Dominant Success Factors of Managing Subcontractors by Main Contractors in Sustainable Development Project

Authors : Bambang Endro Yuwono, Yuhana, Raflis

Published in: ICCOEE2020

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Challenges faced by businesses, including a construction service sector, are involved. The complexity in a construction business stimulates construction project practitioners to cooperate and apply POAC (Planning, Organizing, Actuating, Controlling) management function well. However, there always problems during the construction process, like problems between contractor-subcontractor. A contractor plays roles as one who executes the plan, and a subcontractor works under the contactor's commands—the contractor-subcontractor relationship based on a legal contract. There is no research on the problems conducted on the base of POAC management perspectives yet. The samples of this research are contractor-subcontractor who was working on a skyscraper project in Jakarta. The research instrument conducted four dependent variables and 40 independent variables. Data analyzed with confirmatory factor analysis in 2 stages; each stage results in dominant numbers derived from the respondents' perception. The research finds that the most commonly occurring problem between them is actuating

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Wong, F., So, L.: Restriction of the multi-layers subcontracting practice in Hong Kong – is it an effective tool to improve safety performance of the construction industry (2001) Wong, F., So, L.: Restriction of the multi-layers subcontracting practice in Hong Kong – is it an effective tool to improve safety performance of the construction industry (2001)
2.
go back to reference Hoła, B., Sawicki, M.: Knowledge assets about construction enterprise collected in the knowledge map, Technical Transactions. Krakow (2014) Hoła, B., Sawicki, M.: Knowledge assets about construction enterprise collected in the knowledge map, Technical Transactions. Krakow (2014)
3.
go back to reference Huang, R.Y., Huang, C.T., Lin, H., Ku, W.H.: Factor analysis of interface problems among construction parties a case study of MRT. J. Marine (2008) Huang, R.Y., Huang, C.T., Lin, H., Ku, W.H.: Factor analysis of interface problems among construction parties a case study of MRT. J. Marine (2008)
4.
go back to reference Sahadi, M., Agung, W.: Faktor-faktor berpengaruh terhadap kinerja manajer proyek konstruksi dengan Structural Equation Modeling. J. Media Komunikasi Teknik Sipil (2009) Sahadi, M., Agung, W.: Faktor-faktor berpengaruh terhadap kinerja manajer proyek konstruksi dengan Structural Equation Modeling. J. Media Komunikasi Teknik Sipil (2009)
5.
go back to reference Bernathius, J.: Instrumen Pengukuran Kinerja Inovasi Perusahaan Kontraktor di Indonesia.Jurnal Media Komunikasi Teknik Sipil (2014) Bernathius, J.: Instrumen Pengukuran Kinerja Inovasi Perusahaan Kontraktor di Indonesia.Jurnal Media Komunikasi Teknik Sipil (2014)
6.
go back to reference Fauziyah, S., Wibowo, M.: Analisis Perbandingan Kontrak Tradisional dan Kontrak Berbasis Kinerja (KBK) Berdasarkan Risiko Persepsi Kontraktor dengan Metode. Analytical Hierarchy Process (AHP). Jurnal Media Komunikasi Teknik Sipil (2016) Fauziyah, S., Wibowo, M.: Analisis Perbandingan Kontrak Tradisional dan Kontrak Berbasis Kinerja (KBK) Berdasarkan Risiko Persepsi Kontraktor dengan Metode. Analytical Hierarchy Process (AHP). Jurnal Media Komunikasi Teknik Sipil (2016)
7.
go back to reference Simanjuntak, M.R.A., Widjajakusuma, J., Tantri, N.: Analisis Faktor yang Mempengaruhi Keputusan Kontraktor dalam Pemilihan Kontraktor Spesialis terhadap Peningkatan Kinerja Procurement pada Proyek Jalan Lokal di Kalimantan Timur. Konferensi Nasional Teknik Sipil 3 (2009) Simanjuntak, M.R.A., Widjajakusuma, J., Tantri, N.: Analisis Faktor yang Mempengaruhi Keputusan Kontraktor dalam Pemilihan Kontraktor Spesialis terhadap Peningkatan Kinerja Procurement pada Proyek Jalan Lokal di Kalimantan Timur. Konferensi Nasional Teknik Sipil 3 (2009)
