2. Estimating the Costs of Planned Changes Implied by Freezing Production Plans

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The use of production planning algorithms on a rolling horizon basis is very common in practice. However, this leads to frequent changes in planned quantities for future periods which may adversely impact support activities such as material preparation, staffing, and setup planning. In this chapter we examine two widely used approaches for this problem, the use of change costs to penalize changes in planned quantities and freezing of the plan by prohibiting any changes in some number of periods in the near future. We use a linear programming model of a single-product single-stage system to develop insights into the conditions when the two approaches are equivalent. Specifically, we derive lower bounds on the values of the change costs which will ensure freezing of the plan in a given planning epoch, and present numerical results to illustrate our findings.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Aouam T, Uzsoy R (2014) Zero-order production planning models with stochastic demand and workload-dependent lead times. Int J Prod Res 1–19. ISSN 0020-7543 Aouam T, Uzsoy R (2014) Zero-order production planning models with stochastic demand and workload-dependent lead times. Int J Prod Res 1–19. ISSN 0020-7543
go back to reference Bai X, Davis JS, Kanet JJ, Cantrell S, Patterson JW (2002) Schedule instability, service level and cost in a material requirements planning system. Int J Prod Res 40(7):1725–1758. ISSN 0020-7543 Bai X, Davis JS, Kanet JJ, Cantrell S, Patterson JW (2002) Schedule instability, service level and cost in a material requirements planning system. Int J Prod Res 40(7):1725–1758. ISSN 0020-7543
go back to reference Blackburn JD, Kropp DH, Millen RA (1985) MRP system nervousness: causes and cures. Eng Costs Prod Econ 9(1–3):141–146. ISSN 0167188X Blackburn JD, Kropp DH, Millen RA (1985) MRP system nervousness: causes and cures. Eng Costs Prod Econ 9(1–3):141–146. ISSN 0167188X
go back to reference Blackburn JD, Kropp DH, Millen RA (1986) A comparison of strategies to dampen nervousness in MRP systems. Manag Sci 32(4):413–429. ISSN 0025-1909 Blackburn JD, Kropp DH, Millen RA (1986) A comparison of strategies to dampen nervousness in MRP systems. Manag Sci 32(4):413–429. ISSN 0025-1909
go back to reference Bookbinder JH, Tan JY (1988) Strategies for the probabilistic lot-sizing problem with service-level constraints. Manag Sci 34(9):1096–1108CrossRef Bookbinder JH, Tan JY (1988) Strategies for the probabilistic lot-sizing problem with service-level constraints. Manag Sci 34(9):1096–1108CrossRef
go back to reference Braun MW, Schwartz JD (2012) A control theoretic evaluation of schedule nervousness suppression techniques for master production scheduling. In: Decision policies for production networks. Springer, London, pp 143–171CrossRef Braun MW, Schwartz JD (2012) A control theoretic evaluation of schedule nervousness suppression techniques for master production scheduling. In: Decision policies for production networks. Springer, London, pp 143–171CrossRef
go back to reference Carlson RC, Jucker JV, Kropp DH (1979) Less nervous MRP systems: a dynamic economic lot-sizing approach. Manag Sci 25(8):754–761. ISSN 0025-1909 Carlson RC, Jucker JV, Kropp DH (1979) Less nervous MRP systems: a dynamic economic lot-sizing approach. Manag Sci 25(8):754–761. ISSN 0025-1909
go back to reference Carlson RC, Beckman SL, Kropp DH (1982) The effectiveness of extending the horizon in rolling production scheduling. Decis Sci 13(1):129–146. ISSN 0011-7315 Carlson RC, Beckman SL, Kropp DH (1982) The effectiveness of extending the horizon in rolling production scheduling. Decis Sci 13(1):129–146. ISSN 0011-7315
go back to reference Eilon S (1975) Five approaches to aggregate production planning. IIE Trans 7(2):118–131. ISSN 0569-5554 Eilon S (1975) Five approaches to aggregate production planning. IIE Trans 7(2):118–131. ISSN 0569-5554
go back to reference Fisher M, Ramdas K, Zheng Y (2001) Ending inventory valuation in multiperiod production scheduling. Manag Sci 47(5):679–692. ISSN 0025-1909 Fisher M, Ramdas K, Zheng Y (2001) Ending inventory valuation in multiperiod production scheduling. Manag Sci 47(5):679–692. ISSN 0025-1909
