Skip to main content
Top

2024 | OriginalPaper | Chapter

How to Prioritize Replenishment Orders in Demand Driven MRP: A Simulation Study

Authors : Nuno O. Fernandes, Nelson Guedes, Matthias Thürer, Luis P. Ferreira, Paulo Ávila

Published in: Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems

Publisher: Springer Nature Switzerland

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Demand Driven Material Requirements Planning (DDMRP) assumes that a production order is generated for replenishment when the inventory position, given by the net flow equation, is below a given level. Literature on this production planning and control system suggests prioritizing open orders on the shop floor based on the inventory buffer status. However, the performance of buffer-oriented priority dispatching largely remains unknown. Using discrete event simulation, this study suggests that buffer-oriented dispatching based on the net flow equation outperforms due date-oriented dispatching rules and first-come-first-served. The performance impact depends, however, on the reorder quantity associated with the production orders. These results have important implications for industrial practice.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Azzamouri, A., Baptiste, P., Pellerin, R., Dessevre, G.: Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method. Int. J. Prod. Res. (2022) Azzamouri, A., Baptiste, P., Pellerin, R., Dessevre, G.: Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method. Int. J. Prod. Res. (2022)
go back to reference Blackstone, J.H., Philips, D.T., Hogg, G.L.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982)CrossRef Blackstone, J.H., Philips, D.T., Hogg, G.L.: A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1), 27–45 (1982)CrossRef
go back to reference Dessevre, G., Martin, G., Pierre, B., Lamothe, J., Pellerin, R., Lauras, M.: Decoupled lead time in finite capacity flowshop: a feedback loop approach. In: The 8th International Conference on Industrial Engineering and Systems Management, Shangai, China (2019) Dessevre, G., Martin, G., Pierre, B., Lamothe, J., Pellerin, R., Lauras, M.: Decoupled lead time in finite capacity flowshop: a feedback loop approach. In: The 8th International Conference on Industrial Engineering and Systems Management, Shangai, China (2019)
go back to reference Jodlbauer, H., Huber, A.: Service-level performance of MRP, kanban, CONWIP, and DBR due to parameter stability and environmental robustness. Int. J. Prod. Res. 46(8), 2179–2195 (2008)CrossRef Jodlbauer, H., Huber, A.: Service-level performance of MRP, kanban, CONWIP, and DBR due to parameter stability and environmental robustness. Int. J. Prod. Res. 46(8), 2179–2195 (2008)CrossRef
go back to reference Kanet, J.J., Hayya, J.C.: Priority dispatching with operation due dates in a job shop. J. Oper. Manag. 2(3), 167–175 (1982)CrossRef Kanet, J.J., Hayya, J.C.: Priority dispatching with operation due dates in a job shop. J. Oper. Manag. 2(3), 167–175 (1982)CrossRef
go back to reference Lee, C.J., Rim, S.C.: A mathematical safety stock model for DDMRP inventory replenishment. Math. Probl. Eng. (2019) Lee, C.J., Rim, S.C.: A mathematical safety stock model for DDMRP inventory replenishment. Math. Probl. Eng. (2019)
go back to reference Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)CrossRef Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)CrossRef
go back to reference Panwalker, S.S., Iskander, W.: A survey of scheduling rules. Oper. Res., 45–61 (1977) Panwalker, S.S., Iskander, W.: A survey of scheduling rules. Oper. Res., 45–61 (1977)
go back to reference Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk (2016) Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk (2016)
go back to reference Ptak, C., Smith, C.: Orlicky’s Material Requirements Planning 3/E. McGraw Hill Professional, New York (2011) Ptak, C., Smith, C.: Orlicky’s Material Requirements Planning 3/E. McGraw Hill Professional, New York (2011)
go back to reference Thürer, M., Fernandes, N.O., Stevenson, M.: Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation. Int. J. Prod. Res. 60(3), 1036–1050 (2022)CrossRef Thürer, M., Fernandes, N.O., Stevenson, M.: Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation. Int. J. Prod. Res. 60(3), 1036–1050 (2022)CrossRef
Metadata
Title
How to Prioritize Replenishment Orders in Demand Driven MRP: A Simulation Study
Authors
Nuno O. Fernandes
Nelson Guedes
Matthias Thürer
Luis P. Ferreira
Paulo Ávila
Copyright Year
2024
DOI
https://doi.org/10.1007/978-3-031-38165-2_12

Premium Partner