Skip to main content
Top

2021 | OriginalPaper | Chapter

Hybrid Model Based on PPP and EPC Contracts

Authors : Rahul Rajasekharan, Shibi Varghese

Published in: Proceedings of SECON 2020

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Public Private Partnership (PPP) was introduced in India as a viable project implementation mechanism to meet the growing demand for new and better infrastructure services. Rise of non-performing assets accompanied by high risk at various stages of PPP made government adopt Engineering, procurement, and construction (EPC) contracts. Based on poor performance and failing to meet the deliverables of EPC projects, a Hybrid model based on PPP and EPC is necessary. In this study failure factors in PPP and EPC projects is identified, analyzed and ranked using multivariate factor analysis and Delphi technique. To develop a Hybrid model, a systematic research approach (literature review and interviews with experts and experienced practitioners) has been taken to understand infrastructure projects. The findings can be used to create a Hybrid model obtained by eliminating highly occurring failure factors in EPC and PPP projects in India.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Liyanage C, Villalba-Romero F (2015) Measuring success of PPP transport projects: a cross-case analysis of toll roads. Transp Rev: A Trans Transdiscipl J 35(2):140–161CrossRef Liyanage C, Villalba-Romero F (2015) Measuring success of PPP transport projects: a cross-case analysis of toll roads. Transp Rev: A Trans Transdiscipl J 35(2):140–161CrossRef
2.
go back to reference Ajit Kumar Sinha and Kumar Neeraj Jha (2020) Dispute resolution and litigation in PPP road projects: evidence from select cases. J Leg Aff Disput Resolut Eng Constr 12 Ajit Kumar Sinha and Kumar Neeraj Jha (2020) Dispute resolution and litigation in PPP road projects: evidence from select cases. J Leg Aff Disput Resolut Eng Constr 12
3.
go back to reference Nallathiga R, Shaikh HD, Shaikh TF, Sheik FA (2017) Factors affecting the success/failure of road infrastructure projects under PPP in India. KICEM J Constr Eng Proj Manag 7 Nallathiga R, Shaikh HD, Shaikh TF, Sheik FA (2017) Factors affecting the success/failure of road infrastructure projects under PPP in India. KICEM J Constr Eng Proj Manag 7
4.
go back to reference Kumar L, Jindala A, Velaga NR (2018) Financial risk assessment and modelling of PPP based Indian highway infrastructure projects. Transp Policy 62:2–11CrossRef Kumar L, Jindala A, Velaga NR (2018) Financial risk assessment and modelling of PPP based Indian highway infrastructure projects. Transp Policy 62:2–11CrossRef
5.
go back to reference Mahalingam Ashwin (2010) PPP experiences in Indian cities: barriers, enablers, and the way forward. J Constr Eng Manag 136:419–429CrossRef Mahalingam Ashwin (2010) PPP experiences in Indian cities: barriers, enablers, and the way forward. J Constr Eng Manag 136:419–429CrossRef
6.
go back to reference Soomro MA, Zhang X (2013) Roles of private-sector partners in transportation public-private partnership failures. J Manag Eng 34 Soomro MA, Zhang X (2013) Roles of private-sector partners in transportation public-private partnership failures. J Manag Eng 34
7.
go back to reference Shen W, Tang W, Yu W, Duffield CF, Hui FKP, Wei Y, Fang Jun (2017) Causes of contractors’ claims in international engineering-procurement-construction projects. J Civ Eng Manag 23:727–729CrossRef Shen W, Tang W, Yu W, Duffield CF, Hui FKP, Wei Y, Fang Jun (2017) Causes of contractors’ claims in international engineering-procurement-construction projects. J Civ Eng Manag 23:727–729CrossRef
8.