go back to reference Grinold RC (1980) Time horizons in energy planning models. In: Energy policy modeling: United States and Canadian experiences. Springer, Netherlands, pp 216–232CrossRef Grinold RC (1980) Time horizons in energy planning models. In: Energy policy modeling: United States and Canadian experiences. Springer, Netherlands, pp 216–232CrossRef
go back to reference Grinold RC (1983) Model building techniques for the correction of end effects in multistage convex programs. Oper Res 31(3):407–431CrossRef Grinold RC (1983) Model building techniques for the correction of end effects in multistage convex programs. Oper Res 31(3):407–431CrossRef
go back to reference Hung Y, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef Hung Y, Leachman RC (1996) A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans Semicond Manuf 9(2):257–269CrossRef
go back to reference Johnson LA, Montgomery DC (1974) Operations research in production planning, scheduling, and inventory control. Wiley, New York Johnson LA, Montgomery DC (1974) Operations research in production planning, scheduling, and inventory control. Wiley, New York
go back to reference Kadipasaoglu SN, Sridharan V (1995) Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. J Oper Manag 13(3):193–221CrossRef Kadipasaoglu SN, Sridharan V (1995) Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. J Oper Manag 13(3):193–221CrossRef
go back to reference Kropp DH, Carlson RC (1984) A lot-sizing algorithm for reducing nervousness in MRP systems. Manag Sci 30(2):240–244. ISSN 0025-1909 Kropp DH, Carlson RC (1984) A lot-sizing algorithm for reducing nervousness in MRP systems. Manag Sci 30(2):240–244. ISSN 0025-1909
go back to reference Kropp DH, Carlson RC, Jucker JV (1983) Heuristic lot-sizing approached for dealing with MRP system nervousness. Decis Sci 14(2):152–169CrossRef Kropp DH, Carlson RC, Jucker JV (1983) Heuristic lot-sizing approached for dealing with MRP system nervousness. Decis Sci 14(2):152–169CrossRef
go back to reference Lin N, Krajewski LJ, Leong GK, Benton WC (1994) The effects of environmental factors on the design of master production scheduling systems. J Oper Manag 11(4):367–384CrossRef Lin N, Krajewski LJ, Leong GK, Benton WC (1994) The effects of environmental factors on the design of master production scheduling systems. J Oper Manag 11(4):367–384CrossRef
go back to reference Mather H (1977) Reschedule the reschedules you just rescheduled: way of life for MRP? Prod Invent Manag 18(1):60–79 Mather H (1977) Reschedule the reschedules you just rescheduled: way of life for MRP? Prod Invent Manag 18(1):60–79
go back to reference Metters R, Vargas V (1999) A comparison of production scheduling policies on costs, service level, and schedule changes. Prod Oper Manag 8(1):76–91. ISSN 10591478 Metters R, Vargas V (1999) A comparison of production scheduling policies on costs, service level, and schedule changes. Prod Oper Manag 8(1):76–91. ISSN 10591478
go back to reference Missbauer H, Uzsoy R (2011) Optimization models of production planning problems. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook. Springer, New York, pp 437–508CrossRef Missbauer H, Uzsoy R (2011) Optimization models of production planning problems. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook. Springer, New York, pp 437–508CrossRef
go back to reference Narayanan A, Robinson P (2010) Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems. Int J Prod Econ 127(1):85–94CrossRef Narayanan A, Robinson P (2010) Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems. Int J Prod Econ 127(1):85–94CrossRef
go back to reference Ravindran A, Kempf KG, Uzsoy R (2011) Production planning with load-dependent lead times and safety stocks for a single product. Int J Plan Sched 1(1/2):58. ISSN 2044-494X Ravindran A, Kempf KG, Uzsoy R (2011) Production planning with load-dependent lead times and safety stocks for a single product. Int J Plan Sched 1(1/2):58. ISSN 2044-494X
go back to reference Sahin F, Narayanan A, Robinson EP (2013) Rolling horizon planning in supply chains: review, implications and directions for future research. Int J Prod Res 51(18):5413–5430CrossRef Sahin F, Narayanan A, Robinson EP (2013) Rolling horizon planning in supply chains: review, implications and directions for future research. Int J Prod Res 51(18):5413–5430CrossRef
