Skip to main content
Top

2020 | OriginalPaper | Chapter

13. EOQ Model Under Discounted Partial Advance—Partial Trade Credit Policy with Price-Dependent Demand

Authors : Swati Agrawal, Rajesh Gupta, Snigdha Banerjee

Published in: Optimization and Inventory Management

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The aim of this article is to investigate an inventory model with discounted partial advance payment in a single supplier–single retailer supply chain in the presence of credit period when the demand rate is price sensitive. The lengths of the credit period, advance period, as well as rate of discount on advance payment, are specified by the supplier. Conditions for unique optimal values of the decision variables, namely, the retailer’s selling price and cycle length are obtained. Optimal values of the decision variables are determined iteratively. An algorithm is developed and a numerical example is presented to demonstrate the solution algorithm. Sensitivity analysis is conducted. It is observed that optimal cycle time is affected by the two interest rates. Optimal net profit is affected by the demand rate and the discount factor. Both, the optimal cycle time, as well as the optimal net profit is affected by the supplier’s selling price and the proportion of units for which the advance payment is made. Optimal retailer’s selling price is significantly affected by the discount factor, supplier’s selling price, price elasticity of the demand function as well as the proportion of units for which advance payment is made. We also observe that the retailer’s net profit does not decrease significantly on increasing the advance period.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
1.
go back to reference Abad PL, Jaggi CK (2003) A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int J Prod Econ 83(2):115–122CrossRef Abad PL, Jaggi CK (2003) A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int J Prod Econ 83(2):115–122CrossRef
2.
go back to reference Banerjee S, Sharma A (2010) Inventory model for seasonal demand with option to change the market. Comput Ind Eng 59(4):807–818CrossRef Banerjee S, Sharma A (2010) Inventory model for seasonal demand with option to change the market. Comput Ind Eng 59(4):807–818CrossRef
3.
go back to reference Chang CT, Ouyang LY, Teng JT, Cheng MC (2010) Optimal ordering policies for deteriorating items using a discounted cash-flow analysis when a trade credit is linked to order quantity. Comput Ind Eng 59(4):770–777CrossRef Chang CT, Ouyang LY, Teng JT, Cheng MC (2010) Optimal ordering policies for deteriorating items using a discounted cash-flow analysis when a trade credit is linked to order quantity. Comput Ind Eng 59(4):770–777CrossRef
4.
go back to reference Chen LH, Kang FS (2010) Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme. Eur J Oper Res 205:47–58CrossRef Chen LH, Kang FS (2010) Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme. Eur J Oper Res 205:47–58CrossRef
5.
go back to reference Chen SC, Teng JT (2014) Retailer’s optimal ordering policy for deteriorating items with maximum lifetime under supplier’s trade credit financing. Appl Math Model 38(15–16):4049–4061CrossRef Chen SC, Teng JT (2014) Retailer’s optimal ordering policy for deteriorating items with maximum lifetime under supplier’s trade credit financing. Appl Math Model 38(15–16):4049–4061CrossRef
6.
go back to reference Chung K-J, Liao J-J (2011) The simplified solution algorithm for an integrated supplier–retailer inventory model with two-part trade credit in a supply chain system. Eur J Oper Res 213:156–165CrossRef Chung K-J, Liao J-J (2011) The simplified solution algorithm for an integrated supplier–retailer inventory model with two-part trade credit in a supply chain system. Eur J Oper Res 213:156–165CrossRef
7.
go back to reference Diabat A, Taleizadeh AA, Lashgari M (2017) A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items. Journal of Manufacturing Systems 45:322–342CrossRef Diabat A, Taleizadeh AA, Lashgari M (2017) A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items. Journal of Manufacturing Systems 45:322–342CrossRef
8.
go back to reference Goyal SK (1985) Economic order quantity under conditions of permissible delay in payment. J Oper Res Soc 36(4):335–338CrossRef Goyal SK (1985) Economic order quantity under conditions of permissible delay in payment. J Oper Res Soc 36(4):335–338CrossRef
9.
