Evaluation of TBM performance prediction models and sensitivity analysis of input parameters

Authors: Seyyed Amirasad Fatemi, Morteza Ahmadi, Jamal Rostami

Published in: Bulletin of Engineering Geology and the Environment | Issue 2/2018

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In recent years, anumber of models and formulas have been proposed to estimate the penetration rate of hard rock tunnel boring machines (TBMs). This study will focus on sensitivity analysis and examination of the effects of variation in the input parameters on the results of the commonly used performance prediction models for rock TBMs. The results of modeling were compared with the recorded machine performance to evaluate the validity and accuracy of these models. The sensitivity analysis of the four most common models indicates that uniaxial compressive strength followed by rock mass fracturing is among the most influential parameters used in these models. In addition, the result of our analysis shows that increasing the number of independent input variables does not increase the accuracy of prediction. The effect of discontinuity orientation in some models has also been considered. The results indicate that substantial changes in the angle between the discontinuity orientation and the tunnel axis have minor effects on penetration rate. The results of models were compared to recorded TBM penetration rate during excavation of Golab Tunnel, and the results indicate that the Gong model has the lowest error in comparison with other models. Grouping the rock types and using pertinent equations in the Farrokh model offered overall higher accuracy than other models in some structures of the Golab project. A brief set of recommendations are offered about the models and their applicability to various ground conditions.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Aeberli U, Wanner W (1978) On the influence of discontinuities at the application of tunneling machines. In: Proceedings of the 3rd international congress IAEG, Madrid Aeberli U, Wanner W (1978) On the influence of discontinuities at the application of tunneling machines. In: Proceedings of the 3rd international congress IAEG, Madrid
go back to reference Alber M (1996) Prediction of penetration and utilization for hard rock TBMs. In: Proceedings of the International Conference of Eurock Alber M (1996) Prediction of penetration and utilization for hard rock TBMs. In: Proceedings of the International Conference of Eurock
go back to reference Barton N (1999) TBM performance estimation in rock using QTBM. Tunn Tunn Int 31(9):41–48 Barton N (1999) TBM performance estimation in rock using QTBM. Tunn Tunn Int 31(9):41–48
go back to reference Bieniawski Z, Grandori R (2007) Predicting TBM Excavability-Part II. Tunn Tunn Int Bieniawski Z, Grandori R (2007) Predicting TBM Excavability-Part II. Tunn Tunn Int
go back to reference Bieniawski Z, Tamames B, Fernandez J, Hernandez M (2006) Rock mass excavability (RME) indicator: new way to selecting the optimum tunnel construction method. International Congress ITA, Seul (Korea) Bieniawski Z, Tamames B, Fernandez J, Hernandez M (2006) Rock mass excavability (RME) indicator: new way to selecting the optimum tunnel construction method. International Congress ITA, Seul (Korea)
go back to reference Bieniawski Z, Celada B, Galera J (2007) TBM excavability: prediction and machine-rock interaction. RETC, Toronto, pp 1118 Bieniawski Z, Celada B, Galera J (2007) TBM excavability: prediction and machine-rock interaction. RETC, Toronto, pp 1118
go back to reference Cassinelli FS Cina, Innaurato N (1983) Power consumption and metal wear in tunnel-boring machines: analysis of tunnel-boring operation in hard rock: In: Tunneling 82, Proceedings of the 3rd International Symposium, Brighton, 7–11 June 1982, P73–81. Publ London: IMM, 1982. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, Pergamon Cassinelli FS Cina, Innaurato N (1983) Power consumption and metal wear in tunnel-boring machines: analysis of tunnel-boring operation in hard rock: In: Tunneling 82, Proceedings of the 3rd International Symposium, Brighton, 7–11 June 1982, P73–81. Publ London: IMM, 1982. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, Pergamon
go back to reference Delisio A, Zhao J, Einstein H (2013) Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel. Tunn Undergr Space Technol 33:131–142CrossRef Delisio A, Zhao J, Einstein H (2013) Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel. Tunn Undergr Space Technol 33:131–142CrossRef
go back to reference Farmer I, Glossop N (1980) Mechanics of disc cutter penetration. Tunn Tunn 12(6):22–25 Farmer I, Glossop N (1980) Mechanics of disc cutter penetration. Tunn Tunn 12(6):22–25
