Skip to main content
Top

2018 | OriginalPaper | Chapter

High-Speed Railway Timetable Rescheduling Method: A Bi-level Integrated Programming Approach

Authors : Huiru Zhang, Limin Jia, Li Wang, Yong Qin, Min An

Published in: Proceedings of the 3rd International Conference on Electrical and Information Technologies for Rail Transportation (EITRT) 2017

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

China’s railway has experienced a large-scale development in the recent years. Making up for delay time considering the energy efficiency when the train is delayed, which can satisfy the travel demand for passengers and save rail energy costs at the same time, will become the focus of future research on the railway. A bi-level programming optimization model is proposed in this paper. In the upper layer, the high-speed railway timetable is adjusted under unexpected interferences, and then the energy saving is optimized in the lower layer. A real-world case study is presented to illustrate the validity of the model and algorithm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Szpigel B (1973) Optimal train scheduling on a single track railway. Oper Res 72:343–352 Szpigel B (1973) Optimal train scheduling on a single track railway. Oper Res 72:343–352
2.
go back to reference Zhang Y, Jin W (2005) Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. J Southwest Jiaotong Univ 40(2):147–152 (in Chinese) Zhang Y, Jin W (2005) Model and algorithm for train operation adjustment on single-track railways based on genetic algorithm. J Southwest Jiaotong Univ 40(2):147–152 (in Chinese)
3.
go back to reference Corman F, D’Ariano A, Pacciarelli D, Pranzo M (2012) Bi-objective conflict detection and resolution in railway traffic management. Transp Res Part C 20(1):79–94CrossRef Corman F, D’Ariano A, Pacciarelli D, Pranzo M (2012) Bi-objective conflict detection and resolution in railway traffic management. Transp Res Part C 20(1):79–94CrossRef
4.
go back to reference Almodóvar M, García-Ródenas R (2013) On-line reschedule optimization for passenger railways in case of emergencies. Comput Oper Res 40(3):725–736CrossRefMATH Almodóvar M, García-Ródenas R (2013) On-line reschedule optimization for passenger railways in case of emergencies. Comput Oper Res 40(3):725–736CrossRefMATH
5.
go back to reference Wong K, Ho T (2007) Dwell time and run-time Control for DC mass rapid transit railways. IET Electr Power App 1(6):956–966CrossRef Wong K, Ho T (2007) Dwell time and run-time Control for DC mass rapid transit railways. IET Electr Power App 1(6):956–966CrossRef
6.
go back to reference Su S, Li S, Tang T et al (2013) A subway train timetable optimization approach based on energy-efficient operation strategy. IEEE Trans Intell Transp Syst 14(2):883–893CrossRef Su S, Li S, Tang T et al (2013) A subway train timetable optimization approach based on energy-efficient operation strategy. IEEE Trans Intell Transp Syst 14(2):883–893CrossRef
7.
go back to reference Wang T, Chen F, Zhang Q (2014) Method of energy-saving operation diagram compiling for train operation dispatch of high-speed railway. Railway Comput Appl 23(12):5–8 (in Chinese) Wang T, Chen F, Zhang Q (2014) Method of energy-saving operation diagram compiling for train operation dispatch of high-speed railway. Railway Comput Appl 23(12):5–8 (in Chinese)
8.
go back to reference Li X, Hong K (2014) An energy-efficient scheduling and speed control approach for metro rail operations. Transp Res Part B 64:73–89CrossRef Li X, Hong K (2014) An energy-efficient scheduling and speed control approach for metro rail operations. Transp Res Part B 64:73–89CrossRef
9.
go back to reference Yang X, Anthony C, Bin N et al (2016) A stochastic model for the integrated optimization on metro timetable and speed profile with uncertain train mass. Transp Res Part B 91:424–445CrossRef Yang X, Anthony C, Bin N et al (2016) A stochastic model for the integrated optimization on metro timetable and speed profile with uncertain train mass. Transp Res Part B 91:424–445CrossRef
Metadata
Title
High-Speed Railway Timetable Rescheduling Method: A Bi-level Integrated Programming Approach
Authors
Huiru Zhang
Limin Jia
Li Wang
Yong Qin
Min An
Copyright Year
2018
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-7989-4_65

Premium Partner