Open Access 01-12-2022 | Original Article

Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop

Authors: Wangming Li, Dong Han, Liang Gao, Xinyu Li, Yang Li

Published in: Chinese Journal of Mechanical Engineering | Issue 1/2022

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem (IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem (HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles (AGVs) is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation (including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem.

1 Introduction

Due to the development of industry, scheduling plays a crucial role in modern manufacturing systems. As a branch of flow shop, the hybrid flow shop is widespread in modern industries, including electronics [1], textile [2], steelmaking [3] and petrochemical industries [4].
In mechanical manufacturing, production scheduling and transportation scheduling are two vital parts [5]. Optimizing both of them becomes a core task of advanced manufacturing and modern management, which not only allocates tasks but also affects the utilization level of resources and energy [6].
The importance of production scheduling problem and transportation scheduling problem has been emphasized by many researchers [711]. For the literatures of production scheduling problem in hybrid flow shop (also called HFSP), most of the researchers didn’t consider the transport procedure between machines or put it as fixed value into the setup time. However, more and more flexible transporters like AGVs are used to perform the transfer tasks in the modern factory, which obviously improves the productivity of manufacturing enterprises [9]. On the other hand, the use of AGVs also brings uncertainty and complexity to the current scheduling scheme. For example, unprocessed jobs can be processed on a set of alternative machines at a specific stage. All of these can cause uncertainty in transfer time during scheduling. As a result, in many manufacturing industries that are sensitive to transport time and limited transport resources, they attach more and more importance to considering the integrated production scheduling and transportation scheduling.
Therefore, this paper integrates the production and transportation scheduling in hybrid flow shops with identical machines, which is an extension of the HFSP. Transfer tasks between machines and machines or machines and warehouse are performed by a certain number of AGVs. And the goal of the IPTSP is to find optimal processing sequences on machines and optimal transport sequences on AGVs simultaneously.
Production scheduling and transportation scheduling are both well-known NP-hard problems [12, 13]. There are several researches that studied the coordination between production scheduling and transportation scheduling. Bilge and Ulusoy [14] assigned the transportation task to AGVs while scheduling the processing sequence of jobs on the machine. Amir and Pedram [15] addressed a permutation flow-shop scheduling problem with a finite number of transporters carrying jobs from each machine to its subsequent machine. Nishi et al. [16] used a bilevel decomposition algorithm to solve the simultaneous scheduling and conflict-free routing problems for AGVs. Elmi et al. [17] addressed the robotic scheduling problem considering multiple part types, unrelated parallel machines, multiple robots in blocking hybrid flow shop. Zabihzadeh et al. [18] used ant colony optimization (ACO) algorithm and genetic algorithm (GA) to solve flexible flow shop scheduling problem with robotic transportation and release time.
However, in all surveys mentioned above, they considered all stages of each job and put them as a long sequence to optimize. When the long sequence was worked as the code in their algorithms, it might make the algorithms search too large solution space and hardly get a satisfactory solution within reasonable computation time. Therefore, this paper proposes a new method for integrated production and transportation scheduling problem in hybrid flow shop environment, including the establishment of task pool, the new solution representation, the new solution evaluation and so on. Based on those, the production scheduling problem and the transportation scheduling problem mentioned above can be treated together. Then, a genetic algorithm with tabu search is applied to solve the integrated scheduling problem.
This paper is organized as follow. Section 2 presents the notation and description of problem. Section 3 introduces some preparation for solving the IPTSP. Section 4 describes the details of the hybrid algorithm. Section 5 shows the experimental design and results. Finally, Section 6 gives the conclusions and future work.

2 Problem Description and Formulation

In hybrid flow shop environment, a set of n jobs need to be processed at S stages. Each stage j has Mj identical parallel machines, while \({\text{M}}_{{\text{j}}} {\mkern 1mu} \ge 2\) for at least one stage. Once a job has completed processing at a certain stage, it needs to be transferred to the machine of its next stage by AGV. R identical AGVs are responsible for these transferring tasks. The object of scheduling is to determine the assignment of machines and AGVs at each stage for each job, the sequence of jobs on machines and the sequence of transferring tasks on AGVs, such that the makespan is minimized.
A small example is shown. There are 3 jobs to be processed without preemption on 4 machines. Each job needs to go through 3 processing stages. The number of identical machines in each stage is {1, 2, 1}. The number of identical AGVs is 2. The processing time of each job at each stage is shown in Table 1. The transport time between machines and machines (or a warehouse) is shown in Table 2. Figure 1 shows a Gantt chart of a scheduling scheme with makespan 40.
Table 1
Processing time of 3 jobs
Time(job/stage)
Stage 1
Stage 2
Stage 3
Job1
6
8
10
Job2
5
5
4
Job3
6
6
8
Table 2
Transport time between locations
Time
(from/to)
Warehouse
Machine1
Machine2
Machine3
Machine4
Warehouse
0
2
4
6
6
Machine1
2
0
2
4
4
Machine2
4
2
0
2
2
Machine3
6
4
2
0
4
Mahcine4
6
4
2
4
0

3 Some Preparation for Solving IPTSP

Under the same scale of problem, it’s obvious that the solution space of integrated scheduling problem is much larger than that of production scheduling or transportation scheduling. For getting better algorithm design in next section, some preparations are considered to be completed. Firstly, the task pool is introduced to transform scheduling into task selection and assignment, which can simplify the IPTSP. Secondly, a new way of solution representation according to the proposed task pool is proposed, which provides an encoding method for the IPTSP that can be operated by subsequent algorithms. Finally, the solution evaluation can evaluate the makespan of each code. By this way, all of them can help algorithm efficiently find satisfactory solutions while appropriately limiting the search space.

3.1 Establishment of Task Pool

In the IPTSP, each job at each stage requires a transportation task which takes it from previous machine (or warehouse) to current machine. And the number of existing transportation tasks does not exceed the total number of jobs at the same time. Based on these characteristics, this paper establishes a specific set of transportation tasks, called task pool. Then, the integrated scheduling problem can be solved through the procedure that the AGVs execute the tasks in the task pool in a specific order until the task pool is emptied.
Specifically, a task can be described as:
$$Task = (job\_no,stage\_no,st,from\_location),$$
(1)
where job_no is the index number of the job involved, stage_no is the current stage number of the job involved, st is the earliest start time of the task, from_location is the starting location of the task (if stage_no =1, it represents the warehouse; else, it represents the processing machine of job at stage stage_no -1).
Here, the task pool is a collection of all tasks to be scheduled. Initially, in the task pool, the number of tasks is equal to the number of jobs, the job_no of all tasks represent all jobs to be scheduled, the stage_no of all tasks represent stage one, the st of all tasks are zero, the from_location of all tasks represent warehouse. Once a task in task pool is completed by an AGV, if the stage_no of the task is not equal to the last stage of the job, the completed task (Taskold) will be removed from the task pool. At the same time, a new task (Tasknew) representing the next stage of the same job is added to the task pool. The old and new tasks satisfy the following relationship:
(1)
The job_nonew is equal to job_noold;
 
(2)
The stage_nonew represents the next stage of stage_noold;
 
(3)
The stnew is equal to the completion time of the job i at stage j involved in the Taskold.
 
(4)
The from_locationnew is the processing machine of the job i at stage j involved in the Taskold.
 
where, job_nonew and stage_nonew is the job_no and stage_no of Tasknew, job_noold and stage_noold is the job_no and stage_no of Taskold, stnew and from_locationnew is the st and from_location of Tasknew. A simple example is shown in Figure 2. Once the old task Task2 is completed and stage one is not the last stage of job2, a new Task2 which represent the next stage of the job is added in task pool. In the new task, “6” represents the completion time of job2 on machine2 at stage one (also the earliest start time of the new task). And “machine2” represents the processing machine selected for job2 at stage one (also the starting location of the new task).
After this, the object of scheduling is to assign the tasks in the task pool to each AGV in a certain order and then to schedule the trip and process, making the makespan smaller. While the task pool is emptied, the scheduling is complete.