go back to reference Sadeghi B, Mortaheb MM, Kashani, H (2016) Identification of recurring EPC contract risks and mitigation Strategies’. In: 52nd ASC annual international conference proceedings, Tehran, 2016 Sadeghi B, Mortaheb MM, Kashani, H (2016) Identification of recurring EPC contract risks and mitigation Strategies’. In: 52nd ASC annual international conference proceedings, Tehran, 2016
9.
go back to reference Assaf S, Hassanain MA, Al-Zahrani S (2015) Causes of contractors’ failure in industrial projects in Saudi Arabia. Res J Appl Sci, Eng Technol 9:158–164CrossRef Assaf S, Hassanain MA, Al-Zahrani S (2015) Causes of contractors’ failure in industrial projects in Saudi Arabia. Res J Appl Sci, Eng Technol 9:158–164CrossRef
10.
go back to reference Podile V, Janardana Rao N (2017) Swiss challenge method—an innovative public private partnership model in India. Asian J Res Bus Econ Manag 7(7):384–390 Podile V, Janardana Rao N (2017) Swiss challenge method—an innovative public private partnership model in India. Asian J Res Bus Econ Manag 7(7):384–390
11.
go back to reference Love PED, Sing C-P, Carey B, Kim JT (2015) Estimating construction contingency: accommodating the potential for cost overruns in road construction projects. J Infrastructure Syst 21, 2 Love PED, Sing C-P, Carey B, Kim JT (2015) Estimating construction contingency: accommodating the potential for cost overruns in road construction projects. J Infrastructure Syst 21, 2
12.
go back to reference Sinha AK, Jha KN (2020) Impact of judicial overreach on PPP construction projects. J Leg Aff Disput Resolut Eng Constr 12 Sinha AK, Jha KN (2020) Impact of judicial overreach on PPP construction projects. J Leg Aff Disput Resolut Eng Constr 12
13.
go back to reference Menga X (2002) Guarantees for contractor’s performance and owner’s payment in China. J Constr Eng Manag 128:3 Menga X (2002) Guarantees for contractor’s performance and owner’s payment in China. J Constr Eng Manag 128:3
14.
go back to reference Aziz F, Rankin JH, Waugh LM (2016) Construction organizational level information management framework. J Manag Eng 32:2 Aziz F, Rankin JH, Waugh LM (2016) Construction organizational level information management framework. J Manag Eng 32:2
15.
go back to reference Osei-Kyei R, Chan APC, Dansoh A, Joseph K (2018) Strategies for effective management of unsolicited public–private partnership proposals. J Manag Eng 34:3 Osei-Kyei R, Chan APC, Dansoh A, Joseph K (2018) Strategies for effective management of unsolicited public–private partnership proposals. J Manag Eng 34:3
16.
go back to reference Hallowell MR, Gambatese JA (2010) Qualitative research: application of the Delphi method to CEM research. J Constr Eng Manag 136:1 Hallowell MR, Gambatese JA (2010) Qualitative research: application of the Delphi method to CEM research. J Constr Eng Manag 136:1
17.
go back to reference Likert R (1932) A technique for the measurement of attitudes. Arch Psychol 22:140 Likert R (1932) A technique for the measurement of attitudes. Arch Psychol 22:140
18.
go back to reference Joshi A, Kale S, Chandel S, Pal DK (2015) Likert scale: explored and explained. Bri J Appl Sci Technol 7(4):396–403 Joshi A, Kale S, Chandel S, Pal DK (2015) Likert scale: explored and explained. Bri J Appl Sci Technol 7(4):396–403
19.
go back to reference Garg S, Mahapatra D (2019) Hybrid annuity model: hamming risk allocations in Indian highway public–private partnership. J Public Aff Garg S, Mahapatra D (2019) Hybrid annuity model: hamming risk allocations in Indian highway public–private partnership. J Public Aff
Metadata
Title
Hybrid Model Based on PPP and EPC Contracts
Authors
Rahul Rajasekharan
Shibi Varghese
Copyright Year
2021
DOI
https://doi.org/10.1007/978-3-030-55115-5_74