–18 Sept 2014. CRC Press/Balkema, Leiden, 1263–1273CrossRef Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2015b) A guide for Block Inspection Policy implementation. In: Safety and reliability: methodology and applications: proc. of the European safety and reliability conference, ESREL 2014, Wrocław, Poland, 14–18 Sept 2014. CRC Press/Balkema, Leiden, 1263–1273CrossRef
10.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014) Analysis of maintenance models’ parameters estimation for technical systems with delay time. Eksploat Niezawod (Maint Reliab) 16(2):288–294 Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014) Analysis of maintenance models’ parameters estimation for technical systems with delay time. Eksploat Niezawod (Maint Reliab) 16(2):288–294
11.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014b) Block inspection policy for non-series technical objects. In: Safety, reliability and risk analysis: beyond the horizon: proceedings of the European safety and reliability conference, ESREL 2013, Amsterdam, The Netherlands, 29 Sept–2 Oct 2013. CRC Press/Balkema, Leiden, 889–898CrossRef Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014b) Block inspection policy for non-series technical objects. In: Safety, reliability and risk analysis: beyond the horizon: proceedings of the European safety and reliability conference, ESREL 2013, Amsterdam, The Netherlands, 29 Sept–2 Oct 2013. CRC Press/Balkema, Leiden, 889–898CrossRef
12.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014) Model of expected maintenance costs for multi-unit technical objects with time delay. In: Siergiejczyk M (ed) Maintenance problems of technical systems (in Polish). Warsaw University of Technology Publish, House, Warsaw, pp 79–92 Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2014) Model of expected maintenance costs for multi-unit technical objects with time delay. In: Siergiejczyk M (ed) Maintenance problems of technical systems (in Polish). Warsaw University of Technology Publish, House, Warsaw, pp 79–92
13.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2012) A delay-time model with imperfect inspections for multi-unit systems. J Konbin 3(23):157–172CrossRef Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2012) A delay-time model with imperfect inspections for multi-unit systems. J Konbin 3(23):157–172CrossRef
14.
go back to reference Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2012b) Economical effectiveness of delay time approach using in time-based maintenance modelling. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, 1–10 Jodejko-Pietruczuk A, Werbińska-Wojciechowska S (2012b) Economical effectiveness of delay time approach using in time-based maintenance modelling. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, 1–10
15.
go back to reference Jodejko-Pietruczuk A. Werbińska-Wojciechowska S (2012c) Analysis of Block-Inspection Policy parameters from economical and availability point of view. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, 1–10 Jodejko-Pietruczuk A. Werbińska-Wojciechowska S (2012c) Analysis of Block-Inspection Policy parameters from economical and availability point of view. In: Proceedings of 11th international probabilistic safety assessment and management conference & the annual European safety and reliability conference, PSAM 11 & ESREL 2012, Helsinki, Finland, 25–29 June 2012, 1–10
16.
go back to reference Liu X, Wang W, Peng R (2015) An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploat Niezawod (Maint Reliab) 17(2):215–221CrossRef Liu X, Wang W, Peng R (2015) An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploat Niezawod (Maint Reliab) 17(2):215–221CrossRef
17.
go back to reference Marsaro MF, Cavalcante CAV (2017) Random preventive maintenance policy based on inspection for a multicomponent system using simulation. Eksploat Niezawod (Maint Reliab) 19(4):552–559CrossRef Marsaro MF, Cavalcante CAV (2017) Random preventive maintenance policy based on inspection for a multicomponent system using simulation. Eksploat Niezawod (Maint Reliab) 19(4):552–559CrossRef
18.
19.
go back to reference Nicolai RP Dekker R (2007) A review of multi-component maintenance models. In: Aven T, Vinnem JM (eds) Risk, reliability and societal safety—proceedings of European safety and reliability conference ESREL 2007, Stavanger, Norway, 25–27 June 2007. Taylor and Francis, Leiden, 289–296 Nicolai RP Dekker R (2007) A review of multi-component maintenance models. In: Aven T, Vinnem JM (eds) Risk, reliability and societal safety—proceedings of European safety and reliability conference ESREL 2007, Stavanger, Norway, 25–27 June 2007. Taylor and Francis, Leiden, 289–296
20.
go back to reference Nicolai RP, Dekker R (2006) Optimal maintenance of multicomponent systems: a review. Economic Institute Report Nicolai RP, Dekker R (2006) Optimal maintenance of multicomponent systems: a review. Economic Institute Report
22.
go back to reference Wang W, Liu X, Peng R, Guo L (2013) A delay-time-based inspection model for a two-component parallel system. In: Proceedings of 2013 international conference on quality, reliability, risk, maintenance, and safety engineering, (QR2MSE), 15–18 July 2013, Chengdu, China Wang W, Liu X, Peng R, Guo L (2013) A delay-time-based inspection model for a two-component parallel system. In: Proceedings of 2013 international conference on quality, reliability, risk, maintenance, and safety engineering, (QR2MSE), 15–18 July 2013, Chengdu, China
24.
go back to reference Yuchomboom Y, Thepmanee T (2016) Inspection maintenance improvement for reducing common cause failures of k-out-of-n configurations: a case study of power plant. In: Proceedings of the 2016 IEEE/SICE international symposium on system integration, Sapporo Convention Center, Dec 13–15, 2016, Sapporo, Japan, 81–86 Yuchomboom Y, Thepmanee T (2016) Inspection maintenance improvement for reducing common cause failures of k-out-of-n configurations: a case study of power plant. In: Proceedings of the 2016 IEEE/SICE international symposium on system integration, Sapporo Convention Center, Dec 13–15, 2016, Sapporo, Japan, 81–86
Metadata
Title
Delay-Time Models for Multi-unit Technical Systems Working in Various Reliability Structures
Author
Sylwia Werbińska-Wojciechowska
Copyright Year
2019
DOI
https://doi.org/10.1007/978-3-030-10788-8_5