3.2 Solution Representation

A new way of solution representation based on the proposed task pool is proposed, which provides an encoding method for the IPTSP that can be operated efficiently by subsequent algorithms.
Under some task selection rules based on time target (like: FCFS, EDT, GWTQ [19]), we found that the assignment of AGVs and the order of tasks transporting at the first stage have a great impact on the makespan, because the earliest start time of tasks in task pool are all zero and starting locations are all warehouses (at the first stage). Therefore, we consider to transform the assignment of AGVs and the order of tasks transporting at the first stage into a coding sequence to optimize. For that a new solution representation is introduced, based on tasks in task pool at the first stage. The new solution representation is composed of two parts:
1.
Transport sequence vector (also called v1);
 
2.
Transporter assignment vector (also called v2).
 
Transport sequence vector v1 represents the order of transport for each task at the first stage. Figure 3 illustrates a transport sequence vector. For example, the transport sequence shown in Figure 3 can be translated into a list of ordered tasks below: Task3Task2Task1Task4Task5.
In v2, v2(u) represents the AGV selected for the Tasku indicated at position u. Figure 4 illustrates a transporter assignment vector. For example, position 3 indicates Task3, and v2(3) represents the AGV assigned for Task3.
With the new solution representation, the assignment of AGVs and the sequence of tasks at the first stage have been confirmed. Furthermore, such algorithm applying requires a makespan evaluation procedure, which will be presented in the next section.

3.3 Solution Evaluation

Using the proposed solution representation method, the evaluation of makespan is described as follows:
(1)
At stage one, the transport sequence and the assignment of AGVs are determined according to the two-vector representation;
 
(2)
At stage j (j > 1), a task is assigned to the earliest idle AGV with a specific task selection rule. Repeat the above process until the task pool is emptied.
 
Among them, after the task is selected and assigned to an AGV, the processing machine (also the destination of the task) at this stage is selected according to the improved First Available Machine (FAM [20]) rule. When the task is completed, if the stage involved in this task doesn’t represent the last stage, the task is removed from the task pool and a new task is added (refer to Section 3.1 for the details).
The steps are shown below:
Step 1. Schedule the tasks in task pool at stage one:
(a) Read the position information in v1 from left to right, and get the corresponding task Taskm to be scheduled.
(b) Get other information about Taskm. For example, we can know the assigned AGV Rv for the task in v2, the involved job Ji, the processing time pij, the earliest start time of the task st, the starting location Mk.
(c) Plan the empty trip (from the destination Mk’ of the previous task to machine Mk) for Rv. The start time of the empty trip is earliest idle time of Rv. The arrival time of the empty trip is calculated as follow:
$$CT_{{i1}}^{\prime } = AIT_{v} + pt_{{k^{\prime } k}} ,$$
(2)
where, ptk'k represents the transport time from location Mk' to location Mk, AITv is the earliest idle time of Rv.
(d) Select the processing machine for Ji at stage one according the improved FAM rule. The estimated completion time \({C}_{{i}{1}}^{ \, {{p}}}{^{\prime}}\) of Ji at stage one on each available machine Mp is calculated as follow:
$$C_{{i1}}^{{p^{\prime}}} = \max \,(\max (CT^{\prime}_{{i1}} ,st) + pt_{{kp}} ,MIT_{p} ) + p_{{i1}} ,$$
(3)
where, MITp represents the earliest idle time of machine Mp, ptkp represents the transport time from location Mk to location Mp, pi1 represents the processing time of Ji at stage one.
Then, the machine Mq with the smallest estimated completion time was selected as the processing machine for Ji at stage one.
(e) Plan the loaded trip (from location Mk to location Mq) for Rv. The start time STi1 of the loaded trip is the maximum between the earliest start time of the task and the arrival time of the empty trip:
$$ST_{i1} = \max (CT_{i1}^{\;^{\prime}} ,st),$$
(4)
And the arrival time of the loaded trip is calculated as follow:
$$CT_{i1} = ST_{i1} + pt_{kq},$$
(5)
where, ptkq represents the transport time from location Mk to location Mq;
(f) Plan Ji to be processed on Mq. The start time Si1 of processing on machine Mq is the maximum between the earliest idle time of machine Mq and the arrival time of the loaded trip:
$$S_{i1} = \max (CT_{i1} ,MIT_{q} ),$$
(6)
where, MITq represents the earliest idle time of machine Mq;
(g) Update the earliest idle time of machine Mq and AGV Rv as follow:
$$MIT_{q} = S_{i1} + p_{i1},$$
(7)
$$AIT_{v} = CT_{i1},$$
(8)
(h) Update the task pool referred to Section 3.1;
(i) Repeat step1(a)–(h) until the last position of two-vector representation is read.
Step 2. Schedule the tasks in task pool at stage j (j > 1):
(a) Select the AGV Ru with the earliest idle time (AIT);
(b) Select a task from task pool as the next task for Ru. According to first come first served (FCFS) rule, the way that selecting the task Taskm with the smallest st is applied;
(c) Plan the empty trip and loaded trip for Ru, select processing machine, plan the job processing and update information. All of these procedures are similar with steps from 1(b) to (h);
(d) Repeat step 2(a)–(c) until the task pool is emptied.
Step 3. Get the makespan of current two-vector solution representation.

3.4 Advantages of the Proposed Solution Representation

The proposed solution representation and solution evaluation do not yield any infeasible solution. We give the theoretical proof:
Proof.
The disjunctive graph is used to prove it. According to the Ref. [21], an infeasible solution can be described as the condition that its disjunctive graph contains one or more directed cycles.
By contradiction: suppose the proposed solution representation and solution evaluation create an infeasible solution P. And the disjunctive graph of P contains a cycle C. There are three possible situations about the cycle C: (The dashed arrows in figure indicate that there may be some unmarked transport or machine operations on them).
(1) As shown in Figure 5, the cycle C is formed due to machine disjunctive arc and machine disjunctive arc.
As shown in Figure 5, the stage of operation 2 is after the stage of operation 1, the stage of operation 2 is after the stage of operation 1. The disjunctive arc between operation 2 and operation 3 indicates that the stage of operation 2 is equal to the stage of operation 1. So, the stage of operation 4 is after the stage of operation 1. There cannot be a disjunctive arc between operation 1 and operation 4, which is contrary to the figure. This proves that situation one cannot exist.
(2) As shown in Figure 6, the cycle C is formed due to transport disjunctive arc and transport disjunctive arc.
As shown in Figure 6, some relationships about the start time of operations can be obtained according to the conjunctive arcs: ST1<ST2, ST3<ST4 (STx indicates the start time of operation x).
The disjunctive arc between operation 2 and operation 3 indicates ST2<ST3. It can be inferred that ST1<ST4. According to the solution evaluation proposed by this paper, if transport operation 1 and transport operation 4 exist in the task pool at the same time, the transport operation 4 must be selected behind transport operation 1. So there can be no disjunctive arc from transport operation 1 to transport operation 4, which is contrary to the figure. This proves that situation two cannot exist.
(3) As shown in Figure 7, the cycle C is formed due to transport disjunctive arc and machine disjunctive arc.
As shown in Figure 7, some relationships about the start time of operations can be obtained according to the conjunctive arcs: S1<ST2, ST3<S4 (STx indicates the start time of transport operation x; Sy indicates the start time of machine operation y).
The disjunctive arc between operation 4 and operation 1 indicates ST4<ST1. It can be inferred that ST3<ST2. According to the solution evaluation proposed by this paper, if transport operation 3 and transport operation 2 exist in the task pool at the same time, the transport operation 2 must be selected behind transport operation 3. So there can be no disjunctive arc from transport operation 2 to transport operation 3, which is contrary to the figure. This proves that situation three cannot exist.
In summary, all of three possible situations about the cycle C cannot exist. This completes the proof.
Meanwhile, the proposed solution representation has major differences with that of the literatures. Refs. [17, 18] represent a solution by three long vectors which considered the sequence of operations, the machine assignment and the transporter assignment for all operations from a global view. They had proved the effectiveness and succeed in many cases. However, when the size of problem becomes larger, it may cause the algorithm to perform a lot of invalid searches and hardly to find an optimal solution.
The proposed solution representation uses two vectors representing the order sequence and assignment of AGVs at the first stage which has a big impact on result. The heuristic rules select tasks for corresponding AGV and select machine for jobs at the other stage. The advantage of the proposed solution representation is that each two-vector representation can be transformed into feasible scheduling scheme. And when applied to algorithms, it can limit the search space within a considerably range. For large-scale problems, a satisfactory solution can be obtained easily within a limited time. Detailed comparative experiments will be presented in Section 5.

