Skip to main content
Top
Published in: Journal of Scheduling 4/2014

01-08-2014

Flow shop batching and scheduling with sequence-dependent setup times

Authors: Liji Shen, Jatinder N. D. Gupta, Udo Buscher

Published in: Journal of Scheduling | Issue 4/2014

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper addresses the flow shop batching and scheduling problem where sequence-dependent family setup times are present and the objective is to minimize makespan. We consider violating the group technology assumption by dividing product families into batches. In order to reduce setup times, inconsistent batches are formed on different machines, which lead to non-permutation schedules. To the best of our knowledge, this is the first time that the splitting of job families into inconsistent batches has been considered in a flow shop system. A tabu search algorithm is developed which contains several neighbourhood functions, double tabu lists and a multilevel diversification structure. Compared to the state-of-the-art meta-heuristics for this problem, the proposed tabu search algorithm achieves further improvement when the group scheduling assumption is dropped. Also, various experiments conducted on the benchmark problem instances confirm the benefits of batching. Therefore, it will be prudent for the practitioners to consider adopting inconsistent batches and non-permutation schedules to improve their operational efficiency within a reasonable amount of computational effort.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Allahverdi, A., Gupta, J., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega International Journal of Management Science, 27, 219–239.CrossRef Allahverdi, A., Gupta, J., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega International Journal of Management Science, 27, 219–239.CrossRef
go back to reference Allahverdi, A., Ng, C., Cheng, T., & Kovalyov, Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985–1032.CrossRef Allahverdi, A., Ng, C., Cheng, T., & Kovalyov, Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985–1032.CrossRef
go back to reference Angel-Bello, F., Alvarez, A., Pacheco, J., & Martnez, I. (2011a). A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times. Computers and Mathematics with Applications, 61, 797–808.CrossRef Angel-Bello, F., Alvarez, A., Pacheco, J., & Martnez, I. (2011a). A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times. Computers and Mathematics with Applications, 61, 797–808.CrossRef
go back to reference Angel-Bello, F., Alvarez, A., Pacheco, J., & Martnez, I. (2011b). A single machine scheduling problem with availability constraints and sequence-dependent setup costs. Applied Mathematical Modelling, 35, 2041–2050.CrossRef Angel-Bello, F., Alvarez, A., Pacheco, J., & Martnez, I. (2011b). A single machine scheduling problem with availability constraints and sequence-dependent setup costs. Applied Mathematical Modelling, 35, 2041–2050.CrossRef
go back to reference Battiti, R., & Giampietro, T. (1994). The reactive tabu search. ORSA Journal on Computing, 6(2), 126–140.CrossRef Battiti, R., & Giampietro, T. (1994). The reactive tabu search. ORSA Journal on Computing, 6(2), 126–140.CrossRef
go back to reference Buscher, U., & Shen, L. (2009). An integrated tabu search algorithm for the lot streaming problem in job shops. European Journal of Operational Research, 199, 385–399.CrossRef Buscher, U., & Shen, L. (2009). An integrated tabu search algorithm for the lot streaming problem in job shops. European Journal of Operational Research, 199, 385–399.CrossRef
go back to reference Campbell, H., Dudek, R., & Simth, M. (1970). A heuristic algorithm for the n job m machine sequencing problem. Management Science, 16(10), B630–B637.CrossRef Campbell, H., Dudek, R., & Simth, M. (1970). A heuristic algorithm for the n job m machine sequencing problem. Management Science, 16(10), B630–B637.CrossRef
go back to reference Cheng, T., Gupta, J., & Wang, G. (2000). A review of flowshop scheduling research with setup times. Production and Operations Management, 9, 262–282.CrossRef Cheng, T., Gupta, J., & Wang, G. (2000). A review of flowshop scheduling research with setup times. Production and Operations Management, 9, 262–282.CrossRef
go back to reference Franca, P., Gupta, J., Mendes, A., Moscato, P., & Veltink, K. (2005). Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering, 48, 491–506.CrossRef Franca, P., Gupta, J., Mendes, A., Moscato, P., & Veltink, K. (2005). Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering, 48, 491–506.CrossRef
go back to reference Frazier, G. (1996). An evaluation of group scheduling heuristics in a flow-line manufacturing cell. International Journal of Production Research, 34(4), 959–976.CrossRef Frazier, G. (1996). An evaluation of group scheduling heuristics in a flow-line manufacturing cell. International Journal of Production Research, 34(4), 959–976.CrossRef
go back to reference Gupta, J. (1979). A review of flowshop scheduling research. In Disaggregation problems in manufacturing and service organizations (pp. 363–388). The Hague: Martin Nijhoff. Gupta, J. (1979). A review of flowshop scheduling research. In Disaggregation problems in manufacturing and service organizations (pp. 363–388). The Hague: Martin Nijhoff.
go back to reference Gupta, J., & Darrow, W. (1986). The two-machine sequence dependent flowshop scheduling problem. European Journal of Operational Research, 24, 439–446.CrossRef Gupta, J., & Darrow, W. (1986). The two-machine sequence dependent flowshop scheduling problem. European Journal of Operational Research, 24, 439–446.CrossRef
go back to reference Gupta, J., & Stafford, E. F. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169, 699–711.CrossRef Gupta, J., & Stafford, E. F. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169, 699–711.CrossRef
