Abstract

The safe construction of transverse channel was the premise to ensure the smooth construction of the shallow-buried excavated metro station. Based on the construction of the transverse channel of Shikui Road station of Dalian Metro Line 5, the surface settlement, the stress of the support structure and the removal length of the primary lining were analyzed by using the field monitoring data and numerical simulation. The results showed that the excavation of shaft caused disturbance to the rock at the beginning of the transverse channel, and it was necessary to adopt advanced grouting bolt to reinforce the surrounding rock before the excavation of transverse channel, so as to make up for the stratum loss. The biggest disturbance to the ground surface and rock mass was the construction of the first and second pilot tunnels on the left side of the transverse channel, and the surface settlement caused by this stage accounted for 58% of the total settlement. The area affected by the construction of the transverse channel was within 4 times the diameter of the pilot tunnel from the center line of the transverse channel. The rapid closure of the primary lining at the top of the transverse channel could effectively reduce the disturbance to rock mass and ground surface caused by the excavation of large section of the lower pilot tunnels. Based on the numerical simulation results, the removal length of the primary lining was determined to be 12 m, and its rationality was verified effectively in the actual construction. The research results could provide reference for the design and construction of similar projects.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Cheng XS, Wang JH (2013) Construction methods for loess tunnels with super-large cross-section based on displacement control of surrounding rock. Chin J Geotech Eng 35(S1):82–89 (in Chinese) Cheng XS, Wang JH (2013) Construction methods for loess tunnels with super-large cross-section based on displacement control of surrounding rock. Chin J Geotech Eng 35(S1):82–89 (in Chinese)
go back to reference Cheng T, Liu JW, Ping C (2014) The optimization analysis on construction scheme of large span metro station in hard rock stratum. Chin J Undergr Space Eng 10(03):635–640 (in Chinese) Cheng T, Liu JW, Ping C (2014) The optimization analysis on construction scheme of large span metro station in hard rock stratum. Chin J Undergr Space Eng 10(03):635–640 (in Chinese)
go back to reference Chang LF, Sun ZJ (2015) Numerical simulation analysis of construction in portal section of large section loess tunnel. J Shijiazhuang Tiedao Univ Nat Sci 28(02):32–37 (in Chinese) Chang LF, Sun ZJ (2015) Numerical simulation analysis of construction in portal section of large section loess tunnel. J Shijiazhuang Tiedao Univ Nat Sci 28(02):32–37 (in Chinese)
go back to reference Huang LX (2019) Study on in-situ expansion construction technology of a two-way four lane tunnel. 56(S2):591–597 (in Chinese) Huang LX (2019) Study on in-situ expansion construction technology of a two-way four lane tunnel. 56(S2):591–597 (in Chinese)
go back to reference Liu JL, Fang YC, Ye XM (2019a) A comparative study of the excavation methods for the large-span intersection of Zizhi Tunnel in Hangzhou. Mod Tunn Technol 56(06):167–172 (in Chinese) Liu JL, Fang YC, Ye XM (2019a) A comparative study of the excavation methods for the large-span intersection of Zizhi Tunnel in Hangzhou. Mod Tunn Technol 56(06):167–172 (in Chinese)
go back to reference Jia J, Shi JS, Zhou SH, Wei K (2013) Forecast and analysis of surface settlement of metro station constructed by shield tunnel expanding. Chin J Rock Mechan Eng 32(S1):2883–2890 (in Chinese) Jia J, Shi JS, Zhou SH, Wei K (2013) Forecast and analysis of surface settlement of metro station constructed by shield tunnel expanding. Chin J Rock Mechan Eng 32(S1):2883–2890 (in Chinese)