4 Proposed Genetic Algorithm with Tabu Search for IPTSP

Genetic algorithm (GA) is a well-known meta-heuristic algorithm proposed by Holland inspired by the laws of biological evolution in nature. And tabu search (TS) is a local search algorithm proposed by Glover [22] to simulate human memory function. In this paper, the tabu search algorithm is nested into GA for improving offspring individuals in each generation. The framework of the hybrid method is shown in Figure 8.

4.1 Population Initialization

The chromosomes in GA are corresponding to the solutions or Gantt charts of the integrated scheduling problem. The method of chromosome representation and decoding is as same as that described in Section 3. In order to ensure the diversity of the population, the algorithm initialize the individuals in the initial population randomly.

4.2 Crossover Operator

For GA, the crossover operator determines the way that parents produce new individual, and promotes the algorithm’s global search capabilities. In this paper, two crossover operators are adopted.
The first crossover operator is the position-based crossover (PBX) for transport sequence vector (v1). The basic procedure of PBX is described as follow (two parents are noted as P1 and P2; two offspring are noted as C1 and C2):
Step1. Randomly generate several gene positions, and C1 and C2 respectively inherit the genes of the corresponding gene positions from P1 and P2;
Step2. C1 and C2 inherit the remaining genes from another parent (P2 and P1) on the unselected gene position.
The second crossover operator is the multi-point crossover (MPX) for transporter assignment vector (v2). The basic procedure of MPX is described as follow (two parents are noted as P1 and P2; two offspring are noted as C1 and C2):
Step1. Randomly generate a sequence composed of 0 and 1, and the length of the sequence is equal to the length of v2;
Step2. Select the same genes in P2 and P1 corresponding to position 1 in the sequence, and copy them to C1 and C2, that is, exchange the assigned transporter;
Step3. Keep the remaining genes in P1 and P2 to C1 and C2, thus generating offspring C1 and C2.

4.3 Mutation Operator

For GA, the mutation operator is used to make perturbations on chromosomes in order to maintain the algorithm’s local search capabilities. In this paper, two mutation operators are adopted.
The first mutation operator is used for transport sequence vector (v1), which selects two genes randomly and inserts the back one before the front one or the front one after the back one.
The second mutation operator is used for transporter assignment vector (v2), which selects one gene randomly and change the value of this selected gene to the other AGV.

4.4 Neighborhood Structure

For TS, neighborhood structure is a mechanism for generating new solutions by making small disturbances to the current solution. In this paper, four ways of neighborhood structure are adopted.
(1)
Binary exchange: select two points randomly in chromosome and reverse the order of all genes between these two points.
 
(2)
Two points exchange: select two points randomly in chromosome and exchange the gene value of these two points.
 
(3)
One point insert: select two points randomly and insert the back one before the front one.
 
(4)
Transporter change: select one point randomly and change the AGV assignment of this gene to the other AGV.
 

4.5 Tabu List

The purpose of the tabu list is to avoid roundabout searches and guide the algorithm to better explore the solution space. The length of the tabu list is the tenure of the subject staying in the tabu list. If the length is L, the tabu list can be expressed as a ring table composed of L subjects. Whenever a new subject is added to the tabu list, it is possible to overwrite one of the oldest elements with this new subject.

4.6 Termination Criterion

The termination criterion determines whether the algorithm should stop. In this paper, the GA with TS terminates when the number of iterations reaches to the maximum iterations (MaxIter); TS terminates when the number of iterations reaches to the maximum iterations (MaxTSIter).

5 Experiments and Computational Results

Since there are no corresponding benchmarks for the integrated scheduling problem in hybrid flow shop environment, we design two groups of instances in this section. Then we adapt three types of experiments to verify the proposed method. Finally, we make some analysis based on the results. All of the experiments have been coded in C++ and run on Intel Core i5 2.3 GHz PC with 8 GB memory.

5.1 Instances Design

This paper has designed two groups of instances. And all of them can be found at the website [30].

5.1.1 Group 1

Ref. [23] specializes in the benchmark of HFSP. We take some instances in Ref. [23] as a part of input information, and the corresponding transportation time between machines is generated according to number of machines. The instances of proposed benchmark are divided into small-size and large-size according to the number of jobs, as follows:
(1) Small-size: number of jobs: {10, 20, 30}; number of stages: {5, 10}; number of AGVs: {2, 4, 6};
(2) Large-size: number of jobs: {80, 160}; number of stages: {5}; number of AGVs: {4, 6, 8}.
When generating the problems, an important characteristic considered is the relative magnitude of the travel times and the processing times [24]. We consider using a variable α to distinguish different types of instances, and further generate large-α type and small-α type in large/small-size instances. The α represents the ratio between the average machine-to-machine transportation time and the average processing time of the instance. The value of α in each instance is calculated as follows:
$$\alpha = \frac{{(\sum {\sum {p_{ij} )/(n*s)} } }}{{(\sum {\sum {pt_{pq} } } )/(m + 1)^{2} }},$$
(9)
where, pij is the processing time of job i at stage j; ptpq is the transportation time of location p to location q; n is the number of jobs; s is the number of stages; m is the number of machines.

5.1.2 Group 2

Zabihzadeh and Rezaeian [18] have researched similar problems to this paper. They gave the parameters which were used to generate the instances, but did not give specific instances. In this group, parameters are generated randomly based on Zabihzadeh and Rezaeian’s research [18]. For each job, standard processing time, unloading, transferring and loading time at each stage are generated from the uniform distribution U [10, 100], U [5, 20], U [5, 20], U [5, 20], respectively. The match between the number of jobs, the number of stages, and the number of AGVs still refer to their research.

5.2 Experimental Setup

5.2.1 Experiment 1: Comparison of Solution Representations

Using the same genetic algorithm in Ref. [18], under the same number of iterations and other parameters, this paper solves proposed two groups of instances in three different solution representations (coding and decoding methods), which aims to verify the effectiveness of the proposed one:
(1) Mode1: Use the coding and decoding method of the HFSP in Ref. [28], and whenever the job is scheduled to be processed on the machine, use the AGV assignment rule in Ref. [29] to allocate the appropriate AGV to complete the corresponding transportation task.
(2) Mode2: Use the same coding and decoding method of the integrated scheduling problem with Ref. [18]. Blocking and release time are considered in Ref. [18], both of which are ignored here.
(3) Mode3: Use the coding and decoding method proposed in Section 3.

