Skip to main content
Top
Published in:
Cover of the book

2017 | OriginalPaper | Chapter

Hard Planning and Scheduling Problems in the Digital Factory

Authors : Tamás Kis, Márton Drótos

Published in: Math for the Digital Factory

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Production planning and scheduling with the aid of software tools in today’s manufacturing industries have become a common practice which is indispensable for providing high level customer service, and at the same time to utilize the production resources, like workforce, machine tools, raw materials, energy, etc., efficiently. To meet the new requirements, problem modeling tools, optimization techniques, and visualization of data and results have become part of the software packages. In this chapter some recent developments in problem modeling and optimization techniques applied to important and challenging industrial planning and scheduling problems are presented. We will focus on new problem areas which are still at the edge of current theoretical research, but they are motivated by practical needs. On the one hand, we will discuss project based production planning, and on the other hand, we will tackle a resource leveling problems in a machine environment. We will present the problems, some modeling and solution approaches, and various extensions and applications.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Alfieri, A., Tolio, T., Urgo, M.: A project scheduling approach to production planning with feeding precedence relations. Int. J. Prod. Res. 49, 995–1020 (2011)CrossRef Alfieri, A., Tolio, T., Urgo, M.: A project scheduling approach to production planning with feeding precedence relations. Int. J. Prod. Res. 49, 995–1020 (2011)CrossRef
2.
go back to reference Ballestín, F., Schwindt, C., Zimmermann, J.: Resource leveling in make-to-order production: modeling and heuristic solution method. Int. J. Oper. Res. 4, 50–62 (2007)MATH Ballestín, F., Schwindt, C., Zimmermann, J.: Resource leveling in make-to-order production: modeling and heuristic solution method. Int. J. Oper. Res. 4, 50–62 (2007)MATH
3.
go back to reference Barnhart, C., Johnson, E.E., Nemhauser, G.E., Savelsbergh, M.W.P., Vance, P.H.: Branch-and-price: column generation for solving huge integer programs. Oper. Res. 46, 316–329 (1998)CrossRefMathSciNetMATH Barnhart, C., Johnson, E.E., Nemhauser, G.E., Savelsbergh, M.W.P., Vance, P.H.: Branch-and-price: column generation for solving huge integer programs. Oper. Res. 46, 316–329 (1998)CrossRefMathSciNetMATH
4.
go back to reference Bianco, L., Caramia, M.: Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. 4OR-Q. J. Oper. Res. 9, 371–389 (2011) Bianco, L., Caramia, M.: Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. 4OR-Q. J. Oper. Res. 9, 371–389 (2011)
5.
go back to reference Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Handbook on Scheduling. From Theory to Applications. Springer, Berlin (2007)MATH Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Handbook on Scheduling. From Theory to Applications. Springer, Berlin (2007)MATH
6.
go back to reference Bracht, U., Masurat, T.: The digital factory between vision and reality. Comput. Ind. 56 325–333 (2005)CrossRef Bracht, U., Masurat, T.: The digital factory between vision and reality. Comput. Ind. 56 325–333 (2005)CrossRef
7.
go back to reference Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)MATH Brucker, P.: Scheduling Algorithms, 5th edn. Springer, Berlin (2007)MATH
8.
go back to reference de Boer, R., Schutten, J.M.J.: Multi-project rough-cut capacity planning. In: Ashayeri, J., Sullivan, W.G., Munir Ahmad, M. (eds.) Flexible Automation and Intelligent Manufacturing, pp. 631–644, Begell House, New York (1999) de Boer, R., Schutten, J.M.J.: Multi-project rough-cut capacity planning. In: Ashayeri, J., Sullivan, W.G., Munir Ahmad, M. (eds.) Flexible Automation and Intelligent Manufacturing, pp. 631–644, Begell House, New York (1999)
9.
go back to reference Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. International Series in Operations Research & Management Science, vol. 49 (Kluwer Academic, Dordrecht, 2002) Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. International Series in Operations Research & Management Science, vol. 49 (Kluwer Academic, Dordrecht, 2002)
11.