go back to reference Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Space Technol 30:110–123CrossRef Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Space Technol 30:110–123CrossRef
go back to reference Ghasemi E, Yagiz S, Ataei M (2014) Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic. Bull Eng Geol Environ 73(1):23–35CrossRef Ghasemi E, Yagiz S, Ataei M (2014) Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic. Bull Eng Geol Environ 73(1):23–35CrossRef
go back to reference Gong Q, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46(1):8–18CrossRef Gong Q, Zhao J (2009) Development of a rock mass characteristics model for TBM penetration rate prediction. Int J Rock Mech Min Sci 46(1):8–18CrossRef
go back to reference Gong Q, Zhao J, Jiang Y (2007) In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels. Tunn Undergr Space Technol 22(3):303–316CrossRef Gong Q, Zhao J, Jiang Y (2007) In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels. Tunn Undergr Space Technol 22(3):303–316CrossRef
go back to reference Hamilton W, Dollinger G (1979) Optimizing tunnel boring machine and cutter design for greater boreability. RETC Proc Atlanta 1:280–296 Hamilton W, Dollinger G (1979) Optimizing tunnel boring machine and cutter design for greater boreability. RETC Proc Atlanta 1:280–296
go back to reference Hassanpour J, Rostami J, Khamehchiyan M, Bruland A (2009) Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel. Geomech Geoengin Int J 4(4):287–297CrossRef Hassanpour J, Rostami J, Khamehchiyan M, Bruland A (2009) Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel. Geomech Geoengin Int J 4(4):287–297CrossRef
go back to reference Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli H (2010) TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43(4):427–445CrossRef Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli H (2010) TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43(4):427–445CrossRef
go back to reference Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Space Technol 26(5):595–603CrossRef Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Space Technol 26(5):595–603CrossRef
go back to reference Imensazan Consulting Co. (2006) Engineering Gelogical report of Golab Tunnel Imensazan Consulting Co. (2006) Engineering Gelogical report of Golab Tunnel
go back to reference Innaurato N, Mancini A, Rondena E, Zaninetti A (1991) Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy. 7th ISRM Congress Innaurato N, Mancini A, Rondena E, Zaninetti A (1991) Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy. 7th ISRM Congress
go back to reference Kahraman S (2002) Correlation of TBM and drilling machine performances with rock brittleness. Eng Geol 65(4):269–283CrossRef Kahraman S (2002) Correlation of TBM and drilling machine performances with rock brittleness. Eng Geol 65(4):269–283CrossRef
go back to reference Khademi Hamidi J, Shahriar K, Rezai B, Rostami J (2010) Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunn Undergr Space Technol 25(4):333–345CrossRef Khademi Hamidi J, Shahriar K, Rezai B, Rostami J (2010) Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunn Undergr Space Technol 25(4):333–345CrossRef
go back to reference Nelson P, Ingraffea A, O’Rourke T (1985) TBM performance prediction using rock fracture parameters. Int J Rock Mech Min Sci Geomech Abstr, Elsevier Nelson P, Ingraffea A, O’Rourke T (1985) TBM performance prediction using rock fracture parameters. Int J Rock Mech Min Sci Geomech Abstr, Elsevier
go back to reference Ozdemir L, Wang F-D (1979) Mechanical tunnel boring prediction and machine design. NASA STI/Recon Tech Rep N 80:16239 Ozdemir L, Wang F-D (1979) Mechanical tunnel boring prediction and machine design. NASA STI/Recon Tech Rep N 80:16239
go back to reference Ramamurthy T (2008) Penetration rate of TBMs. World Tunnel Congress Ramamurthy T (2008) Penetration rate of TBMs. World Tunnel Congress
go back to reference Ribacchi R, Fazio AL (2005) Influence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel). Rock Mech Rock Eng 38(2):105–127CrossRef Ribacchi R, Fazio AL (2005) Influence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel). Rock Mech Rock Eng 38(2):105–127CrossRef
go back to reference Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure, Colorado School of Mines Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure, Colorado School of Mines
go back to reference Rostami J (2016) Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground. Tunn Undergr Space Technol 57:173–182CrossRef Rostami J (2016) Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground. Tunn Undergr Space Technol 57:173–182CrossRef