5.2.2 Experiment 2: Comparison of Selection Rules

According to Section 3.3, the task selection rule has an important impact on solution evaluation. Here, four common and classic rules are used for experiment and comparison, each of which is worked as a part of solution evaluation in the GATS independently [19].
(1)
Rule1: First Come First Served (FCFS). Each time, select the task with the minimum earliest start time (st);
 
(2)
Rule2: Longest Time Between Arrival (LTBA). Each time, select the task with the minimum difference between the AGV's estimated arrival time and the earliest start time;
 
(3)
Rule3: Shortest Travel Distance Rule (STD). Each time, select the task closest to the current location of the AGV;
 
(4)
Rule4: Greatest Waiting Time in Queue (GWTQ). Each time, select the task with the longest waiting time in the buffer.
 

5.2.3 Experiment 3: Comparison of Algorithms

In order to verify the effectiveness of the hybrid algorithm, the following five algorithms have been selected and programmed to solve the two groups of instances and compared with the hybrid GATS algorithm. They are ① Genetic algorithm (GA), ② Simulated annealing algorithm (SA), ③ Artificial bee colony algorithm (ABC) [25], ④ Grey wolf optimizer algorithm (GWO) [26] and ⑤ Migrating birds optimization algorithm (MBO) [27].

5.3 The Experimental Results

5.3.1 Results of Experiment 1

For each instance, run it five times and record its best makespan and average makespan. The parameters of GA used here are set as follows: the population size = 20; the crossover probability = 0.9; the mutation probability = 0.5; the maximum number of iterations = 500. The computational results are presented in Tables 3, 4, 5, 6, 7. Among them, “Mode3” represents the solution representation proposed by this paper.
Table 3
Comparison on Group 1 with small-size and small-α
Job
Stage
AGV
α
Mode1
Mode2
Mode3
Best
Average
Best
Average
Best
Average
10
5
2
0.10
612
622
534
591
424
435
4
508
512
526
577
423
434
6
449
458
514
563
423
431
10
2
0.14
1092
1111
1159
1227
832
854
4
951
967
1107
1157
830
845
6
888
905
1085
1145
835
843
20
5
2
0.10
1176
1183
1000
1038
688
707
4
1058
1068
938
988
686
698
6
925
949
894
959
688
698
10
2
0.17
1812
1841
1703
1767
974
1007
4
1574
1596
1482
1552
871
892
6
1422
1443
1472
1495
867
885
30
5
2
0.11
1481
1488
1228
1273
742
758
4
1377
1391
1126
1184
719
729
6
1276
1291
1156
1178
707
724
10
2
0.16
2959
2966
2443
2508
1485
1510
4
2720
2729
2217
2382
1149
1197
6
2531
2537
2213
2301
1151
1176
Table 4
Comparison on Group 1 with small-size and large-α
Job
Stage
AGV
α
Mode1
Mode2
Mode3
Best
Average
Best
Average
Best
Average
10
5
2
0.41
736
757
763
813
611
635
4
578
589
655
698
471
484
6
509
520
560
643
469
478
10
2
0.60
1412
1430
1674
1775
1255
1291
4
1099
1111
1425
1486
940
961
6
999
1016
1270
1339
914
930
20
5
2
0.38
1417
1435
1435
1508
1269
1312
4
1144
1159
1068
1164
797
808
6
1034
1042
1057
1129
742
759
10
2
0.72
2610
2646
2974
3061
2505
2540
4
1849
1867
2105
2222
1461
1492
6
1614
1634
1921
1989
1136
1174
30
5
2
0.45
2081
2094
2156
2202
1965
2005
4
1473
1478
1420
1517
1067
1098
6
1364
1371
1244
1366
811
848
10
2
0.67
4160
4193
4734
4837
3908
3977
4
3005
3020
3175
3339
2279
2298
6
2737
2754
2742
2879
1732
1757
Table 5
Comparison on Group 1 with large-size and small-α
Job
Stage
AGV
α
Mode1
Mode2
Mode3
Best
Average
Best
Average
Best
Average
80
5
4
0.10
4449
4474
3246
3321
2066
2085
6
4337
4347
3122
3255
2014
2053
8
4214
4240
3110
3254
2054
2068
160
5
4
0.10
9783
9794
7106
7410
4300
4366
6
9661
9684
7305
7514
4265
4291
8
9537
9544
7097
7302
4234
4268
Table 6
Comparison on Group 1 with large-size and large-α
Job
Stage
AGV
α
Mode1
Mode2
Mode3
Best
Average
Best
Average
Best
Average
80
5
4
0.43
4544
4552
4086
4212
3078
3093
6
4440
4441
3793
3800
2288
2308
8
4315
4333
3442
3610
2133
2152
160
5
4
0.40
9859
9876
8435
8545
6441
6463
6
9753
9773
7687
7737
4871
4926
8
9648
9653
7540
7700
4534
4567
Table 7
Comparison on Group 2
Job
Stage
AGV
α
Mode1
Mode2
Mode3
Best
Average
Best
Average
Best
Average
10
2
4
0.80
393
400
448
475
387
397
4
6
0.73
499
504
656
677
485
493
6
6
0.71
756
771
1013
1043
728
735
8
10
0.69
901
911
1273
1288
835
846
10
10
0.69
1092
1108
1535
1639
1058
1062
20
2
6
0.77
578
584
590
633
496
502
4
8
0.65
923
930
1081
1129
746
766
6
12
0.67
1112
1121
1415
1530
895
910
8
12
0.70
1494
1504
1965
2046
1241
1245
10
14
0.67
1733
1748
2309
2388
1336
1364
In Tables 3, 4, 5, 6,7, the solution representation (Mode3) proposed by this paper get all optimal solutions in best makespan and average makespan, which is much better than others.
To study the mechanism of the three different solution representations deeply, we analyze lots of the final Gantt charts for different instances (one group of which is shown in Figure 9). Meanwhile, combining with the characteristics of the HFSP, we get some findings: (1) For Mode1, affected by HFSP, processing and transportation of jobs are carried out depending on the stage (the order sequence at the latter stages is determined by the end time of jobs at the previous stage). This will make each AGV only transport jobs with the same stage in a period of time. As a result, the final scheduling schemes are too limited; (2) For Mode2, under the same scale of problem, the coding length is much larger than that of others. On the one hand, it can almost represent all the solutions in the solution space, providing the possibility for the algorithm to find global optimal solutions. On the other hand, due to the large search range, it is difficult for the algorithm to find a satisfactory solution in a limited time; (3) For Mode3, by optimizing the order sequence at the first stage that has a greater impact on the makespan, and combining with effective heuristic rule, the solution representation performs better.
The above results show that the proposed solution representation can help algorithm obtain good results than others, under the same number of iterations and other parameters.

