Skip to main content
Top

Hint

Swipe to navigate through the chapters of this book

2018 | OriginalPaper | Chapter

8. Economic Performance of Solar Gas Turbines

Abstract

Usually, decision-making about project development is influenced by the costs and benefits over the lifetime of a project. Costs and benefits of a project can be analyzed using several methods, which fall into two groups: (a) methods without time value and (b) those with time value of money. Two widespread indicators of methods without time value are payback period and average rate of return on investment. However, cash flows take place over a certain period of time. Consequently, methods with time value are more relevant, and they include net present value, discounted payback, internal rate of return and levelized cost of energy (LCOE). Some advantages of LCOE over NPV are: (a) the absence of restrictions on project scale, (b) LCOE is independent of energy technologies, and (c) LCOE is applicable even when energy technologies are of different types. Attractive theoretical values of LCOE have been reported (as low as 0.06 US$/kWh) for solar gas turbines (SGTs), which compare very well with LCOE values (0.092-0.095 US$/kWh) for some coal power plants. This indicates that the economic performance of the SGT technology is theoretically approaching parity with conventional thermal power plants.

To get access to this content you need the following product:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe



 


Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Literature
go back to reference Bhattacharyya SC (2011) Energy economics: concepts, issues, markets and governance. Springer, London CrossRef Bhattacharyya SC (2011) Energy economics: concepts, issues, markets and governance. Springer, London CrossRef
go back to reference Cruz MA, Araújo OQF, Medeiros JL, Castro RPV, Ribeiro GT, Oliveira VR (2017) Impact of solid waste treatment from spray dryer absorber on the levelized cost of energy of a coal-fired power plant. J Clean Prod 164:1623–1634 CrossRef Cruz MA, Araújo OQF, Medeiros JL, Castro RPV, Ribeiro GT, Oliveira VR (2017) Impact of solid waste treatment from spray dryer absorber on the levelized cost of energy of a coal-fired power plant. J Clean Prod 164:1623–1634 CrossRef
go back to reference Idrus A, Nuruddin MF, Rohman MA (2011) Development of project cost contingency estimation model using risk analysis and fuzzy expert system. Expert Syst Appl 38:1501–1508 CrossRef Idrus A, Nuruddin MF, Rohman MA (2011) Development of project cost contingency estimation model using risk analysis and fuzzy expert system. Expert Syst Appl 38:1501–1508 CrossRef
go back to reference Kreiss J, Ehrhart K, Haufeb M (2017) Appropriate design of auctions for renewable energy support–Prequalifications and penalties. Energy Policy 101:512–520 CrossRef Kreiss J, Ehrhart K, Haufeb M (2017) Appropriate design of auctions for renewable energy support–Prequalifications and penalties. Energy Policy 101:512–520 CrossRef
go back to reference Kribus A, Zaibel R, Carey D, Segal A, Karni J (1998) A solar-driven combined cycle power plant. Sol Energy 62:121–129 CrossRef Kribus A, Zaibel R, Carey D, Segal A, Karni J (1998) A solar-driven combined cycle power plant. Sol Energy 62:121–129 CrossRef
go back to reference Lamnatou C, Chemisana D (2017) Concentrating solar systems: Life Cycle Assessment (LCA) and environmental issues. Renew Sustain Energy Rev 78:916–932 CrossRef Lamnatou C, Chemisana D (2017) Concentrating solar systems: Life Cycle Assessment (LCA) and environmental issues. Renew Sustain Energy Rev 78:916–932 CrossRef
go back to reference Larsson S, Fantazzini D, Davidsson S, Kullander S, Höök M (2014) Reviewing electricity production cost assessments. Renew Sustain Energy Rev 30:170–183 CrossRef Larsson S, Fantazzini D, Davidsson S, Kullander S, Höök M (2014) Reviewing electricity production cost assessments. Renew Sustain Energy Rev 30:170–183 CrossRef
go back to reference Mellichamp D (2017) Internal rate of return: good and bad features, and a new way of interpreting the historic measure. Comput Chem Eng 106:396–406 CrossRef Mellichamp D (2017) Internal rate of return: good and bad features, and a new way of interpreting the historic measure. Comput Chem Eng 106:396–406 CrossRef
