Skip to main content
Top

2014 | OriginalPaper | Chapter

Job Block Scheduling with Dual Criteria and Sequence-Dependent Setup Time Involving Transportation Times

Authors : Deepak Gupta, Kewal Krishan Nailwal, Sameer Sharma

Published in: Computational Intelligence, Cyber Security and Computational Models

Publisher: Springer India

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

A two-machine flowshop scheduling with sequence-dependent setup time (SDST), job block, and transportation time is considered with the objective of minimizing makespan and the rental cost of machines taken on rent under a specified rental policy. The processing time of attributes on these machines is associated with probabilities. To find the optimal or near-optimal solution for these objectives, a heuristic algorithm is developed. To test the efficiency of the proposed heuristic algorithm, a numerical illustration is given.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference A. Allahverdi, J.N.D. Gupta, T. Aldowaisan, “A review of scheduling research involving setup considerations”, OMEGA, The International Journal of Management Sciences, 27, 1999, pp. 219–239. A. Allahverdi, J.N.D. Gupta, T. Aldowaisan, “A review of scheduling research involving setup considerations”, OMEGA, The International Journal of Management Sciences, 27, 1999, pp. 219–239.
2.
go back to reference A. Allahverdi, C.T. Ng, T.C.E. Cheng, M.Y. Kovalyov, “A survey of scheduling problems with setup times or costs”, European Journal of Operational Research, 187, 2008, pp. 985–1032. A. Allahverdi, C.T. Ng, T.C.E. Cheng, M.Y. Kovalyov, “A survey of scheduling problems with setup times or costs”, European Journal of Operational Research, 187, 2008, pp. 985–1032.
3.
go back to reference P.C. Bagga and A. Bhambani, “Bicriteria in flow shop scheduling problem”, Journal of Combinatorics, Information and System Sciences, 22, 1999, pp. 63–83. P.C. Bagga and A. Bhambani, “Bicriteria in flow shop scheduling problem”, Journal of Combinatorics, Information and System Sciences, 22, 1999, pp. 63–83.
4.
go back to reference K.R. Baker, “Introduction to Sequencing and Scheduling”, Wiley: New York, 1974. K.R. Baker, “Introduction to Sequencing and Scheduling”, Wiley: New York, 1974.
5.
go back to reference H.G. Campbell, R.A. Dudek, and M.L. Smith, “A heuristic algorithm for the n-job, m-machine sequencing problem”, Management Science, 16, 1970, pp. 630–637. H.G. Campbell, R.A. Dudek, and M.L. Smith, “A heuristic algorithm for the n-job, m-machine sequencing problem”, Management Science, 16, 1970, pp. 630–637.
6.
go back to reference B.D. Crown and A.O. Esogbue, “Two machine flow shop scheduling problems with sequence dependent setup time: a dynamic programming approach”, Naval Research Logistics Quarterly, 21, 1974, pp. 515–523. B.D. Crown and A.O. Esogbue, “Two machine flow shop scheduling problems with sequence dependent setup time: a dynamic programming approach”, Naval Research Logistics Quarterly, 21, 1974, pp. 515–523.
7.
go back to reference C. Gagne, W.L. Price, M. Gravel, “Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times”, Journal of the Operational Research Society 53, 2002, pp. 895–906. C. Gagne, W.L. Price, M. Gravel, “Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times”, Journal of the Operational Research Society 53, 2002, pp. 895–906.
8.
go back to reference Y. Gajpal, C. Rajendran and H. Ziegler, “An ant colony algorithm for scheduling in flow shop with sequence dependent set times of jobs”, The international Journal of Advanced Manufacturing Technology, 30(5-6), 2006, pp. 416–424. Y. Gajpal, C. Rajendran and H. Ziegler, “An ant colony algorithm for scheduling in flow shop with sequence dependent set times of jobs”, The international Journal of Advanced Manufacturing Technology, 30(5-6), 2006, pp. 416–424.
9.
go back to reference D. Gupta, S. Sharma, Seema and Shefali, “nx2 bicriteria flowshop scheduling under specified rental policy, processing time and setup time each associated with probabilities including job block”, European Journal of Business and Management, 3(3) (2012) pp. 268–286. D. Gupta, S. Sharma, Seema and Shefali, “nx2 bicriteria flowshop scheduling under specified rental policy, processing time and setup time each associated with probabilities including job block”, European Journal of Business and Management, 3(3) (2012) pp. 268–286.
10.
go back to reference D. Gupta, S. Sharma, Seema and K.K. Nailwal, “A bicriteria two machine flowshop scheduling with sequence dependent setup time”, International Journal of Mathematical Sciences, 11(3-4), 2012, pp. 183–196. D. Gupta, S. Sharma, Seema and K.K. Nailwal, “A bicriteria two machine flowshop scheduling with sequence dependent setup time”, International Journal of Mathematical Sciences, 11(3-4), 2012, pp. 183–196.
11.