5.3.2 Results of Experiment 2

For each instance, run it five times and record its best makespan and average makespan. The parameters of GATS used here are set as follows: the population size = 20; the crossover probability = 0.9; the mutation probability = 0.5; the length of tabu list = 10; the maximum iterations of the hybrid GA and TS = 50; the maximum iterations of the TS is 20. The computational results are presented in Tables 8, 9, 10, 11, 12. Among them, “GATS_FCFS” represents the hybrid GA and TS with FCFS rule.
Table 8
Comparison on Group 1 with small-size and small-α
Job
Stage
AGV
α
GATS_FCFS
GATS_LTBA
GATS_STD
GATS_GWTQ
Best
Average
Best
Average
Best
Average
Best
Average
10
5
2
0.10
424
426
423
427
456
467
423
424
4
423
423
422
422
441
455
423
423
6
423
423
423
423
433
442
423
423
10
2
0.14
830
833
842
844
948
996
830
845
4
830
835
830
833
926
967
830
840
6
830
839
830
830
859
888
830
834
20
5
2
0.10
687
694
689
698
820
837
686
696
4
681
685
677
682
779
799
675
681
6
679
685
678
682
780
795
679
682
10
2
0.17
974
991
1024
1038
1166
1190
975
992
4
860
861
861
869
1074
1093
851
859
6
842
855
842
854
1046
1102
848
855
30
5
2
0.11
720
731
729
741
900
918
721
740
4
696
700
708
709
831
856
697
705
6
686
699
694
702
838
849
692
702
10
2
0.16
1485
1531
1590
1603
1500
1602
1510
1532
4
1161
1167
1155
1187
1448
1486
1135
1154
6
1115
1123
1132
1144
1385
1395
1111
1127
Number of optimal solutions
10
9
7
6
0
0
10
6
Table 9
Comparison on Group 1 with small-size and large-α
Job
Stage
AGV
α
GATS_FCFS
GATS_LTBA
GATS_STD
GATS_GWTQ
Best
Average
Best
Average
Best
Average
Best
Average
10
5
2
0.41
604
615
615
640
644
664
596
613
4
469
471
471
475
504
519
467
471
6
464
465
461
463
492
497
466
467
10
2
0.60
1250
1278
1330
1345
1416
1451
1276
1302
4
938
944
950
967
1043
1108
929
938
6
905
913
911
920
983
1030
900
909
20
5
2
0.38
1269
1293
1333
1350
1245
1307
1277
1303
4
789
796
810
816
897
922
773
785
6
728
732
724
736
820
861
728
734
10
2
0.72
2545
2573
2646
2706
2572
2642
2551
2590
4
1465
1490
1588
1603
1508
1561
1451
1490
6
1145
1167
1266
1278
1309
1334
1171
1181
30
5
2
0.45
1929
1969
2038
2057
1813
1877
1919
1952
4
1084
1118
1159
1177
1088
1108
1094
1108
6
816
828
864
873
938
974
816
826
10
2
0.67
3983
4022
4204
4222
3794
3853
3990
4032
4
2322
2329
2451
2489
2214
2234
2301
2331
6
1784
1794
1936
1958
1776
1830
1786
1799
Number of optimal solutions
5
8
2
1
5
4
7
8
Table 10
Comparison on Group 1 with large-size and small-α
Job
Stage
AGV
α
GATS_FCFS
GATS_ LTBA
GATS_STD
GATS_GWTQ
Best
Average
Best
Average
Best
Average
Best
Average
80
5
4
0.10
2024
2037
1995
2005
2282
2310
1994
2013
6
1996
2008
1995
2011
2300
2306
2000
2007
8
1989
1998
1992
2003
2151
2204
1989
2001
160
5
4
0.10
4212
4241
4238
4272
4803
4817
4261
4276
6
4195
4213
4205
4226
4680
4720
4210
4234
8
4199
4213
4233
4237
4671
4694
4192
4212
Number of optimal solutions
3
3
1
1
0
0
3
2
Table 11
Comparison on Group 1 with large-size and large-α
Job
Stage
AGV
α
GATS_FCFS
GATS_ LTBA
GATS_STD
GATS_GWTQ
Best
Average
Best
Average
Best
Average
Best
Average
80
5
4
0.43
3022
3039
3212
3231
2732
2747
3004
3026
6
2183
2207
2333
2345
2423
2470
2187
2198
8
2076
2085
2068
2099
2324
2381
2069
2075
160
5
4
0.40
6380
6414
6771
6774
6450
6453
6444
6446
6
4681
4701
5071
5072
5002
5027
4736
4763
8
4373
4416
4385
4453
4902
4924
4433
4451
Number of optimal solutions
4
3
1
0
1
1
0
2
Table 12
Comparison on Group 2
Job
Stage
AGV
α
GATS_FCFS
GATS_LTBA
GATS_STD
GATS_GWTQ
Best
Average
Best
Average
Best
Average
Best
Average
10
2
4
0.80
377
380
381
387
379
381
378
381
4
6
0.73
474
479
491
498
475
486
471
477
6
6
0.71
712
731
738
755
734
752
717
719
8
10
0.69
832
838
842
846
846
860
838
843
10
10
0.69
1038
1050
1045
1056
1084
1106
1050
1052
20
2
6
0.77
465
481
484
489
504
513
473
483
4
8
0.65
740
755
788
799
767
795
732
754
6
12
0.67
885
899
915
924
977
994
888
897
8
12
0.70
1216
1229
1277
1285
1267
1290
1221
1234
10
14
0.67
1348
1369
1404
1424
1428
1439
1374
1377
Number of optimal solutions
8
6
0
0
0
0
2
4
In each type of instances, the statistics of the total number that each rule can achieve optimal result about best makespan and average makespan are shown in the Tables 13, 14. In the 58 instances, the GATS with FCFS rule achieves 30 optimal results about best makespan and 29 optimal results about average makespan, which is better than other algorithms. It is evident that the FCFS rule used in solution evaluation is effective and reliable when solving integrated scheduling problem.
Table 13
Statistical result of the best makespan
Size
α
Total number
Number of optimal solutions
GATS_FCFS
GATS_ LTBA
GATS_STD
GATS_GWTQ
Small
Small
18
10
7
0
10
Small
Large
18
5
2
5
7
Large
Small
6
3
1
0
3
Large
Large
6
4
1
1
0
Group2
10
8
0
0
2
Total
58
30
11
6
22
Table 14
Statistical result of the average makespan
Size
α
Total number
Number of optimal solutions
GATS_FCFS
GATS_ LTBA
GATS_STD
GATS_GWTQ
Small
Small
18
9
6
0
6
Small
Large
18
8
1
4
8
Large
Small
6
3
1
0
2
Large
Large
6
3
0
1
2
Group2
10
6
0
0
4
Total
58
29
8
5
22

