2020 | OriginalPaper | Chapter

21. Development and Analysis of a Discrete Particle Swarm Optimisation for Bi-criteria Scheduling of a Flow Shop with Sequence-Dependent Setup Time

Authors : V. Anjana, R. Sridharan, P. N. Ram Kumar

Published in: Advances in Simulation, Product Design and Development

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Most studies in flow shop scheduling neglect the setup times or consider the setup times along with the processing times. However, in industries that manufacture paint, textiles, ceramic tiles, etc., the setup times are significant and are sequence dependent. This paper addresses the problem of scheduling a flow shop operating in a sequence-dependent setup time (SDST) environment considering the objectives, namely minimisation of makespan and mean tardiness. The evolutionary method of discrete particle swarm optimisation (DPSO) based on weighted approach is developed and applied to SDST benchmark problems of flow shop scheduling. The efficacy of the metaheuristic is compared with that of a hybrid genetic algorithm, and it is observed that on an average, the proposed DPSO provides an improvement of 7.8, 22.3 and 11.3% in the values of mean ideal distance, computational time and diversification matrix, respectively. For most problems, the proposed DPSO performs superior to the hybrid genetic algorithm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Ruiz, R., Maroto, C., Alcaraz, J.: Solving the flow shop scheduling problem with sequence dependent setup times using advanced metaheuristic. Eur. J. Oper. Res. 165(1), 34–54 (2005)CrossRef Ruiz, R., Maroto, C., Alcaraz, J.: Solving the flow shop scheduling problem with sequence dependent setup times using advanced metaheuristic. Eur. J. Oper. Res. 165(1), 34–54 (2005)CrossRef
2.
go back to reference Ciavotta, M., Minella, G., Ruiz, R.: Multi-objective sequence dependent setup times permutation flow shop: a new algorithm and comprehensive study. Eur. J. Oper. Res. 227(2), 301–313 (2013)CrossRef Ciavotta, M., Minella, G., Ruiz, R.: Multi-objective sequence dependent setup times permutation flow shop: a new algorithm and comprehensive study. Eur. J. Oper. Res. 227(2), 301–313 (2013)CrossRef
3.
go back to reference Vanchipura, R., Sridharan, R.: Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence dependent setup times. Int. J. Adv. Manuf. Technol. 67(5), 1337–1353 (2013)CrossRef Vanchipura, R., Sridharan, R.: Development and analysis of constructive heuristic algorithms for flow shop scheduling problems with sequence dependent setup times. Int. J. Adv. Manuf. Technol. 67(5), 1337–1353 (2013)CrossRef
4.
go back to reference Roger, Z., Mercado, R., Bard, J.: Computational experience with a branch and cut algorithm for flow shop scheduling with setups. Comput. Oper. Res. 25(5), 351–366 (1998)CrossRef Roger, Z., Mercado, R., Bard, J.: Computational experience with a branch and cut algorithm for flow shop scheduling with setups. Comput. Oper. Res. 25(5), 351–366 (1998)CrossRef
5.
go back to reference Roger, Z., Mercado, R., Bard, J.: A branch and bound algorithm for permutation flow shops with sequence dependent setup times. IIE Trans. 31, 721–731 (1999) Roger, Z., Mercado, R., Bard, J.: A branch and bound algorithm for permutation flow shops with sequence dependent setup times. IIE Trans. 31, 721–731 (1999)
6.
go back to reference Deb, K.: Multi-objective Optimisation Using Evolutionary Algorithms, Student ed. Wiley, Hoboken (2005) Deb, K.: Multi-objective Optimisation Using Evolutionary Algorithms, Student ed. Wiley, Hoboken (2005)
7.