go back to reference D. Gupta, S. Sharma, Seema and K.K. Nailwal, “Bicriteria job block scheduling with sequence dependent setup time”, Proceedings of the International Conference on Optimization, Computing and Business Analytics, 2012, pp. 8-13. D. Gupta, S. Sharma, Seema and K.K. Nailwal, “Bicriteria job block scheduling with sequence dependent setup time”, Proceedings of the International Conference on Optimization, Computing and Business Analytics, 2012, pp. 8-13.
12.
go back to reference J.N.D. Gupta and W.P. Darrow, “The two machine sequence dependent flowshop scheduling problem”, European Journal of Operational Research, 24(3) (1974) 439–446. J.N.D. Gupta and W.P. Darrow, “The two machine sequence dependent flowshop scheduling problem”, European Journal of Operational Research, 24(3) (1974) 439–446.
13.
go back to reference S.R. Gupta, J.S. Smith, “Algorithms for single machine total tardiness scheduling with sequence dependent setups”, European Journal of Operational Research, 175, 2006, pp. 722–739. S.R. Gupta, J.S. Smith, “Algorithms for single machine total tardiness scheduling with sequence dependent setups”, European Journal of Operational Research, 175, 2006, pp. 722–739.
14.
go back to reference S.M. Johnson, “Optimal two and three stage production schedule with set up times included”, Naval Research Logistics Quarterly. 1(1) (1954) 61–68. S.M. Johnson, “Optimal two and three stage production schedule with set up times included”, Naval Research Logistics Quarterly. 1(1) (1954) 61–68.
15.
go back to reference P.L. Maggu and G. Das, “Equivalent jobs for job block in job scheduling”, Opsearch, 14(4) (1977) 277–281. P.L. Maggu and G. Das, “Equivalent jobs for job block in job scheduling”, Opsearch, 14(4) (1977) 277–281.
16.
go back to reference P.L. Maggu P and G. Das, “Elements of Advanced Production Scheduling”, United Publishers and Periodical Distributors, 1985. P.L. Maggu P and G. Das, “Elements of Advanced Production Scheduling”, United Publishers and Periodical Distributors, 1985.
17.
go back to reference M. Nawaz, Jr.E.E. Enscore and I. Ham, “A heuristic algorithm for the m-machine n-job flowshop sequencing problem”, OMEGA, International Journal of Management Science, 11, 1983, pp. 91–95. M. Nawaz, Jr.E.E. Enscore and I. Ham, “A heuristic algorithm for the m-machine n-job flowshop sequencing problem”, OMEGA, International Journal of Management Science, 11, 1983, pp. 91–95.
18.
go back to reference D.S. Palmer, “Sequencing jobs through a multi-stage process in the minimum total time - a quick method of obtaining a near-optimum”, Operational Research Quarterly, 16(1) (1965) 101–107. D.S. Palmer, “Sequencing jobs through a multi-stage process in the minimum total time - a quick method of obtaining a near-optimum”, Operational Research Quarterly, 16(1) (1965) 101–107.
19.
go back to reference M.L. Pinedo, “Scheduling: Theory, Algorithms, and Systems”, Third Edition, Springer, 2008. M.L. Pinedo, “Scheduling: Theory, Algorithms, and Systems”, Third Edition, Springer, 2008.
20.
go back to reference G. Rabadi, M. Mollaghasemi, and G.C. Anagnostopoulos, “A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence dependent setup time”, Computers and Operations Research 31, 2004, pp. 1727–1751. G. Rabadi, M. Mollaghasemi, and G.C. Anagnostopoulos, “A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence dependent setup time”, Computers and Operations Research 31, 2004, pp. 1727–1751.
21.
go back to reference C. Rajendran, H. Ziegler, “A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs”, Computers and Industrial Engineering 33, 1997, pp. 281–284. C. Rajendran, H. Ziegler, “A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs”, Computers and Industrial Engineering 33, 1997, pp. 281–284.
22.
go back to reference R.Z. Rıos-Mercado, J.F. Bard, “A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times”, IIE Transactions 31, 1999, pp. 721–731. R.Z. Rıos-Mercado, J.F. Bard, “A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times”, IIE Transactions 31, 1999, pp. 721–731.
23.
go back to reference K.C. Tan, R. Narasimhan, “Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach”, OMEGA, 25, 1997, pp. 619–634. K.C. Tan, R. Narasimhan, “Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach”, OMEGA, 25, 1997, pp. 619–634.
24.
go back to reference L.N. Van Wassenhove and L.F. Gelders, “Solving a bicriteria scheduling problem”, AIIE Tran 15 s, 1980, pp. 84–88. L.N. Van Wassenhove and L.F. Gelders, “Solving a bicriteria scheduling problem”, AIIE Tran 15 s, 1980, pp. 84–88.
Metadata
Title
Job Block Scheduling with Dual Criteria and Sequence-Dependent Setup Time Involving Transportation Times
Authors
Deepak Gupta
Kewal Krishan Nailwal
Sameer Sharma
Copyright Year
2014
Publisher
Springer India
DOI
https://doi.org/10.1007/978-81-322-1680-3_35

Premium Partner