84. Influential Factors in Construction Industry of Yemen

Authors : Najib AL-Fadhali, Ng Kim Soon, Rozlin Zainal, Abd Rahman Ahmad, Abdel Hafiz Ali Hasaballah

Published in: Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Delay in the construction industry is a global phenomenon and are considered as one of the most persistent problems throughout the world. Its persistence lie in its significant cause to cost overrun which most often than not lead to abandoning the project. Although such in present more in some countries as against others, the construction industry of Yemen is no exception to it. The key controlling features of project success—time, cost, quality and safety—for a project are adversely affected by the impacts of such delays. The time extension in construction projects has many after effects among which the main are time extension, cost overrun, disputes, arbitrations and litigations. Previous studies have mostly emphasized on the major causes or the effects of project delays. The main purpose of this study is to identify the influential factors negatively affecting project successful completion on time. Using a picked set of 33 factors, this investigation at first recognized the key components influencing project completion in Yemen. A study has surrounded the reason of this survey and distributed to study. The result covers that the 5 critical factors which significantly impact to project successful completion including money cash flow during construction, the conflict between owners and other parties, delay in running bill payments for the contractor, poor project management, and slow decisions from the owner. The impact of (IF) contrarily impacts to time extension cost overrun, adversely influence to the fulfillment of the stakeholder, adversely influence to specialized specification and adversely influencing to satisfaction all meeting all the project goals/safety. These revelations are required to be basic obligations to Yemen construction industry in controlling the time and cost overpower being created.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Abdullah, M. R. (2010). Significant causes and effects of construction delay. Master thesis, University Tun Hussein Onn Malaysia Abdullah, M. R. (2010). Significant causes and effects of construction delay. Master thesis, University Tun Hussein Onn Malaysia
go back to reference Ahmed SA (2014) Evaluation of Risk Factors affecting Time And cost Of Construction Projects in Yemen. International journal of management 4(5):168–178 Ahmed SA (2014) Evaluation of Risk Factors affecting Time And cost Of Construction Projects in Yemen. International journal of management 4(5):168–178
go back to reference Al-Ansi NA (2012) Evaluating sites and services policy as approach to afford housing for low- income people in Yemen: case study. Journal of Science & Technology. 17(2):1–10 Al-Ansi NA (2012) Evaluating sites and services policy as approach to afford housing for low- income people in Yemen: case study. Journal of Science & Technology. 17(2):1–10
go back to reference Ali AS, Kamaruzzaman SN (2010) Cost performance for building construction projects in Klang valley. Journal of Building Performance 1(1):110–118 Ali AS, Kamaruzzaman SN (2010) Cost performance for building construction projects in Klang valley. Journal of Building Performance 1(1):110–118
go back to reference Al-Sabahi, M. H., Al-Hamidi, A. A., Ramly, A. & Rejab, K. M (2014). Exploring Criteria and Critical Factors for Governmental Projects Implementation in Yemen: A Case Study. Journal of Surveying, Construction and Property (JSCP), 5(2). Pp.1–17 Al-Sabahi, M. H., Al-Hamidi, A. A., Ramly, A. & Rejab, K. M (2014). Exploring Criteria and Critical Factors for Governmental Projects Implementation in Yemen: A Case Study. Journal of Surveying, Construction and Property (JSCP), 5(2). Pp.1–17
go back to reference Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–357CrossRef Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–357CrossRef
go back to reference Atkin B, Skitmore M (2008) Editorial: stakeholder management in construction. Construction Management and Economics 26(6):549–552CrossRef Atkin B, Skitmore M (2008) Editorial: stakeholder management in construction. Construction Management and Economics 26(6):549–552CrossRef
go back to reference Azhar, N., Farooqui, R. U., & Ahmed, S. M. (2008). Cost Overrun Factors In Construction Industry of Pakistan. Paper presented at the First International Conference on Construction, In Developing Countries (ICCIDC–I) “Advancing and Integrating Construction Education, Research & Practice” Azhar, N., Farooqui, R. U., & Ahmed, S. M. (2008). Cost Overrun Factors In Construction Industry of Pakistan. Paper presented at the First International Conference on Construction, In Developing Countries (ICCIDC–I) “Advancing and Integrating Construction Education, Research & Practice”
go back to reference Briner W, Hastings C, Geddes M (1997) Project Leadership. Long Range Plan 30(1):142CrossRef Briner W, Hastings C, Geddes M (1997) Project Leadership. Long Range Plan 30(1):142CrossRef
go back to reference Cleland DI, Ireland LR (1999) Project management: strategic design and implementation, vol 4. McGraw-Hill, Singapore Cleland DI, Ireland LR (1999) Project management: strategic design and implementation, vol 4. McGraw-Hill, Singapore
go back to reference Doloi, H. (2013). Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. Journal of construction engineering and management. Vol. 139, No.,pp. 267–279 Doloi, H. (2013). Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. Journal of construction engineering and management. Vol. 139, No.,pp. 267–279
go back to reference Doloi H, Iyer KC, Sawhney A (2011) Structural equation model for assessing impacts of contractor’s performance on project success. Int J Project Manage 29(6):687–695 Doloi H, Iyer KC, Sawhney A (2011) Structural equation model for assessing impacts of contractor’s performance on project success. Int J Project Manage 29(6):687–695