go back to reference Liu C, Peng LM, Lei MF, Shi CH (2019b) Applicability & mechanical characteristics of shallow buried soft red clay tunnel under 3-step benching tunneling method with large arch feet. J Rail Sci Eng 16(08):2006–2017 (in Chinese) Liu C, Peng LM, Lei MF, Shi CH (2019b) Applicability & mechanical characteristics of shallow buried soft red clay tunnel under 3-step benching tunneling method with large arch feet. J Rail Sci Eng 16(08):2006–2017 (in Chinese)
go back to reference Valizadeh KA, Sadaghiani MH, Ahmad MM (2012) Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure. Tunn Undergr Space Technol 28:1–9 Valizadeh KA, Sadaghiani MH, Ahmad MM (2012) Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure. Tunn Undergr Space Technol 28:1–9
go back to reference Wang T, Liu WN, Zhang CM, He HJ, Li XG (2007) Study on ground settlement induced by shallow metro station constructions. Chin J Rock Mech Eng 26(09):1855–1861 (in Chinese) Wang T, Liu WN, Zhang CM, He HJ, Li XG (2007) Study on ground settlement induced by shallow metro station constructions. Chin J Rock Mech Eng 26(09):1855–1861 (in Chinese)
go back to reference Xia MR, Li W, Feng X, Zhu GX, Li X (2017) Grouting reinforcement and excavation stability on super-shallow buried and water-rich sand stratum subway transverse channel. J Shandong Univ Eng Sci 47(02):47–54+70 in Chinese Xia MR, Li W, Feng X, Zhu GX, Li X (2017) Grouting reinforcement and excavation stability on super-shallow buried and water-rich sand stratum subway transverse channel. J Shandong Univ Eng Sci 47(02):47–54+70 in Chinese
go back to reference Yu L, Zhang DL, Fang Q, Cao LQ, Xu T, Li QQ (2019) Surface settlement of subway station construction using pile-beam-arch approach. Tunn Undergr Space Technol 90:340–356CrossRef Yu L, Zhang DL, Fang Q, Cao LQ, Xu T, Li QQ (2019) Surface settlement of subway station construction using pile-beam-arch approach. Tunn Undergr Space Technol 90:340–356CrossRef
go back to reference Yao HW, Wang W (2018) Study of optimal proposal and field test for CRD excavation method of shallow-buried tunnel. J Railw Sci Eng 15(06):1509–1515 (in Chinese) Yao HW, Wang W (2018) Study of optimal proposal and field test for CRD excavation method of shallow-buried tunnel. J Railw Sci Eng 15(06):1509–1515 (in Chinese)
go back to reference Yang SZ, Zhang DL, Su J (2016) Numerical analysis of the surrounding ground deformation in interchange tunnel for underground road in Beijing. Chin Civil Eng J 49(S2):103–106 (in Chinese) Yang SZ, Zhang DL, Su J (2016) Numerical analysis of the surrounding ground deformation in interchange tunnel for underground road in Beijing. Chin Civil Eng J 49(S2):103–106 (in Chinese)
go back to reference Yu JL, Xu LH, Ai XY (2011) Comparison of surface effects of CRD tunnel construction method on buildings of different structural types. Chin Civil Eng J 44(S1):192–200 (in Chinese) Yu JL, Xu LH, Ai XY (2011) Comparison of surface effects of CRD tunnel construction method on buildings of different structural types. Chin Civil Eng J 44(S1):192–200 (in Chinese)
go back to reference Yao XD, Wang MS (2006) Statistic analysis of guideposts for ground settlement induced by shallow tunnel construction. Chin J Rock Mech Eng 25(10):2030–2035 (in Chinese) Yao XD, Wang MS (2006) Statistic analysis of guideposts for ground settlement induced by shallow tunnel construction. Chin J Rock Mech Eng 25(10):2030–2035 (in Chinese)
go back to reference Zheng HB, Wang QS, Dong ZQ, Li PE, Ma GW (2018) Study of ground subsidence laws during excavation of π shaped double-cross channel. Chin J Rock Mech Eng 37(S1):3787–3795 (in Chinese) Zheng HB, Wang QS, Dong ZQ, Li PE, Ma GW (2018) Study of ground subsidence laws during excavation of π shaped double-cross channel. Chin J Rock Mech Eng 37(S1):3787–3795 (in Chinese)
Metadata
Title
Mechanical Response Analysis of Large Section Transverse Channel Construction in Metro Station
Authors
Xinping Guo
Annan Jiang
Mengfei Xu
Hai Yu
Publication date
29-06-2021
Publisher
Springer International Publishing
Published in
Geotechnical and Geological Engineering / Issue 1/2022
Print ISSN: 0960-3182
Electronic ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-021-01909-6

Other articles of this Issue 1/2022

Geotechnical and Geological Engineering 1/2022 Go to the issue