Skip to main content
Top
Published in: Geotechnical and Geological Engineering 3/2021

12-10-2020 | Original Paper

Dynamic Stability Evaluation of Underground Powerhouse Cavern Using Microseismic Monitoring

Authors: Vikalp Kumar, Prakash Chandra Jha, Nagendra Pratap Singh, Sivakumar Cherukuri

Published in: Geotechnical and Geological Engineering | Issue 3/2021

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Construction of any excavation adds to the re-distribution of stresses around abutment and crown. This is stabilised by providing extra reinforcement. When a large underground cavern is excavated, stress re-distribution around abutment is obvious. Underground powerhouse cavern of Tala Hydropower Plant with adverse geological setting is one such cavern which encountered failure of a number of rock-bolts and series of other types of rockmass failure during its construction. It puts a question mark on the long-term stability of this powerhouse. To evaluate the dynamic stability of the rockmass (against induced stresses) around this powerhouse, microseismic monitoring network was installed. Microseismic data has been analysed in terms of static and dynamic parameters to assess the overall cavern stability. Spatio-temporal analysis of microseismic events could identify the potential risk zones which has significant cluster of events. To assess the overall stability due to these induced events, the ratio of transverse wave and longitudinal wave energy of these events was used as an index. It is found that cluster of events had shear failure. These events are basically of small non-damaging type and aid in releasing the built-up induced stresses. The slope of log–log plot of energy versus moment has a very high value. This indicates a stiffer rockmass which adds to its capability to absorb the induced stresses and aid to the overall stability of the region. Analysis reveals that no major seismic events are expected around this rockmass cavern and there is no dynamically unstable region against induced stresses.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Behra PK (1989) Ultradeep mining problems in Kolar gold mines. In: Fourmaintraux M (ed) Rock at greath depth. Balkema, Rotterdam, pp 687–694 Behra PK (1989) Ultradeep mining problems in Kolar gold mines. In: Fourmaintraux M (ed) Rock at greath depth. Balkema, Rotterdam, pp 687–694
go back to reference Bhasin R, Pabst T (2014) Case study of a large underground cavern in the Himalayas. J Rock Mech Tunnel Technol 20:5–20 Bhasin R, Pabst T (2014) Case study of a large underground cavern in the Himalayas. J Rock Mech Tunnel Technol 20:5–20
go back to reference Bhasin R, Pabst T, Olsson R (2013) Numerical study of the stability of a large hydropower machine hall in the Himalyas under dynamic loading. In: Second nordic rock mechanics symposium, pp 81–91 Bhasin R, Pabst T, Olsson R (2013) Numerical study of the stability of a large hydropower machine hall in the Himalyas under dynamic loading. In: Second nordic rock mechanics symposium, pp 81–91
go back to reference BIS (1983) Explanatory handbook on codes for earthquake engineering (IS: 1893-1975 and IS: 4326-1976). Bureau of Indian Standards, New Delhi BIS (1983) Explanatory handbook on codes for earthquake engineering (IS: 1893-1975 and IS: 4326-1976). Bureau of Indian Standards, New Delhi
go back to reference Bland H, Stewart R, Chen Z, Bertam M, Thurston J, Hall K (2004) Remote, wireless, permanent seismic stations: a mountain case. CREWES Research Report, vol 16 Bland H, Stewart R, Chen Z, Bertam M, Thurston J, Hall K (2004) Remote, wireless, permanent seismic stations: a mountain case. CREWES Research Report, vol 16
go back to reference Chowdhury AK (2007) Crown failure in the machine hall cavern of Tala Hydroelectric Project, Bhutan Himalaya. In: International workshop experiences gained in design and construction of Tala Hydroelectric Project, Bhutan, New Delhi, pp 93–105 Chowdhury AK (2007) Crown failure in the machine hall cavern of Tala Hydroelectric Project, Bhutan Himalaya. In: International workshop experiences gained in design and construction of Tala Hydroelectric Project, Bhutan, New Delhi, pp 93–105
go back to reference Drew J, Leslie H, Armstrong P, Michard G (2005) Automated microseismic event detection and location by continuous spatial mapping. In: SPE annual technical conference and exhibition, vol 7. Society of Petroleum Engineers, Dallas, Texas Drew J, Leslie H, Armstrong P, Michard G (2005) Automated microseismic event detection and location by continuous spatial mapping. In: SPE annual technical conference and exhibition, vol 7. Society of Petroleum Engineers, Dallas, Texas
