Just-in-Time Production of Large Assemblies Using Project Scheduling Models and Methods
Activate our intelligent search to find suitable subject content or patents.
Select sections of text to find matching patents with Artificial Intelligence. powered by
Select sections of text to find additional relevant content using AI-assisted search. powered by
Since the advent of just-in-time driven production planning and control at the Toyota manufacturing plants, the just-in-time paradigm has considered wide-spread consideration within production and operations management (cf., e.g., Schniederjans [
22
] and Cheng and Podolski [
5
]). While it was first employed for the high-volume-production of goods only, later there has been considerable research in the area of low-volume, make-to-order manufacturing (cf., e.g., Baker and Scudder [
2
], Neumann et al. [
18
], and Rachamadugu [
21
]). Agrawal et al. [
1
] considered a practical scheduling problem at Westinghouse ESG, where a number of customer-specific products have to be assembled subject to technological precedence and capacity constraints. The authors developed a MIP-formulation and — in the face of the NP-hardness of the problem — a ‘lead time evaluation and scheduling algorithm’ with acronym LETSA.