go back to reference Doloi H, Sawhney A, Iyer KC, Rentala S (2012) Analysing factors affecting delays in Indian construction projects. Int J Project Manage 30(4):479–489CrossRef Doloi H, Sawhney A, Iyer KC, Rentala S (2012) Analysing factors affecting delays in Indian construction projects. Int J Project Manage 30(4):479–489CrossRef
go back to reference Fallahnejad MH (2013) Delay causes in Iran gas pipeline projects. Int J Project Manage 31(1):136–146CrossRef Fallahnejad MH (2013) Delay causes in Iran gas pipeline projects. Int J Project Manage 31(1):136–146CrossRef
go back to reference Freeman, R. (1984). Strategic management: a stakeholder approach. Cambridge University Press Freeman, R. (1984). Strategic management: a stakeholder approach. Cambridge University Press
go back to reference Frimpong Y, Oluwoye J, Crawford L (2003) Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage 21:321–326CrossRef Frimpong Y, Oluwoye J, Crawford L (2003) Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage 21:321–326CrossRef
go back to reference Haseeb, A. T. D. (2011). Causes and Effects of Delays in Large Construction Projects of Pakistan. Kuwait Chapter of Arabian. Journal of Business and Management Review. 1(4), pp. 18–42 Haseeb, A. T. D. (2011). Causes and Effects of Delays in Large Construction Projects of Pakistan. Kuwait Chapter of Arabian. Journal of Business and Management Review. 1(4), pp. 18–42
go back to reference Heravi Torbati, A. H. (2014). Improving construction management: an investigation into the influences of effective stakeholder involvement on project quality outcomes. Queensland University of Technology: Ph.D. Thesis Heravi Torbati, A. H. (2014). Improving construction management: an investigation into the influences of effective stakeholder involvement on project quality outcomes. Queensland University of Technology: Ph.D. Thesis
go back to reference Kikwasi, G. (2013, February). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building - Conference Series (Vol. 1, No. 2, pp. 52–59) Kikwasi, G. (2013, February). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building - Conference Series (Vol. 1, No. 2, pp. 52–59)
go back to reference Li TH, Ng ST, Skitmore M (2013) Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: a fuzzy approach. Automation in construction 29:123–135CrossRef Li TH, Ng ST, Skitmore M (2013) Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: a fuzzy approach. Automation in construction 29:123–135CrossRef
go back to reference Memon, A. H., Rahman, I. A., & Azis, A. A. A. (2011). Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1) Memon, A. H., Rahman, I. A., & Azis, A. A. A. (2011). Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1)
go back to reference Meng X (2012) The effect of relationship management on project performance in construction. Int J Project Manage 30(2):188–198CrossRef Meng X (2012) The effect of relationship management on project performance in construction. Int J Project Manage 30(2):188–198CrossRef
go back to reference Odeh AM, Battaineh HT (2002) Causes of construction delay: traditional contracts. Int J Project Manage 20(1):67–73CrossRef Odeh AM, Battaineh HT (2002) Causes of construction delay: traditional contracts. Int J Project Manage 20(1):67–73CrossRef
go back to reference Olander, S. (2006). External stakeholder analysis in construction project management. Lund University, UK: PhD Thesis Olander, S. (2006). External stakeholder analysis in construction project management. Lund University, UK: PhD Thesis
go back to reference Olander S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics 25(3):277–287CrossRef Olander S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics 25(3):277–287CrossRef
go back to reference Olatunji, O. A. (2008). A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1) Olatunji, O. A. (2008). A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1)
go back to reference PMI (2013) A guide to the project management body of knowledge (PMBOK). Fifth Edition, Project Management Institute (PMI) PMI (2013) A guide to the project management body of knowledge (PMBOK). Fifth Edition, Project Management Institute (PMI)
go back to reference Salazar-Aramayo JL, Rodrigues-da-Silveira R, Rodrigues-de-Almeida M, de Castro-Dantas TN (2013) A conceptual model for project management of exploration and production in the oil and gas industry: The case of a Brazilian company. Int J Project Manage 31(4):589–601CrossRef Salazar-Aramayo JL, Rodrigues-da-Silveira R, Rodrigues-de-Almeida M, de Castro-Dantas TN (2013) A conceptual model for project management of exploration and production in the oil and gas industry: The case of a Brazilian company. Int J Project Manage 31(4):589–601CrossRef
go back to reference Stoney C, Winstanley D (2001) Stakeholding: confusion or utopia? Mapping the conceptual terrain. J Manage Stud 38(5):603–626CrossRef Stoney C, Winstanley D (2001) Stakeholding: confusion or utopia? Mapping the conceptual terrain. J Manage Stud 38(5):603–626CrossRef
go back to reference Sultan, B. M. (2005). The construction industry in Yemen: Towards economic sustainability. Queensland University of Technology: Ph.D. Thesis Sultan, B. M. (2005). The construction industry in Yemen: Towards economic sustainability. Queensland University of Technology: Ph.D. Thesis
go back to reference Tumi, S. A. H., Omran, A., & Pakir, A. H. K. (2009, November). Causes of delay in construction industry in Libya. The International Conference on Economics and Administration (pp. 265–272) Tumi, S. A. H., Omran, A., & Pakir, A. H. K. (2009, November). Causes of delay in construction industry in Libya. The International Conference on Economics and Administration (pp. 265–272)
go back to reference Verbeke A, Tung V (2013) The future of stakeholder management theory: A temporal perspective. J Bus Ethics 112(3):529–543CrossRef Verbeke A, Tung V (2013) The future of stakeholder management theory: A temporal perspective. J Bus Ethics 112(3):529–543CrossRef
Metadata
Title
Influential Factors in Construction Industry of Yemen
Authors
Najib AL-Fadhali
Ng Kim Soon
Rozlin Zainal
Abd Rahman Ahmad
Abdel Hafiz Ali Hasaballah
Copyright Year
2018
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-6190-5_84