go back to reference Essrich F (2005) Mine seismology for rock engineers—an outline of required competencies. In: Proceedings of the sixth international symposium on rockburst and seismicity in mines, pp 359–364 Essrich F (2005) Mine seismology for rock engineers—an outline of required competencies. In: Proceedings of the sixth international symposium on rockburst and seismicity in mines, pp 359–364
go back to reference Ghosh A, Hsiung SM, Chowdhury AH (1995) Seismic response of rock joints and jointed rock masses. NUREG/CR-6388 Ghosh A, Hsiung SM, Chowdhury AH (1995) Seismic response of rock joints and jointed rock masses. NUREG/CR-6388
go back to reference Glazer SN (2018) Mine seismology: seismic response to the caving process: a case study from four mines. Springer, Berlin Glazer SN (2018) Mine seismology: seismic response to the caving process: a case study from four mines. Springer, Berlin
go back to reference Hardy RH (2003) Acoustic emission/microseismic activity, vol 1. Principles, techniques and geotechnical applications. A.A. Balkema, Lisse/Abingdon/Exton (PA)/Tokyo Hardy RH (2003) Acoustic emission/microseismic activity, vol 1. Principles, techniques and geotechnical applications. A.A. Balkema, Lisse/Abingdon/Exton (PA)/Tokyo
go back to reference Hsiung SM, Ghosh A (2006) Seismic responses of underground excavations in jointed rock mass. In: 41st U.S. rock mechanics symposium, vol 13. American Rock Mechanics Association Hsiung SM, Ghosh A (2006) Seismic responses of underground excavations in jointed rock mass. In: 41st U.S. rock mechanics symposium, vol 13. American Rock Mechanics Association
go back to reference Mendecki AJ (1997) Seismic monitoring in mines. Chapman and Hall, London Mendecki AJ (1997) Seismic monitoring in mines. Chapman and Hall, London
go back to reference Mendecki AJ (2001) Data driven understanding of seismic rock mass response to mining. In: Fifth international symposium on rockbursts and seismicity in mines. The South African Institute of Mining and Metallurgy, Johannesburg, pp 1–9 Mendecki AJ (2001) Data driven understanding of seismic rock mass response to mining. In: Fifth international symposium on rockbursts and seismicity in mines. The South African Institute of Mining and Metallurgy, Johannesburg, pp 1–9
go back to reference Mendecki AJ, Aswegen GV, Mountfort P (1999) A guide to rountine seismic monitoring in mines. A handbook on rock engineering practice for tabular hard rock mines. Creda Communications, Cape Town, pp 1–33 Mendecki AJ, Aswegen GV, Mountfort P (1999) A guide to rountine seismic monitoring in mines. A handbook on rock engineering practice for tabular hard rock mines. Creda Communications, Cape Town, pp 1–33
go back to reference Morkel IG, Wesseloo J, Potvin Y (2019) The validity of Es/Ep as a source parameter in mining seismology. In: Ninth international conference on deep and high stress mining. The Southern African Institute of Mining and Metallurgy, Johannesburg, pp 385–398 Morkel IG, Wesseloo J, Potvin Y (2019) The validity of Es/Ep as a source parameter in mining seismology. In: Ninth international conference on deep and high stress mining. The Southern African Institute of Mining and Metallurgy, Johannesburg, pp 385–398
go back to reference Obert L, Duvall WI (1957) Microseismic method of determining the stability of underground openings. US Bur Mines Bull B 573:22 Obert L, Duvall WI (1957) Microseismic method of determining the stability of underground openings. US Bur Mines Bull B 573:22
go back to reference Saurabh B, Pabon B, Madhusmita B, Nadita H, Dutta R (2015) Literature survey of available earthquake hazard assessment studies related to North Eastern Region. Jorhat, Asssam Saurabh B, Pabon B, Madhusmita B, Nadita H, Dutta R (2015) Literature survey of available earthquake hazard assessment studies related to North Eastern Region. Jorhat, Asssam
go back to reference Sivakumar C, Srinivasan C, Willy YA (2008) Real time microseismic monitoring to study geomechanics of underground structures. In: 12th international association for computer methods and advances in geomechanics, vol 5, pp 1–6 Sivakumar C, Srinivasan C, Willy YA (2008) Real time microseismic monitoring to study geomechanics of underground structures. In: 12th international association for computer methods and advances in geomechanics, vol 5, pp 1–6