5.3.3 Results of Experiment 3

For each instance, run each algorithm five times and record its best makespan and average makespan. The computational results are presented in Tables 15, 16, 17, 18, 19, 20, 21, 22, 23, 24. And Tables 25, 26, 27 present the comparison of average CPU time on two group of instances (only the instances with small-α are selected as the representative in the table).
Table 15
Comparison about best makespan on Group 1 with small-size and small-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
5
2
0.10
424
425
421
423
421
421
4
423
424
423
423
423
423
6
423
424
423
423
423
423
10
2
0.14
832
844
835
842
830
830
4
830
837
836
834
830
830
6
835
830
830
834
830
830
20
5
2
0.10
688
707
709
724
681
687
4
686
699
690
700
682
681
6
688
685
693
698
677
677
10
2
0.17
974
996
997
992
948
974
4
871
876
861
896
862
860
6
867
877
880
880
850
842
30
5
2
0.11
742
724
766
763
714
720
4
719
725
734
734
703
696
6
707
718
718
733
700
686
10
2
0.16
1485
1497
1522
1531
1459
1485
4
1149
1194
1201
1200
1152
1161
6
1151
1159
1186
1178
1137
1115
Number of optimal solutions
3
1
4
2
12
13
Table 16
Comparison about average makespan on Group 1 with small-size and small-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
5
2
0.10
435
433
425
428
422
426
4
434
428
425
424
425
423
6
431
427
424
424
424
423
10
2
0.14
854
848
844
851
837
833
4
845
844
841
843
838
835
6
843
840
835
844
833
839
20
5
2
0.10
707
711
714
736
688
694
4
698
705
700
711
686
685
6
698
698
702
712
686
685
10
2
0.17
1007
1009
1011
1017
961
991
4
892
893
885
906
876
861
6
885
881
889
897
855
855
30
5
2
0.11
758
752
775
772
733
731
4
729
730
743
738
711
700
6
724
728
737
736
707
699
10
2
0.16
1510
1519
1529
1536
1464
1531
4
1197
1201
1212
1211
1173
1167
6
1176
1171
1188
1185
1144
1123
Number of optimal solutions
1
0
0
0
6
13
Table 17
Comparison about best makespan on Group 1 with small-size and large-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
5
2
0.41
611
610
593
613
577
593
4
471
468
478
480
470
468
6
469
467
466
466
465
464
10
2
0.60
1255
1264
1242
1259
1226
1250
4
940
939
934
945
948
934
6
914
911
911
923
909
905
20
5
2
0.38
1269
1287
1280
1325
1268
1268
4
797
792
796
802
796
776
6
742
742
753
763
738
728
10
2
0.72
2505
2524
2490
2542
2481
2487
4
1461
1451
1486
1484
1455
1465
6
1136
1151
1158
1167
1150
1145
30
5
2
0.45
1965
1986
1964
1973
1941
1929
4
1067
1113
1100
1123
1091
1084
6
811
850
838
856
845
816
10
2
0.67
3908
3948
3912
3950
3928
3975
4
2279
2291
2287
2294
2236
2236
6
1732
1790
1782
1768
1763
1784
Number of optimal solutions
5
2
1
0
5
9
Table 18
Comparison about average makespan on Group 1 with small-size and large-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
5
2
0.41
635
620
608
633
596
615
4
484
474
480
485
474
472
6
478
472
467
469
466
465
10
2
0.60
1291
1273
1258
1283
1243
1278
4
961
950
946
961
954
944
6
930
918
918
930
917
913
20
5
2
0.38
1312
1313
1297
1334
1287
1293
4
808
802
807
825
801
796
6
759
753
758
772
746
732
10
2
0.72
2540
2548
2512
2555
2498
2506
4
1492
1495
1495
1495
1467
1490
6
1174
1164
1176
1180
1167
1155
30
5
2
0.45
2005
1992
1972
1986
1964
1963
4
1098
1124
1114
1125
1104
1118
6
848
856
852
859
849
828
10
2
0.67
3977
4000
3960
3980
3979
4022
4
2298
2309
2297
2308
2267
2255
6
1757
1795
1788
1783
1773
1794
Number of optimal solutions
2
0
1
0
5
10
Table 19
Comparison about best makespan on Group 1 with large-size and small-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
80
5
4
0.10
2066
2000
2056
2057
2041
2024
6
2014
2019
2046
2048
2027
1996
8
2054
2014
2051
2034
2036
1989
160
5
4
0.10
4300
4265
4390
4279
4254
4212
6
4265
4219
4315
4248
4233
4195
8
4234
4205
4305
4239
4278
4199
Number of optimal solutions
0
1
0
0
0
5
Table 20
Comparison about average makespan on Group 1 with large-size and small-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
80
5
4
0.10
2085
2037
2070
2068
2061
2035
6
2053
2022
2057
2066
2039
2008
8
2068
2018
2059
2057
2050
1998
160
5
4
0.10
4366
4266
4398
4311
4340
4241
6
4291
4231
4320
4257
4248
4213
8
4268
4212
4350
4258
4281
4213
Number of optimal solutions
0
1
0
0
0
5
Table 21
Comparison about best makespan on Group 1 with large-size and large-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
80
5
4
0.43
3078
3091
3067
3063
3067
3022
6
2288
2254
2334
2281
2235
2183
8
2133
2126
2186
2139
2093
2076
160
5
4
0.40
6441
6498
6485
6465
6501
6380
6
4871
4799
5008
4772
4792
4681
8
4534
4416
4659
4367
4518
4373
Number of optimal solutions
0
0
0
1
0
5
Table 22
Comparison about average makespan on Group 1 with large-size and large-α
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
80
5
4
0.43
3093
3093
3077
3079
3074
3039
6
2308
2287
2342
2301
2283
2207
8
2152
2131
2198
2167
2121
2085
160
5
4
0.40
6463
6504
6501
6471
6515
6414
6
4926
4812
5029
4799
4813
4701
8
4567
4430
4663
4394
4594
4416
Number of optimal solutions
0
0
0
1
0
5
Table 23
Comparison about best makespan on Group 2
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
2
4
0.80
387
384
378
393
381
377
4
6
0.73
485
479
472
490
479
474
6
6
0.71
728
728
717
724
718
712
8
10
0.69
835
832
845
848
834
832
10
10
0.69
1058
1047
1053
1058
1051
1038
20
2
6
0.77
496
494
497
519
476
465
4
8
0.65
746
751
751
750
740
740
6
12
0.67
895
911
906
914
894
885
8
12
0.70
1241
1230
1222
1240
1203
1216
10
14
0.67
1336
1365
1362
1363
1336
1336
Number of optimal solutions
1
1
1
0
3
8
Table 24
Comparison about average makespan on Group 2
Job
Stage
AGV
α
GA
SA
ABC
GWO
MBO
GATS
10
2
4
0.80
397
389
384
396
383
380
4
6
0.73
493
482
480
492
481
479
6
6
0.71
735
733
725
739
722
731
8
10
0.69
846
843
847
852
837
838
10
10
0.69
1062
1060
1057
1060
1053
1050
20
2
6
0.77
502
500
502
526
484
481
4
8
0.65
766
763
762
775
746
755
6
12
0.67
910
920
920
925
900
899
8
12
0.70
1245
1238
1233
1247
1214
1229
10
14
0.67
1364
1371
1364
1372
1344
1369
Number of optimal solutions
0
0
0
0
5
5
Table 25
Comparison about average CPU time on Group 1 with small-size
Job
Stage
AGV
GA(s)
SA(s)
ABC(s)
GWO(s)
MBO(s)
GATS(s)
10
5
2
30.5
28.4
27.0
28.4
15.5
19.1
4
32.7
23.4
33.7
40.2
22.1
25.2
6
34.5
30.7
40.8
55.6
30.0
31.3
10
2
69.3
54.4
56.5
61.9
54.9
57.9
4
74.0
79.6
72.1
87.2
77.6
70.2
6
86.0
88.6
84.4
110.6
89.7
81.7
20
5
2
67.5
51.9
53.9
56.4
50.1
55.1
4
68.1
69.7
68.4
81.9
72.8
66.5
6
68.3
75.1
84.1
111.5
97.3
77.4
10
2
114.9
91.0
104.6
109.2
90.0
113.0
4
136.3
101.2
129.5
159.1
110.7
136.5
6
151.8
135.2
164.4
227.4
205.2
159.9
30
5
2
61.4
64.8
75.4
78.3
62.6
62.1
4
95.3
87.0
96.6
114.7
90.8
99.5
6
108.5
99.7
114.3
149.4
125.0
114.7
10
2
146.7
144.4
155.6
135.6
126.4
139.4
4
218.7
138.8
195.3
237.9
192.4
205.3
6
227.4
189.1
236.3
315.6
252.1
241.1
Table 26
Comparison about average CPU time on Group 1 with large-size
Job
Stage
AGV
GA(s)
SA(s)
ABC(s)
GWO(s)
MBO(s)
GATS(s)
80
5
4
232.3
203.6
286.4
346.7
267.1
268.1
6
325.5
269.3
348.9
449.4
357.2
351.5
8
404.0
337.6
426.7
566.8
444.2
402.1
160
5
4
706.3
498.1
717.7
861.6
680.7
770.9
6
901.0
690.3
862.2
1123
948.4
943.6
8
1048.8
913.8
1083.9
1464.3
1166.5
1011.6
Table 27
Comparison about average CPU time on Group 2
Job
Stage
AGV
GA(s)
SA(s)
ABC(s)
GWO(s)
MBO(s)
GATS(s)
10
2
4
19.1
9.9
14.1
16.8
14.9
14.8
4
6
38.0
27.2
35.8
46.2
35.5
33.7
6
6
57.6
39.8
53.1
68.1
56.1
49.9
8
10
78.0
81.9
93.4
138.0
105.2
85.3
10
10
94.5
99.7
116.0
170.5
131.9
106.5
20
2
6
32.5
22.3
29.4
38.1
31.3
30.9
4
8
68.5
59.7
74.3
101.1
81.9
69.8
6
12
110.3
131.9
145.3
217.0
176.1
138.5
8
12
146.1
175.9
197.9
297.1
237.1
196.8
10
14
181.2
255.6
281.6
418.3
344.0
256.1
In each type of instances, the statistics of the total number that each algorithm can achieve optimal results about best makespan and average makespan are shown in Tables 28, 29. In the 58 instances, the GATS achieves 40 optimal results about best makespan and 38 optimal results about average makespan, which is better than other five. This means that the hybrid GA and TS has both effectiveness and efficiency for solving the integrated scheduling problem. In most instances, the calculation time of SA is the shortest, but the quality of solutions obtained by SA is relatively poor. The calculation time of GWO is the longest. There is no significant difference in the calculation time among the other algorithms. According to the above results, the GATS is effective to solve the IPTSP.
Table 28
Statistical result of best makespan
Size
α
Total number
Number of optimal solutions
GA
SA
ABC
GWO
MBO
GATS
Small
Small
18
3
1
4
2
12
13
Small
Large
18
5
2
1
0
5
9
Large
Small
6
0
1
0
0
0
5
Large
Large
6
0
0
0
1
0
5
Group 2
10
1
1
1
0
3
8
Total
58
9
5
6
3
20
40
Table 29
Statistical result of average makespan
Size
α
Total number
Number of optimal solutions
GA
SA
ABC
GWO
MBO
GATS
Small
Small
18
1
0
0
0
6
13
Small
Large
18
2
0
1
0
5
10
Large
Small
6
0
1
0
0
0
5
Large
Large
6
0
0
0
1
0
5
Group2
10
0
0
0
0
5
5
Total
58
3
1
1
1
16
38