go back to reference Gupta R, Bhunia A, Goyal S (2009) An application of genetic algorithm in solving an inventory model with advance payment and interval valued inventory costs. Math Comput Model 49(5):893–905CrossRef Gupta R, Bhunia A, Goyal S (2009) An application of genetic algorithm in solving an inventory model with advance payment and interval valued inventory costs. Math Comput Model 49(5):893–905CrossRef
10.
go back to reference Gupta R, Agrawal S, Banerjee S (2017) Buyer’s Optimal Policy for a Deterministic Inventory Model with Discounted Advance Payment and Trade Credit in a Supply Chain System. Amity Journal of Operations Management 2(1):51–64 Gupta R, Agrawal S, Banerjee S (2017) Buyer’s Optimal Policy for a Deterministic Inventory Model with Discounted Advance Payment and Trade Credit in a Supply Chain System. Amity Journal of Operations Management 2(1):51–64
11.
go back to reference Gupta R, Banerjee S, Agrawal S (2018) Retailer’s optimal payment decisions for price-dependent demand under partial advance payment and trade credit in different scenarios. Int J Sci Res Math Stat Sci 5(4):44–53 Gupta R, Banerjee S, Agrawal S (2018) Retailer’s optimal payment decisions for price-dependent demand under partial advance payment and trade credit in different scenarios. Int J Sci Res Math Stat Sci 5(4):44–53
12.
go back to reference Ho CH, Ouyang LY, Su CH (2008) Optimal pricing, shipment and payment policy for an integrated supplier–buyer inventory model with two-part trade credit. Eur J Oper Res 187(2):496–510CrossRef Ho CH, Ouyang LY, Su CH (2008) Optimal pricing, shipment and payment policy for an integrated supplier–buyer inventory model with two-part trade credit. Eur J Oper Res 187(2):496–510CrossRef
13.
go back to reference Hwang H, Shinn SW (1997) Retailer’s pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments. Comput Oper Res 24(6):539–547CrossRef Hwang H, Shinn SW (1997) Retailer’s pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments. Comput Oper Res 24(6):539–547CrossRef
14.
go back to reference Jaggi CK, Cárdenas-Barrón LE, Tiwari S, Shafi AA (2017a) Two-warehouse inventory model for deteriorating items with imperfect quality under the conditions of permissible delay in payments. Sci Iranica Trans E, Ind Eng 24(1):390–412CrossRef Jaggi CK, Cárdenas-Barrón LE, Tiwari S, Shafi AA (2017a) Two-warehouse inventory model for deteriorating items with imperfect quality under the conditions of permissible delay in payments. Sci Iranica Trans E, Ind Eng 24(1):390–412CrossRef
15.
go back to reference Jaggi CK, Tiwari S, Goel SK (2017) Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand and two storage facilities. Ann Oper Res 248(1–2):253–280CrossRef Jaggi CK, Tiwari S, Goel SK (2017) Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand and two storage facilities. Ann Oper Res 248(1–2):253–280CrossRef
16.
go back to reference Khanna A, Gautam P, Jaggi CK (2017) Inventory modeling for deteriorating imperfect quality items with selling price dependent demand and shortage backordering under credit financing. Int JMath Eng Manag Sci 2(2):110–124 Khanna A, Gautam P, Jaggi CK (2017) Inventory modeling for deteriorating imperfect quality items with selling price dependent demand and shortage backordering under credit financing. Int JMath Eng Manag Sci 2(2):110–124
17.
go back to reference Lashgari M, Taleizadeh AA, Ahmadi A (2016) Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain. Ann Oper Res 238(1–2):329–354CrossRef Lashgari M, Taleizadeh AA, Ahmadi A (2016) Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain. Ann Oper Res 238(1–2):329–354CrossRef
18.
go back to reference Maiti AK, Maiti MK, Maiti M (2009) Inventory model with stochastic lead-time and price dependent demand incorporating advance payment. Appl Math Model 33(5):2433–2443CrossRef Maiti AK, Maiti MK, Maiti M (2009) Inventory model with stochastic lead-time and price dependent demand incorporating advance payment. Appl Math Model 33(5):2433–2443CrossRef
19.
go back to reference Mishra U, Tijerina-Aguilera J, Tiwari S, Cárdenas-Barrón LE (2018) Retailer’s joint ordering, pricing, and preservation technology investment policies for a deteriorating item under permissible delay in payments. Math Probl Eng Mishra U, Tijerina-Aguilera J, Tiwari S, Cárdenas-Barrón LE (2018) Retailer’s joint ordering, pricing, and preservation technology investment policies for a deteriorating item under permissible delay in payments. Math Probl Eng
20.
go back to reference Molamohamadi Z, Arshizadeh R, Ismail N (2014) An EPQ inventory model with allowable shortages for deteriorating items under trade credit policy. Discret Dyn Nat Soc Molamohamadi Z, Arshizadeh R, Ismail N (2014) An EPQ inventory model with allowable shortages for deteriorating items under trade credit policy. Discret Dyn Nat Soc
