01-06-2016 | Wasserbau
Exposed Geomembrane System at Großer Mühldorfer See Dam
Published in: WASSERWIRTSCHAFT | Issue 6/2016
Login to get accessExcerpt
Großer Mühldorfer See, a gravity dam owned by Verbund Hydro Power GmbH, will be part of Reisseck II pumped storage plant. The dam, 46.50 m high, has upstream prefabricated concrete slabs sealed with bituminous material and Kemperol strips requiring repeated repairs. A geomembrane system was installed to water tighten the dam and avoid maintenance. Among the challenges, the remote site location, the conditions of the facing and of the plinth, and the difficult climate. The article describes how design addressed such challenges and how installation was carried out to meet the objectives and deadlines. …Advertisement