go back to reference Orioli A, Gangi A (2017) Six-years-long effects of the Italian policies for photovoltaics on the pay-back period of grid-connected PV systems installed in urban contexts. Energy 122:458–470 CrossRef Orioli A, Gangi A (2017) Six-years-long effects of the Italian policies for photovoltaics on the pay-back period of grid-connected PV systems installed in urban contexts. Energy 122:458–470 CrossRef
go back to reference Percoco M, Borgonovo E (2012) A note on the sensitivity analysis of the internal rate of return. Int J Prod Econ 135:526–529 CrossRef Percoco M, Borgonovo E (2012) A note on the sensitivity analysis of the internal rate of return. Int J Prod Econ 135:526–529 CrossRef
go back to reference Prljić S, Nikitović Z, Stojanović AG, Cogoljević D, Pešić G, Alizamir M (2018) Management of business economic growth as function of resource rents. Phys A 491:325–328 CrossRef Prljić S, Nikitović Z, Stojanović AG, Cogoljević D, Pešić G, Alizamir M (2018) Management of business economic growth as function of resource rents. Phys A 491:325–328 CrossRef
go back to reference Rothman R (2000) Measuring and apportioning rents from hydroelectric power developments. World Bank Discussion Paper no. 419. World Bank, Washington Rothman R (2000) Measuring and apportioning rents from hydroelectric power developments. World Bank Discussion Paper no. 419. World Bank, Washington
go back to reference Sell A (1989) Calculation of working capital for the evaluation of projects in developing countries. Project Appraisal 4:151–156 CrossRef Sell A (1989) Calculation of working capital for the evaluation of projects in developing countries. Project Appraisal 4:151–156 CrossRef
go back to reference Selwynraj AI, Iniyan S, Polonsky G, Suganthi L, Kribus A (2015) An economic analysis of solar hybrid steam injected gas turbine (STIG) plant for Indian conditions. Appl Therm Eng 75:1055–1064 CrossRef Selwynraj AI, Iniyan S, Polonsky G, Suganthi L, Kribus A (2015) An economic analysis of solar hybrid steam injected gas turbine (STIG) plant for Indian conditions. Appl Therm Eng 75:1055–1064 CrossRef
go back to reference Shrestha KK, Shrestha PP (2016) A contingency cost estimation system for road maintenance contracts. Procedia Eng 145:128–135 CrossRef Shrestha KK, Shrestha PP (2016) A contingency cost estimation system for road maintenance contracts. Procedia Eng 145:128–135 CrossRef
go back to reference Shrestha R, Abeygunawardana A (2009) Evaluation of economic rent of hydropower projects. Energy Policy 37:1886–1897 CrossRef Shrestha R, Abeygunawardana A (2009) Evaluation of economic rent of hydropower projects. Energy Policy 37:1886–1897 CrossRef
go back to reference Touran A, Liu J (2015) A method for estimating contingency based on project complexity. Procedia Eng 123:574–580 CrossRef Touran A, Liu J (2015) A method for estimating contingency based on project complexity. Procedia Eng 123:574–580 CrossRef
go back to reference Ukaegbu B (2014) The significance of working capital management in determining firm profitability: evidence from developing economies in Africa. Res Int Bus Finance 31:1–16 CrossRef Ukaegbu B (2014) The significance of working capital management in determining firm profitability: evidence from developing economies in Africa. Res Int Bus Finance 31:1–16 CrossRef
go back to reference Yucekaya A (2013) Bidding of price taker power generators in the deregulated Turkish power market. Renew Sustain Energy Rev 22:506–514 CrossRef Yucekaya A (2013) Bidding of price taker power generators in the deregulated Turkish power market. Renew Sustain Energy Rev 22:506–514 CrossRef
go back to reference Zhao Z, Chen Y, Thomson J (2017) Levelized cost of energy modeling for concentrated solar power projects: a China study. Energy 120:117–127 CrossRef Zhao Z, Chen Y, Thomson J (2017) Levelized cost of energy modeling for concentrated solar power projects: a China study. Energy 120:117–127 CrossRef
Metadata
Title
Economic Performance of Solar Gas Turbines
Author
Amos Madhlopa
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-68388-1_8

Premium Partners