21.
go back to reference Ouyang L, Ho C, Su C (2009) An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit. Comput Ind Eng 57(3):920–930CrossRef Ouyang L, Ho C, Su C (2009) An optimization approach for joint pricing and ordering problem in an integrated inventory system with order-size dependent trade credit. Comput Ind Eng 57(3):920–930CrossRef
22.
go back to reference Sarkar B (2012) An EOQ model with delay in payments and time varying deterioration rate. Math Comput Model 55(3–4):367–377CrossRef Sarkar B (2012) An EOQ model with delay in payments and time varying deterioration rate. Math Comput Model 55(3–4):367–377CrossRef
23.
go back to reference Shah NH, Shah DB, Patel DG (2015) Optimal transfer, ordering and payment policies for joint supplier–buyer inventory model with price-sensitive trapezoidal demand and net credit. Int J Syst Sci 46(10):1752–1761CrossRef Shah NH, Shah DB, Patel DG (2015) Optimal transfer, ordering and payment policies for joint supplier–buyer inventory model with price-sensitive trapezoidal demand and net credit. Int J Syst Sci 46(10):1752–1761CrossRef
24.
go back to reference Taleizadeh AA (2014) An EOQ model with partial backordering and advance payments for an evaporating item. Int J Prod Econ 155:185–193CrossRef Taleizadeh AA (2014) An EOQ model with partial backordering and advance payments for an evaporating item. Int J Prod Econ 155:185–193CrossRef
25.
go back to reference Taleizadeh AA (2017) Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering. Int Trans Oper Res 24(4):783–800CrossRef Taleizadeh AA (2017) Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering. Int Trans Oper Res 24(4):783–800CrossRef
26.
go back to reference Taleizadeh AA, Lashgari M, Akram R, Heydari J (2016) Imperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periods. Appl Math Model 40(19–20):8777–8793CrossRef Taleizadeh AA, Lashgari M, Akram R, Heydari J (2016) Imperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periods. Appl Math Model 40(19–20):8777–8793CrossRef
27.
go back to reference Teng JT (2002) On the economic order quantity under conditions of permissible delay in payments. J Oper Res Soc 53:915–918CrossRef Teng JT (2002) On the economic order quantity under conditions of permissible delay in payments. J Oper Res Soc 53:915–918CrossRef
28.
go back to reference Teng JT, Chang CT, Goyal SK (2005) Optimal pricing and ordering policy under permissible delay in payments. Int J Prod Econ 97(2):121–129CrossRef Teng JT, Chang CT, Goyal SK (2005) Optimal pricing and ordering policy under permissible delay in payments. Int J Prod Econ 97(2):121–129CrossRef
29.
go back to reference Thangam A (2012) Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits. Int. J. Production Economics 139:459–472CrossRef Thangam A (2012) Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits. Int. J. Production Economics 139:459–472CrossRef
30.
go back to reference Tiwari S, Cárdenas-Barrón LE, Khanna A, Jaggi CK (2016) Impact of trade credit and inflation on retailer’s ordering policies for non-instantaneous deteriorating items in a two-warehouse environment. Int J Prod Econ 176:154–169CrossRef Tiwari S, Cárdenas-Barrón LE, Khanna A, Jaggi CK (2016) Impact of trade credit and inflation on retailer’s ordering policies for non-instantaneous deteriorating items in a two-warehouse environment. Int J Prod Econ 176:154–169CrossRef
31.
go back to reference Wu J, Teng JT, Chan YL (2017) Inventory policies for perishable products with expiration dates and advance-cash-credit payment schemes. Int J Syst Sci: Oper Logist 1–17 Wu J, Teng JT, Chan YL (2017) Inventory policies for perishable products with expiration dates and advance-cash-credit payment schemes. Int J Syst Sci: Oper Logist 1–17
32.
go back to reference Zhang Q, Tsao YC, Chen TH (2014) Economic order quantity under advance payment. Appl Math Model 38(24):5910–5921CrossRef Zhang Q, Tsao YC, Chen TH (2014) Economic order quantity under advance payment. Appl Math Model 38(24):5910–5921CrossRef
33.
go back to reference Zia NP, Taleizadeh AA (2015) A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment. Transp Res Part E: Logist Transp Rev 82:19–37CrossRef Zia NP, Taleizadeh AA (2015) A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment. Transp Res Part E: Logist Transp Rev 82:19–37CrossRef
Metadata
Title
EOQ Model Under Discounted Partial Advance—Partial Trade Credit Policy with Price-Dependent Demand
Authors
Swati Agrawal
Rajesh Gupta
Snigdha Banerjee
Copyright Year
2020
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-13-9698-4_13