Skip to main content
Top

2023 | OriginalPaper | Chapter

Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects

Authors : Sajjad Ali Mahmood Alkaabi, Ahmed Mohammed Raoof Mahjoob

Published in: Proceedings of Seventh International Congress on Information and Communication Technology

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Construction projects are becoming more complicated, and there are a growing number of elements that contribute to project failure. As a result, a more systematic approach to selecting an appropriate project delivery system and kind of contract is required. The selection of a construction project delivery system and type of contract greatly influences the construction project outcome and considers one of the most important factors of the construction project success. So, the present study aims to identify the key criteria of selecting the project delivery system and also identify the key criteria of selecting the type of contract of the construction project. This study used the Delphi survey and principal components analysis to achieve this aim. The results of this study showed that there are Thirteen key criteria for selecting the construction project delivery system, where the criterion of “Clarity of contractual treatments” was of the highest importance with a value of Mean is (4.334). In addition, this study identified Eleven key criteria for selecting the type of contract in the construction project, where the criterion of “Bear the risk of unexpected cost increases” was of the highest importance with a value of Mean is (4.5). While the results of applying principal components analysis on the Delphi survey outcomes showed that these criteria are most valuable on the decision-making process and there is no possibility to reduce its number.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Chen YO, Liu JY, Li B, Lin B (2011) Project delivery system selection of construction projects in China. Exp Syst Appl 38:5456–5462CrossRef Chen YO, Liu JY, Li B, Lin B (2011) Project delivery system selection of construction projects in China. Exp Syst Appl 38:5456–5462CrossRef
2.
go back to reference Lahdenperä P (2015) Project delivery systems in Finnish new building construction—a review of the last quarter century. In: 8th Nordic conference on construction economics and organization. Elsevier, Finland, pp 162–169 Lahdenperä P (2015) Project delivery systems in Finnish new building construction—a review of the last quarter century. In: 8th Nordic conference on construction economics and organization. Elsevier, Finland, pp 162–169
3.
go back to reference Hong HK, Kim JS, Kim T, Leem BH (2008) The effect of knowledge on system integration project performance. Ind Manag Data Syst 108(3):385–404CrossRef Hong HK, Kim JS, Kim T, Leem BH (2008) The effect of knowledge on system integration project performance. Ind Manag Data Syst 108(3):385–404CrossRef
4.
go back to reference Mahdi IM, Alreshaid K (2005) Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP). Int J Project Manage 23:564–572CrossRef Mahdi IM, Alreshaid K (2005) Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP). Int J Project Manage 23:564–572CrossRef
5.
go back to reference Trauner CS (2007) Construction project delivery systems and procurement practices: considerations alternatives advantages disadvantages. Trauner Consulting Services, Inc Trauner CS (2007) Construction project delivery systems and procurement practices: considerations alternatives advantages disadvantages. Trauner Consulting Services, Inc
6.
go back to reference Rwelamila PD, Edries R (2007) Project procurement competence and knowledge base of civil engineering consultants: an empirical study. J Manag Eng 23:182–192CrossRef Rwelamila PD, Edries R (2007) Project procurement competence and knowledge base of civil engineering consultants: an empirical study. J Manag Eng 23:182–192CrossRef
8.
go back to reference Design-build done right primer. Design-Build Institute of America Publication (2015) Design-build done right primer. Design-Build Institute of America Publication (2015)
9.
go back to reference Antoniou F, Aretoulis GN, Konstantinidis D, Kalfakakou GP (2012) Selection criteria used for the choice of contract type for major highway construction projects. In: Europe 2012 conference on transport research arena (TRA). Elsevier, Athens, pp 3508–3517 Antoniou F, Aretoulis GN, Konstantinidis D, Kalfakakou GP (2012) Selection criteria used for the choice of contract type for major highway construction projects. In: Europe 2012 conference on transport research arena (TRA). Elsevier, Athens, pp 3508–3517
13.
go back to reference Lever J, Krzywinski M, Altman N (2017) Points of significance: principal component analysis. Nat Methods 14(7):641–642CrossRef Lever J, Krzywinski M, Altman N (2017) Points of significance: principal component analysis. Nat Methods 14(7):641–642CrossRef
Metadata
Title
Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects
Authors
Sajjad Ali Mahmood Alkaabi
Ahmed Mohammed Raoof Mahjoob
Copyright Year
2023
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-2394-4_14