go back to reference Rostami J, Ozdemir L (1993) A new model for performance prediction of hard rock TBMs. In: Proceedings of the Rapid Excavation and Tunneling Conference, SOCIETY FOR MINING, METALLOGY & EXPLORATION, INC Rostami J, Ozdemir L (1993) A new model for performance prediction of hard rock TBMs. In: Proceedings of the Rapid Excavation and Tunneling Conference, SOCIETY FOR MINING, METALLOGY & EXPLORATION, INC
go back to reference Rostami J, Ozdemir L, Nilson B (1996) Comparison between CSM and NTH hard rock TBM performance prediction models. In: Proceedings of Institute of Shaft Drilling Technology (ISDT) annual technical conference Rostami J, Ozdemir L, Nilson B (1996) Comparison between CSM and NTH hard rock TBM performance prediction models. In: Proceedings of Institute of Shaft Drilling Technology (ISDT) annual technical conference
go back to reference Roxborough FF, Phillips HR (1975) Rock excavation by disc cutter. Int J Rock Mech Min Sci Geomech Abstr, Elsevier Roxborough FF, Phillips HR (1975) Rock excavation by disc cutter. Int J Rock Mech Min Sci Geomech Abstr, Elsevier
go back to reference Sanio H (1985) Prediction of the performance of disc cutters in anisotropic rock. Int J Rock Mech Min Sci Geomech Abstr, Elsevier Sanio H (1985) Prediction of the performance of disc cutters in anisotropic rock. Int J Rock Mech Min Sci Geomech Abstr, Elsevier
go back to reference Sapigni M, Berti M, Bethaz E, Busillo A, Cardone G (2002) TBM performance estimation using rock mass classifications. Int J Rock Mech Min Sci 39(6):771–788CrossRef Sapigni M, Berti M, Bethaz E, Busillo A, Cardone G (2002) TBM performance estimation using rock mass classifications. Int J Rock Mech Min Sci 39(6):771–788CrossRef
go back to reference Sato K, Gong F, Itakura K (1991). Prediction of disc cutter performance using a circular rock cutting ring. In: Proceedings 1st international mine mechanization and automation symposium Sato K, Gong F, Itakura K (1991). Prediction of disc cutter performance using a circular rock cutting ring. In: Proceedings 1st international mine mechanization and automation symposium
go back to reference Shaterpour A, Tumac D, Avunduk E (2016) Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey. Bull Eng Geol Environ 75(1):251–262CrossRef Shaterpour A, Tumac D, Avunduk E (2016) Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey. Bull Eng Geol Environ 75(1):251–262CrossRef
go back to reference Snowdon R, Ryley M, Temporal J (1982) A study of disc cutting in selected British rocks. Int J Rock Mech Min Sci Geomech Abstr, Elsevier Snowdon R, Ryley M, Temporal J (1982) A study of disc cutting in selected British rocks. Int J Rock Mech Min Sci Geomech Abstr, Elsevier
go back to reference Sundaram N, Rafek A, Komoo I (1998). The influence of rock mass properties in the assessment of TBM performance. In: Proceedings of the Eighth IAEG Congress, Vancouver, Balkema Sundaram N, Rafek A, Komoo I (1998). The influence of rock mass properties in the assessment of TBM performance. In: Proceedings of the Eighth IAEG Congress, Vancouver, Balkema
go back to reference Sundin N-O, Wanstedt S (1994) A boreability model for TBM’s. rock mechanics models and measurements challenges from industry. In: Proceedings of the 1st North American Rock Mechanics Symposium, The University of Texas at Austin, Balkema, Rotterdam Sundin N-O, Wanstedt S (1994) A boreability model for TBM’s. rock mechanics models and measurements challenges from industry. In: Proceedings of the 1st North American Rock Mechanics Symposium, The University of Texas at Austin, Balkema, Rotterdam
go back to reference Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Space Technol 23(3):326–339CrossRef Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Space Technol 23(3):326–339CrossRef
go back to reference Yasar S, Capik M, Yilmaz AO (2015) Cuttability assessment using the drilling rate index (DRI). Bull Eng Geol Environ 74(4):1349–1361CrossRef Yasar S, Capik M, Yilmaz AO (2015) Cuttability assessment using the drilling rate index (DRI). Bull Eng Geol Environ 74(4):1349–1361CrossRef
Metadata
Title
Evaluation of TBM performance prediction models and sensitivity analysis of input parameters
Authors
Seyyed Amirasad Fatemi
Morteza Ahmadi
Jamal Rostami
Publication date
12-11-2016
Publisher
Springer Berlin Heidelberg
Published in
Bulletin of Engineering Geology and the Environment / Issue 2/2018
Print ISSN: 1435-9529
Electronic ISSN: 1435-9537
DOI
https://doi.org/10.1007/s10064-016-0967-2

Other articles of this Issue 2/2018

Bulletin of Engineering Geology and the Environment 2/2018 Go to the issue