8.
go back to reference Messah, Y., Pono, R.., Krisnayanti, S.: Kajian Kriteria Pemilihan Subkontraktor oleh Kontaktor Utama Menggunakan Metode Analytic Hierarchy Process (AHP) (2012) Messah, Y., Pono, R.., Krisnayanti, S.: Kajian Kriteria Pemilihan Subkontraktor oleh Kontaktor Utama Menggunakan Metode Analytic Hierarchy Process (AHP) (2012)
9.
go back to reference Henrico, Soekiman, A.; Analsis Perilaku Kontraktor Utama dalam Melakukan Subkontraktor Konstruksi Bangunan Gedung di Indonesia. Jurnal Kontruksia (2013) Henrico, Soekiman, A.; Analsis Perilaku Kontraktor Utama dalam Melakukan Subkontraktor Konstruksi Bangunan Gedung di Indonesia. Jurnal Kontruksia (2013)
10.
go back to reference Yonas, E.V.: Resiko Pekerjaan Subkontraktor pada Proyek Kosntruksi di Kota Bandung ditinjau dari Sisi Sub Kontraktor. Universitas Katolik Parahyangan, Skripsi (2018) Yonas, E.V.: Resiko Pekerjaan Subkontraktor pada Proyek Kosntruksi di Kota Bandung ditinjau dari Sisi Sub Kontraktor. Universitas Katolik Parahyangan, Skripsi (2018)
11.
go back to reference Aanval, Y., Noer, B.A.: Critical Factors of Success of Work Relationship between Main Contractor and Subcontractor in X Ltd. Steel Fabrication Company. IOSR Journal of Engineering (IOSRJEN) 08(7), 21–27 (2018) Aanval, Y., Noer, B.A.: Critical Factors of Success of Work Relationship between Main Contractor and Subcontractor in X Ltd. Steel Fabrication Company. IOSR Journal of Engineering (IOSRJEN) 08(7), 21–27 (2018)
12.
go back to reference Lendra and Andri: Tingkat Kepercayaan Dalam Hubungan Kemitraan antara Kontraktor dan Subkontraktor di Surabaya (2006) Lendra and Andri: Tingkat Kepercayaan Dalam Hubungan Kemitraan antara Kontraktor dan Subkontraktor di Surabaya (2006)
13.
go back to reference Nugroho, R.H., Reini, W.: Kajian hubungan kontraktual antara kontraktor utama dengan subkontraktor pada proyek konstruksi (2010) Nugroho, R.H., Reini, W.: Kajian hubungan kontraktual antara kontraktor utama dengan subkontraktor pada proyek konstruksi (2010)
14.
go back to reference Girsang, D.S., Yohanes, L., Adianto, D., Andreas, W.: Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek-Proyek Pemerintahan (2009) Girsang, D.S., Yohanes, L., Adianto, D., Andreas, W.: Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek-Proyek Pemerintahan (2009)
15.
go back to reference Budiman, P.: Keterlambatan Waktu Pelaksanaan Proyek (1999) Budiman, P.: Keterlambatan Waktu Pelaksanaan Proyek (1999)
16.
go back to reference Rohi, D.R.P.: Kajian Kriteria Pemilihan Subkontraktor oleh Kontraktor Utama dengan Menggunakan Metode Analytic Hyerarchy Process (AHP) (2013) Rohi, D.R.P.: Kajian Kriteria Pemilihan Subkontraktor oleh Kontraktor Utama dengan Menggunakan Metode Analytic Hyerarchy Process (AHP) (2013)
17.
go back to reference Rahman, S.H.: The importance of collaboration in construction industry from contractors’ perspectives. In: International Conference on Innovation, Management and Technology Research, Malaysia, 22–23 September 2013 (2013) Rahman, S.H.: The importance of collaboration in construction industry from contractors’ perspectives. In: International Conference on Innovation, Management and Technology Research, Malaysia, 22–23 September 2013 (2013)
18.
go back to reference Othman, M.R.: Forging Main and Subcontractor Relationship for Successful Projects (2012) Othman, M.R.: Forging Main and Subcontractor Relationship for Successful Projects (2012)
19.
go back to reference Mbachu, J.: Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry. Construct. Manage. Econ. 26, 471–484 (2008)CrossRef Mbachu, J.: Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry. Construct. Manage. Econ. 26, 471–484 (2008)CrossRef
Metadata
Title
Dominant Success Factors of Managing Subcontractors by Main Contractors in Sustainable Development Project
Authors
Bambang Endro Yuwono
Yuhana
Raflis
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-33-6311-3_65