6 Conclusions and Future Work

This paper solves the integrated production and transportation scheduling problem in hybrid flow shop environment. Firstly, some preparation for the problem has been made. Then, a hybrid genetic algorithm with tabu search has been adapted. Finally, two groups of instances have been designed and three types of experiments have been carried out for verifying the effectiveness of the proposed method.
The contributions of this research are as follows.
(1)
A new solving method for IPTSP, including the establishment of task pool, the new solution representation and the new solution evaluation, has been proposed for the problem. Taking it as coding and decoding method, the algorithm can search for a satisfactory solution within appropriate time.
 
(2)
A hybrid algorithm which hybridizes the genetic algorithm and tabu search has been proposed to solve the integrated scheduling problem. The hybrid algorithm combines the advantages of the two algorithms. The experimental results show that this algorithm has both effectiveness and efficiency for solving integrated scheduling problem.
 
Although the method proposed in this paper has achieved good results, there are still some works can be made in the future. Firstly, we can use multiple rules instead of single rule in solution evaluation, which may make the results more stable. Secondly, we can design some efficient methods of population initialization instead of the random one, and design efficient neighborhood structure to improve the hybrid algorithm.

Acknowledgements

Not applicable.

Competing interests

The authors declare no competing financial interests.
Open AccessThis article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://​creativecommons.​org/​licenses/​by/​4.​0/​.
Literature
[1]
go back to reference Wei Qin, Zilong Zhuang, Yang Liu, et al. A two-stage ant colony algorithm for hybrid flow shop scheduling with lot sizing and calendar constraints in printed circuit board assembly. Computers & Industrial Engineering, 2019: 138.CrossRef Wei Qin, Zilong Zhuang, Yang Liu, et al. A two-stage ant colony algorithm for hybrid flow shop scheduling with lot sizing and calendar constraints in printed circuit board assembly. Computers & Industrial Engineering, 2019: 138.CrossRef
[2]
go back to reference Leilei Meng, Chaoyong Zhang, Xinyu Shao, et al. More MILP models for hybrid flow shop scheduling problem and its extended problems. International Journal of Production Research, 2020, 58(13): 3905–3930.CrossRef Leilei Meng, Chaoyong Zhang, Xinyu Shao, et al. More MILP models for hybrid flow shop scheduling problem and its extended problems. International Journal of Production Research, 2020, 58(13): 3905–3930.CrossRef
[3]
go back to reference Quan-ke Pan, Ling Wang, Kun Mao, et al. An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 2013, 10(2): 307–322.CrossRef Quan-ke Pan, Ling Wang, Kun Mao, et al. An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 2013, 10(2): 307–322.CrossRef
[4]
go back to reference Biao Zhang, Quan-ke Pan, Liang Gao, et al. A three-stage multiobjective approach based on decomposition for an energy-efficient hybrid flow shop scheduling problem. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2020, 50(12): 4984–4999.CrossRef Biao Zhang, Quan-ke Pan, Liang Gao, et al. A three-stage multiobjective approach based on decomposition for an energy-efficient hybrid flow shop scheduling problem. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2020, 50(12): 4984–4999.CrossRef
[5]
go back to reference Xingyu Li, Baicun Wang, Chao Liu, et al. Intelligent manufacturing systems in covid-19 pandemic and beyond: Framework and impact assessment. Chinese Journal of Mechanical Engineering, 2020, 33: 58.CrossRef Xingyu Li, Baicun Wang, Chao Liu, et al. Intelligent manufacturing systems in covid-19 pandemic and beyond: Framework and impact assessment. Chinese Journal of Mechanical Engineering, 2020, 33: 58.CrossRef
[6]
go back to reference Ning Zhao, Song Ye, Kaidian Li, et al. Effective iterated greedy algorithm for flow-shop scheduling problems with time lags. Chinese Journal of Mechanical Engineering, 2017, 30(3): 652–662.CrossRef Ning Zhao, Song Ye, Kaidian Li, et al. Effective iterated greedy algorithm for flow-shop scheduling problems with time lags. Chinese Journal of Mechanical Engineering, 2017, 30(3): 652–662.CrossRef
[7]
go back to reference Lin Gui, Liang Gao, Xinyu Li. Anomalies in special permutation flow shop scheduling problems. Chinese Journal of Mechanical Engineering, 2020, 33: 46.CrossRef Lin Gui, Liang Gao, Xinyu Li. Anomalies in special permutation flow shop scheduling problems. Chinese Journal of Mechanical Engineering, 2020, 33: 46.CrossRef
[8]
go back to reference Ning Zhao, Siyu Chen, Yanhua Du. Emergency local searching approach for job shop scheduling. Chinese Journal of Mechanical Engineering, 2013, 26(5): 918–927.CrossRef Ning Zhao, Siyu Chen, Yanhua Du. Emergency local searching approach for job shop scheduling. Chinese Journal of Mechanical Engineering, 2013, 26(5): 918–927.CrossRef
[9]
go back to reference Guomin Li, Xinyu Li, Liang Gao, et al. Tasks assigning and sequencing of multiple AGVs based on an improved harmony search algorithm. Journal of Ambient Intelligence and Humanized Computing, 2019, 10(11): 4533–4546.CrossRef Guomin Li, Xinyu Li, Liang Gao, et al. Tasks assigning and sequencing of multiple AGVs based on an improved harmony search algorithm. Journal of Ambient Intelligence and Humanized Computing, 2019, 10(11): 4533–4546.CrossRef
[10]
go back to reference T Miyamoto, K Inoue. Local and random searches for dispatch and conflict-free routing problem of capacitated AGV systems. Computers & Industrial Engineering, 2016, 91: 1–9.CrossRef T Miyamoto, K Inoue. Local and random searches for dispatch and conflict-free routing problem of capacitated AGV systems. Computers & Industrial Engineering, 2016, 91: 1–9.CrossRef
[11]
go back to reference Dunbing Tang, Min Dai. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem. Chinese Journal of Mechanical Engineering, 2015, 28(5): 1048–1055.CrossRef Dunbing Tang, Min Dai. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem. Chinese Journal of Mechanical Engineering, 2015, 28(5): 1048–1055.CrossRef
[12]
go back to reference MK Marichelvam, T Prabaharan, Yang XS. Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan. Applied Soft Computing, 2014, 19: 93–101. MK Marichelvam, T Prabaharan, Yang XS. Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan. Applied Soft Computing, 2014, 19: 93–101.