go back to reference Rajendran, C., Ziegler, H.: Scheduling to minimise the sum of weighted flow time and weighted tardiness of jobs in a flow shop with sequence dependent setup time. Eur. J. Oper. Res. 149(3), 513–522 (2003)CrossRef Rajendran, C., Ziegler, H.: Scheduling to minimise the sum of weighted flow time and weighted tardiness of jobs in a flow shop with sequence dependent setup time. Eur. J. Oper. Res. 149(3), 513–522 (2003)CrossRef
8.
go back to reference Eren, T., Guner, E.: A bi-criteria scheduling with sequence dependent setup time. Appl. Math. Comput. 179(1), 378–385 (2006)MathSciNetMATH Eren, T., Guner, E.: A bi-criteria scheduling with sequence dependent setup time. Appl. Math. Comput. 179(1), 378–385 (2006)MathSciNetMATH
9.
go back to reference Eren, T.: A multi-criteria flow shop scheduling problem with setup times. J. Mater. Process. Technol. 186(1–3), 60–65 (2007)CrossRef Eren, T.: A multi-criteria flow shop scheduling problem with setup times. J. Mater. Process. Technol. 186(1–3), 60–65 (2007)CrossRef
10.
go back to reference Dhingra, A., Chandna, P.: A bi-criteria m-machine sequence dependent setup time flow shop using modified heuristic genetic algorithm. Int. J. Eng. Sci. Technol. 2(5), 216–225 (2010)CrossRef Dhingra, A., Chandna, P.: A bi-criteria m-machine sequence dependent setup time flow shop using modified heuristic genetic algorithm. Int. J. Eng. Sci. Technol. 2(5), 216–225 (2010)CrossRef
11.
go back to reference Kennedy, J., Eberhart, R.C.: Particle swarm optimization. In: Proceedings of IEEE International Conference on Neural Networks, pp. 1942–1948. Piscataway, NJ (1995) Kennedy, J., Eberhart, R.C.: Particle swarm optimization. In: Proceedings of IEEE International Conference on Neural Networks, pp. 1942–1948. Piscataway, NJ (1995)
12.
go back to reference Kennedy, J., Eberhart, R.C.: A discrete binary version of the particle swarm algorithm. IEEE 4104–4108 Kennedy, J., Eberhart, R.C.: A discrete binary version of the particle swarm algorithm. IEEE 4104–4108
13.
go back to reference Pan, Q., Tasgetiren, F., Liang, Y.C.: A discrete particle swarm optimisation algorithm for no-wait flow shop scheduling problem. Eur. J. Oper. Res. 35(9), 2807–2839 (2008)MATH Pan, Q., Tasgetiren, F., Liang, Y.C.: A discrete particle swarm optimisation algorithm for no-wait flow shop scheduling problem. Eur. J. Oper. Res. 35(9), 2807–2839 (2008)MATH
14.
go back to reference Enscore Jr., E., Ham, I., Nawaz, M.: A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. Omega Int. J. Manage. Sci. 11(1), 91–97 (1983)CrossRef Enscore Jr., E., Ham, I., Nawaz, M.: A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. Omega Int. J. Manage. Sci. 11(1), 91–97 (1983)CrossRef
15.
go back to reference Ross, P.J.: Taguchi Techniques for Quality Engineering, 2nd ed. McGraw Hill International Editions (1996) Ross, P.J.: Taguchi Techniques for Quality Engineering, 2nd ed. McGraw Hill International Editions (1996)
16.
go back to reference Kaladhar, M., Subbaiah, K.V., Rao, S., Rao, K.N.: Application of Taguchi approach and utility concept in solving the multi-objective problem when turning AISI 202 Austenitic Stainless Steel. J. Eng. Sci. Technol. Rev. 4(1), 55–61 (2011)CrossRef Kaladhar, M., Subbaiah, K.V., Rao, S., Rao, K.N.: Application of Taguchi approach and utility concept in solving the multi-objective problem when turning AISI 202 Austenitic Stainless Steel. J. Eng. Sci. Technol. Rev. 4(1), 55–61 (2011)CrossRef
Metadata
Title
Development and Analysis of a Discrete Particle Swarm Optimisation for Bi-criteria Scheduling of a Flow Shop with Sequence-Dependent Setup Time
Authors
V. Anjana
R. Sridharan
P. N. Ram Kumar
Copyright Year
2020
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-32-9487-5_21

Premium Partners