go back to reference Hendizadeh, S., Faramarzi, H., Mansouri, S., Gupta, J., & Eimekkawy, T. (2008). Mata-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111, 593–605.CrossRef Hendizadeh, S., Faramarzi, H., Mansouri, S., Gupta, J., & Eimekkawy, T. (2008). Mata-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111, 593–605.CrossRef
go back to reference Lin, S., Gupta, J., Ying, K. & Lee, Z. (2009). Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times. International Journal of Production Research, 47, 3205–3217. Lin, S., Gupta, J., Ying, K. & Lee, Z. (2009). Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times. International Journal of Production Research, 47, 3205–3217.
go back to reference Lin, S., Ying, K., & Lee, Z. (2009). Metaheuristics for scheduling a non-permutation flowshop manufacturing cell with sequence dependent family setup times. Computers and Operations Research, 36, 1110–1121.CrossRef Lin, S., Ying, K., & Lee, Z. (2009). Metaheuristics for scheduling a non-permutation flowshop manufacturing cell with sequence dependent family setup times. Computers and Operations Research, 36, 1110–1121.CrossRef
go back to reference Logendran, R., de Szoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102, 66–86.CrossRef Logendran, R., de Szoeke, P., & Barnard, F. (2006). Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102, 66–86.CrossRef
go back to reference Monma, C., & Potts, C. (1989). On the complexity of scheduling with batch setups. Operations Research, 37, 798–804.CrossRef Monma, C., & Potts, C. (1989). On the complexity of scheduling with batch setups. Operations Research, 37, 798–804.CrossRef
go back to reference Mosheiov, G., Oron, D., & Ritov, Y. (2004). Flow-shop batching scheduling with identical processing-time jobs. Naval Research Logistics, 51, 783–799.CrossRef Mosheiov, G., Oron, D., & Ritov, Y. (2004). Flow-shop batching scheduling with identical processing-time jobs. Naval Research Logistics, 51, 783–799.CrossRef
go back to reference Nawaz, M., Enscore, E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. OMEGA International Journal of Management Science, 11, 91–95. Nawaz, M., Enscore, E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. OMEGA International Journal of Management Science, 11, 91–95.
go back to reference Nowicki, E., & Smutnicki, C. (1996). A fast taboo search algorithm for the job shop problem. Management Science, 42(6), 797–813. Nowicki, E., & Smutnicki, C. (1996). A fast taboo search algorithm for the job shop problem. Management Science, 42(6), 797–813.
go back to reference Pacheco, J., Angel-Bello, F., Alvarez, A. (2013). A multi-start tabu search method for a single machine scheduling problem with periodic maintenance and sequence-dependent setup times. Journal of Scheduling, 16(6), 661–673. doi:10.1007/s10951-012-0280-2. Pacheco, J., Angel-Bello, F., Alvarez, A. (2013). A multi-start tabu search method for a single machine scheduling problem with periodic maintenance and sequence-dependent setup times. Journal of Scheduling, 16(6), 661–673. doi:10.​1007/​s10951-012-0280-2.
go back to reference Reddy, V., & Narendran, T. (2003). Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41, 193–206.CrossRef Reddy, V., & Narendran, T. (2003). Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41, 193–206.CrossRef
go back to reference Ruben, R., Mosier, C., & Mahmoodi, F. (1993). A comprehensive analysis of group scheduling heuristics in a job shop cell. International Journal of Production Research, 31, 1343–1369.CrossRef Ruben, R., Mosier, C., & Mahmoodi, F. (1993). A comprehensive analysis of group scheduling heuristics in a job shop cell. International Journal of Production Research, 31, 1343–1369.CrossRef
go back to reference Schaller, J., Gupta, J., & Vakharia, A. (2000). Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125, 324–339.CrossRef Schaller, J., Gupta, J., & Vakharia, A. (2000). Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125, 324–339.CrossRef
go back to reference Shen, L., Mönch, L., Buscher, U. (2013a). A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups. Journal of Scheduling. doi:10.1007/s10951-013-0315-3. Shen, L., Mönch, L., Buscher, U. (2013a). A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups. Journal of Scheduling. doi:10.​1007/​s10951-013-0315-3.
go back to reference Shen, L., Mönch, L., Buscher, U. (2013b). An iterative approach for the serial batching problem with parallel machines and job families. Annals of Operations Research, 206(1), 425–448. doi:10.1007/s10479-013-1339-y. Shen, L., Mönch, L., Buscher, U. (2013b). An iterative approach for the serial batching problem with parallel machines and job families. Annals of Operations Research, 206(1), 425–448. doi:10.​1007/​s10479-013-1339-y.
go back to reference Ying, K., Gupta, J., Lin, S. & Lee, Z. (2010). Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups. International Journal of Production Research, 48(8), 2169–2184. Ying, K., Gupta, J., Lin, S. & Lee, Z. (2010). Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups. International Journal of Production Research, 48(8), 2169–2184.
go back to reference Ying, K., Lin, S., & Lee, Z. (2012). Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence dependent family setups. International Journal of Advanced Manufacturing Technology, 58, 671–682.CrossRef Ying, K., Lin, S., & Lee, Z. (2012). Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence dependent family setups. International Journal of Advanced Manufacturing Technology, 58, 671–682.CrossRef
Metadata
Title
Flow shop batching and scheduling with sequence-dependent setup times
Authors
Liji Shen
Jatinder N. D. Gupta
Udo Buscher
Publication date
01-08-2014
Publisher
Springer US
Published in
Journal of Scheduling / Issue 4/2014
Print ISSN: 1094-6136
Electronic ISSN: 1099-1425
DOI
https://doi.org/10.1007/s10951-014-0369-x

Other articles of this Issue 4/2014

Journal of Scheduling 4/2014 Go to the issue