go back to reference Easa, S.M.: Resource leveling in construction by optimization. J. Constr. Eng. Manag. 115, 302–316 (1998)CrossRef Easa, S.M.: Resource leveling in construction by optimization. J. Constr. Eng. Manag. 115, 302–316 (1998)CrossRef
12.
go back to reference Gademann, N., Schutten, M.: Linear-programming-based heuristics for project capacity planning. IIE Trans. 37, 153–165 (2005)CrossRef Gademann, N., Schutten, M.: Linear-programming-based heuristics for project capacity planning. IIE Trans. 37, 153–165 (2005)CrossRef
13.
go back to reference Gahm, C., Dünnwald, B., Sahamie, R.: A multi-criteria master production scheduling approach for special purpose machinery. Int. J. Prod. Econ. 149, 89–101 (2014)CrossRef Gahm, C., Dünnwald, B., Sahamie, R.: A multi-criteria master production scheduling approach for special purpose machinery. Int. J. Prod. Econ. 149, 89–101 (2014)CrossRef
14.
go back to reference Hans, E.W.: Resource loading by branch-and-price techniques. Ph.D. Thesis, Twente University Press (2001) Hans, E.W.: Resource loading by branch-and-price techniques. Ph.D. Thesis, Twente University Press (2001)
15.
go back to reference Kis, T.: A branch-and-cut algorithm for scheduling of projects with variable intensity activities. Math. Program. 103, 515–539 (2005)CrossRefMathSciNetMATH Kis, T.: A branch-and-cut algorithm for scheduling of projects with variable intensity activities. Math. Program. 103, 515–539 (2005)CrossRefMathSciNetMATH
16.
go back to reference Kis, T.: RCPS with variable intensity activities and feeding precedence constraints, In: Józefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 105–129. Springer, New York (2006) Kis, T.: RCPS with variable intensity activities and feeding precedence constraints, In: Józefowska, J., Weglarz, J. (eds.) Perspectives in Modern Project Scheduling, pp. 105–129. Springer, New York (2006)
17.
go back to reference Monostori, L.: Cyber-physical production systems: roots, expectations and R&D challenges. Proc. CIRP 17 9–13 (2014)CrossRef Monostori, L.: Cyber-physical production systems: roots, expectations and R&D challenges. Proc. CIRP 17 9–13 (2014)CrossRef
18.
go back to reference Naber, A., Kolisch, R.: MIP models for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 239, 335–348 (2014)CrossRefMathSciNetMATH Naber, A., Kolisch, R.: MIP models for resource-constrained project scheduling with flexible resource profiles. Eur. J. Oper. Res. 239, 335–348 (2014)CrossRefMathSciNetMATH
19.
go back to reference Neuamm, K., Zimmermann, J.: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur. J. Oper. Res. 127, 425–443 (2000)CrossRefMATH Neuamm, K., Zimmermann, J.: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. Eur. J. Oper. Res. 127, 425–443 (2000)CrossRefMATH
20.
go back to reference Rager, M., Gahm, C., Denz, F.: Energy-oriented scheduling based on evolutionary algorithms. Comput. Oper. Res. 54, 218–231 (2015)CrossRefMathSciNetMATH Rager, M., Gahm, C., Denz, F.: Energy-oriented scheduling based on evolutionary algorithms. Comput. Oper. Res. 54, 218–231 (2015)CrossRefMathSciNetMATH
21.
go back to reference Ranjbar, M.: A path-relinking metaheuristic for the resource levelling problem. J. Oper. Res. Soc. 64, 1071–1078 (2013)CrossRef Ranjbar, M.: A path-relinking metaheuristic for the resource levelling problem. J. Oper. Res. Soc. 64, 1071–1078 (2013)CrossRef
22.
go back to reference Wolsey, L.A.: Integer Programming. Wiley-Interscience Series in Discrete Mathematics and Optimization. Wiley, New York (1998)MATH Wolsey, L.A.: Integer Programming. Wiley-Interscience Series in Discrete Mathematics and Optimization. Wiley, New York (1998)MATH
23.
go back to reference Wörn, H., Frey, D., Keitel, J.: Digital factory – planning and running enterprises of the future. In: Proceedings of IECON 2000, 26th Annual symposium of the IEEE, Nagoya, 22 Oct 2000–28 Oct 2000, vol 2, pp. 1286–1291 Wörn, H., Frey, D., Keitel, J.: Digital factory – planning and running enterprises of the future. In: Proceedings of IECON 2000, 26th Annual symposium of the IEEE, Nagoya, 22 Oct 2000–28 Oct 2000, vol 2, pp. 1286–1291
24.
go back to reference Wullink, G.: Resource loading under uncertainty. PhD Thesis, Twente University Press (2005) Wullink, G.: Resource loading under uncertainty. PhD Thesis, Twente University Press (2005)
Metadata
Title
Hard Planning and Scheduling Problems in the Digital Factory
Authors
Tamás Kis
Márton Drótos
Copyright Year
2017
DOI
https://doi.org/10.1007/978-3-319-63957-4_1