go back to reference Sripad RN, Sastry VR (2014) Behaviour of large underground cavern during construction in himalayas—a case study. Int J Earth Sci Eng 7:1601–1610 Sripad RN, Sastry VR (2014) Behaviour of large underground cavern during construction in himalayas—a case study. Int J Earth Sci Eng 7:1601–1610
go back to reference Thompson J, Franciose N, Marc S, Kate H, Jon M (2018) Tank development in the Midland Basin, Texas: a case study of super-charging a reservoir to optimize production and increase horizontal well densities. In: Unconventional resources technology conference. Unconventional Resources Technology, pp 1–9 Thompson J, Franciose N, Marc S, Kate H, Jon M (2018) Tank development in the Midland Basin, Texas: a case study of super-charging a reservoir to optimize production and increase horizontal well densities. In: Unconventional resources technology conference. Unconventional Resources Technology, pp 1–9
go back to reference Timothy L, Rai NL, Goulin Y, Nicolas C, Sonam T, Singh N, Pal B, Babu R, Pradhan R (2016) BHU: SASEC Transport, Trade Facilitation and Logistic Project Timothy L, Rai NL, Goulin Y, Nicolas C, Sonam T, Singh N, Pal B, Babu R, Pradhan R (2016) BHU: SASEC Transport, Trade Facilitation and Logistic Project
go back to reference Tripathi SK, Yadava VS (2007) Some fundamental geotechnical aspects related to the behaviour of large caverns, Tala Hydroelectric Project, Bhutan. In: International workshop experiences gained in design and construction of Tala Hydroelectric Project, Bhutan, New Delhi, pp 86–92 Tripathi SK, Yadava VS (2007) Some fundamental geotechnical aspects related to the behaviour of large caverns, Tala Hydroelectric Project, Bhutan. In: International workshop experiences gained in design and construction of Tala Hydroelectric Project, Bhutan, New Delhi, pp 86–92
go back to reference Van Aswegen G, Mendecki AJ, Lachenicht R, Dzhafarov AH, Hofmann G, Radu S, Eneva MSM (1999) Mine layout, geological features and seismic hazard. Pretoria GAP 303 Van Aswegen G, Mendecki AJ, Lachenicht R, Dzhafarov AH, Hofmann G, Radu S, Eneva MSM (1999) Mine layout, geological features and seismic hazard. Pretoria GAP 303
go back to reference Velasco AA, Gee VL, Rowe C, Grujic D, Holister LS, Hernandez D, Miler KC, Tobgay T, Fort M, Harder S (2007) Using small, temporary seismic networks for investigating tectonic deformation: brittle deformation and evidence for strike-slip faulting in Bhutan. Seismol Res Lett 78:446–453. https://doi.org/10.1785/gssrl.78.4.446CrossRef Velasco AA, Gee VL, Rowe C, Grujic D, Holister LS, Hernandez D, Miler KC, Tobgay T, Fort M, Harder S (2007) Using small, temporary seismic networks for investigating tectonic deformation: brittle deformation and evidence for strike-slip faulting in Bhutan. Seismol Res Lett 78:446–453. https://​doi.​org/​10.​1785/​gssrl.​78.​4.​446CrossRef
go back to reference Venkatesh HS, Gupta RN, Sharma BN, Dhir MC, Puri PK (2003) Rock mass damage control in machine hall cavern of Tala Hydroelectric Project (Bhutan) by near field vibration monitoring. In: International conference on accelerated construction of hydropower projects. Central Board of Irrigation and Power, Gedu, Bhutan, pp 23–31 Venkatesh HS, Gupta RN, Sharma BN, Dhir MC, Puri PK (2003) Rock mass damage control in machine hall cavern of Tala Hydroelectric Project (Bhutan) by near field vibration monitoring. In: International conference on accelerated construction of hydropower projects. Central Board of Irrigation and Power, Gedu, Bhutan, pp 23–31
go back to reference WAPCOS (1993) Tala hydro electric project (1020 MW) detailed project report volume-IX environmental studies, New Delhi WAPCOS (1993) Tala hydro electric project (1020 MW) detailed project report volume-IX environmental studies, New Delhi
Metadata
Title
Dynamic Stability Evaluation of Underground Powerhouse Cavern Using Microseismic Monitoring
Authors
Vikalp Kumar
Prakash Chandra Jha
Nagendra Pratap Singh
Sivakumar Cherukuri
Publication date
12-10-2020
Publisher
Springer International Publishing
Published in
Geotechnical and Geological Engineering / Issue 3/2021
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-020-01588-9

Other articles of this Issue 3/2021

Geotechnical and Geological Engineering 3/2021 Go to the issue