[13]
go back to reference Ghiath Al Aqel, Xinyu Li, Liang Gao. A modified iterated greedy algorithm for flexible job shop scheduling problem. Chinese Journal of Mechanical Engineering, 2019, 32: 21. Ghiath Al Aqel, Xinyu Li, Liang Gao. A modified iterated greedy algorithm for flexible job shop scheduling problem. Chinese Journal of Mechanical Engineering, 2019, 32: 21.
[14]
go back to reference G Ulusoy, Ü BILGE. Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 1993, 31(12): 2857–2873.CrossRef G Ulusoy, Ü BILGE. Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 1993, 31(12): 2857–2873.CrossRef
[15]
go back to reference A Ahmadi-Javid, P Hooshangi-Tabrizi. A mathematical formulation and anarchic society optimisation algorithms for integrated scheduling of processing and transportation operations in a flow-shop environment. International Journal of Production Research, 2015, 53(19): 5988–6006.CrossRef A Ahmadi-Javid, P Hooshangi-Tabrizi. A mathematical formulation and anarchic society optimisation algorithms for integrated scheduling of processing and transportation operations in a flow-shop environment. International Journal of Production Research, 2015, 53(19): 5988–6006.CrossRef
[16]
go back to reference T Nishi, Y Hiranaka, I E Grossmann. A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles. Computers & Operations Research, 2011, 38(5): 876–888.MathSciNetCrossRef T Nishi, Y Hiranaka, I E Grossmann. A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles. Computers & Operations Research, 2011, 38(5): 876–888.MathSciNetCrossRef
[17]
go back to reference A Elmi, S Topaloglu. A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots. Computers & Operations Research, 2013, 40(10): 2543–2555.MathSciNetCrossRef A Elmi, S Topaloglu. A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots. Computers & Operations Research, 2013, 40(10): 2543–2555.MathSciNetCrossRef
[18]
go back to reference S Zabihzadeh, J Rezaeian. Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time. Applied Soft Computing, 2016, 40: 319–330.CrossRef S Zabihzadeh, J Rezaeian. Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time. Applied Soft Computing, 2016, 40: 319–330.CrossRef
[19]
go back to reference Y Ho, H Liu. The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs. Journal of Manufacturing Systems, 2009, 28(1): 1–10.CrossRef Y Ho, H Liu. The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs. Journal of Manufacturing Systems, 2009, 28(1): 1–10.CrossRef
[20]
go back to reference S A Brah, L L Luan. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research, 1999, 113(1): 113−122.CrossRef S A Brah, L L Luan. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research, 1999, 113(1): 113−122.CrossRef
[21]
go back to reference P Lacomme, M Larabi, N Tchernev. A disjunctive graph for the job-shop with several robots. MISTA conference, 2007: 285–92. P Lacomme, M Larabi, N Tchernev. A disjunctive graph for the job-shop with several robots. MISTA conference, 2007: 285–92.
[22]
go back to reference F Glover. Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 1986, 13: 533–549.MathSciNetCrossRef F Glover. Future paths for integer programming and links to artificial intelligence. Computers and Operations Research, 1986, 13: 533–549.MathSciNetCrossRef
[23]
go back to reference Victor Fernandez-Viagas, Josem Framinan. Design of a testbed for hybrid flow shop scheduling with identical machines. Computers & Industrial Engineering, 2020: 141.CrossRef Victor Fernandez-Viagas, Josem Framinan. Design of a testbed for hybrid flow shop scheduling with identical machines. Computers & Industrial Engineering, 2020: 141.CrossRef
[24]
go back to reference G Ulusoy, F Sivrikaya-şerifoǧlu, Ü Bilge. A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Operations Research, 1997, 24(4): 335–351.MathSciNetCrossRef G Ulusoy, F Sivrikaya-şerifoǧlu, Ü Bilge. A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Operations Research, 1997, 24(4): 335–351.MathSciNetCrossRef
[25]
go back to reference Yingli Li, Xinyu Li, Liang Gao, et al. An improved artificial bee colony algorithm for distributed heterogeneous hybrid flowshop scheduling problem with sequence-dependent setup times. Computers & Industrial Engineering, 2020: 147.CrossRef Yingli Li, Xinyu Li, Liang Gao, et al. An improved artificial bee colony algorithm for distributed heterogeneous hybrid flowshop scheduling problem with sequence-dependent setup times. Computers & Industrial Engineering, 2020: 147.CrossRef
[26]
go back to reference S Mirjalili, S M Mirjalili, A Lewis. Grey wolf optimizer. Advances in Engineering Software, 2014, 69: 46–61.CrossRef S Mirjalili, S M Mirjalili, A Lewis. Grey wolf optimizer. Advances in Engineering Software, 2014, 69: 46–61.CrossRef
[27]
go back to reference E Duman, M Uysal, A F Alkaya. Migrating Birds Optimization: A new metaheuristic approach and its performance on quadratic assignment problem. Information Sciences, 2012, 217: 65–77.MathSciNetCrossRef E Duman, M Uysal, A F Alkaya. Migrating Birds Optimization: A new metaheuristic approach and its performance on quadratic assignment problem. Information Sciences, 2012, 217: 65–77.MathSciNetCrossRef
[28]
go back to reference F S Şerifoğlu, G Ulusoy. Multiprocessor task scheduling in multistage hybrid flowshops: a genetic algorithm approach. Journal of the Operational Research Society, 2004, 55(5): 504–512.CrossRef F S Şerifoğlu, G Ulusoy. Multiprocessor task scheduling in multistage hybrid flowshops: a genetic algorithm approach. Journal of the Operational Research Society, 2004, 55(5): 504–512.CrossRef
[29]
go back to reference Jamest Lin, Chun-chih Chiu, Yu-hsiang Chang. Simulation-based optimization approach for simultaneous scheduling of vehicles and machines with processing time uncertainty in FMS. Flexible Services and Manufacturing Journal, 2019, 31(1): 104–141.CrossRef Jamest Lin, Chun-chih Chiu, Yu-hsiang Chang. Simulation-based optimization approach for simultaneous scheduling of vehicles and machines with processing time uncertainty in FMS. Flexible Services and Manufacturing Journal, 2019, 31(1): 104–141.CrossRef
Metadata
Title
Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop
Authors
Wangming Li
Dong Han
Liang Gao
Xinyu Li
Yang Li
Publication date
01-12-2022
Publisher
Springer Singapore