go back to reference Sridharan V, Berry WL (1990) Freezing the master production schedule under demand uncertainty. Decis Sci 21(1):97–120CrossRef Sridharan V, Berry WL (1990) Freezing the master production schedule under demand uncertainty. Decis Sci 21(1):97–120CrossRef
go back to reference Sridharan V, LaForge RL (1989) The impact of safety stock on schedule instability, cost and service. J Oper Manag 8(4):327–347. ISSN 02726963 Sridharan V, LaForge RL (1989) The impact of safety stock on schedule instability, cost and service. J Oper Manag 8(4):327–347. ISSN 02726963
go back to reference Sridharan V, LaForge RL (1994a) Freezing the master production schedule: implications for fill rate. Decis Sci 25(3):461–469 Sridharan V, LaForge RL (1994a) Freezing the master production schedule: implications for fill rate. Decis Sci 25(3):461–469
go back to reference Sridharan V, LaForge RL (1994b) A model to estimate service levels when a portion of the master production schedule is frozen. Comput Oper Res 21(5):477–486. ISSN 03050548 Sridharan V, LaForge RL (1994b) A model to estimate service levels when a portion of the master production schedule is frozen. Comput Oper Res 21(5):477–486. ISSN 03050548
go back to reference Sridharan V, Berry WL, Udayabhanu V (1987) Freezing the master production schedule under rolling planning horizons. Manag Sci 33(9):1137–1149. ISSN 0025-1909 Sridharan V, Berry WL, Udayabhanu V (1987) Freezing the master production schedule under rolling planning horizons. Manag Sci 33(9):1137–1149. ISSN 0025-1909
go back to reference Sridharan SV, Berry WL, Udayabhanu V (1988) Measuring master production schedule stability under rolling planning horizons. Decis Sci 19(1):147–166CrossRef Sridharan SV, Berry WL, Udayabhanu V (1988) Measuring master production schedule stability under rolling planning horizons. Decis Sci 19(1):147–166CrossRef
go back to reference Tarim SA, Kingsman BG (2004) The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. Int J Prod Econ 88(1):105–119CrossRef Tarim SA, Kingsman BG (2004) The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. Int J Prod Econ 88(1):105–119CrossRef
go back to reference Voss S, Woodruff DL (2006) Introduction to computational optimization models for production planning in a supply chain. Springer, Berlin Voss S, Woodruff DL (2006) Introduction to computational optimization models for production planning in a supply chain. Springer, Berlin
go back to reference Wagner HM, Whitin TM (1958) Dynamic version of the economic lot size model. Manag Sci 5(1):89–96. ISSN 0025-1909 Wagner HM, Whitin TM (1958) Dynamic version of the economic lot size model. Manag Sci 5(1):89–96. ISSN 0025-1909
go back to reference Xie J, Zhao X, Lee TS (2003) Freezing the master production schedule under single resource constraint and demand uncertainty. Int J Prod Econ 83(1):65–84CrossRef Xie J, Zhao X, Lee TS (2003) Freezing the master production schedule under single resource constraint and demand uncertainty. Int J Prod Econ 83(1):65–84CrossRef
go back to reference Yano CA, Carlson RC (1987) Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems. Int J Prod Res 25(2):221–232CrossRef Yano CA, Carlson RC (1987) Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems. Int J Prod Res 25(2):221–232CrossRef
go back to reference Zhao X, Lam K (1997) Lot-sizing rules and freezing the master production schedule in material requirements planning systems. Int J Prod Econ 53(3):281–305CrossRef Zhao X, Lam K (1997) Lot-sizing rules and freezing the master production schedule in material requirements planning systems. Int J Prod Econ 53(3):281–305CrossRef
go back to reference Zhao X, Lee TS (1993) Freezing the master production schedule for material requirements planning systems under demand uncertainty. J Oper Manag 11(2):185–205CrossRef Zhao X, Lee TS (1993) Freezing the master production schedule for material requirements planning systems under demand uncertainty. J Oper Manag 11(2):185–205CrossRef
go back to reference Zhao X, Xie J (1998) Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems. Prod Plan Control 9(4):371–384CrossRef Zhao X, Xie J (1998) Multilevel lot-sizing heuristics and freezing the master production schedule in material requirements planning systems. Prod Plan Control 9(4):371–384CrossRef
Metadata
Title
Estimating the Costs of Planned Changes Implied by Freezing Production Plans
Authors
Po-Chen Lin
Reha Uzsoy
Copyright Year
2016
DOI
https://doi.org/10.1007/978-3-319-26024-2_2