Skip to main content
Top
Published in: International Journal of Machine Learning and Cybernetics 4/2011

01-12-2011 | Original Article

Optimal policy for fuzzy expected value production inventory model with imprecise production preparation-time

Authors: Hardik Soni, Nita H. Shah

Published in: International Journal of Machine Learning and Cybernetics | Issue 4/2011

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

A great deal of research has been done on economic production quantity (EPQ) model, which concern deterministic or stochastic or fuzzy demand and cost situations. In this paper, the EPQ model with imprecise demand and production preparation time is considered which are characterized as independent fuzzy variables rather than fuzzy numbers as in previous studies. Based on an expected value criterion or a credibility criterion, a fuzzy expected value model (EVM) is constructed. The purpose of the fuzzy EVM is to determine the optimal policy such that the fuzzy expected value of the total cost is minimal. In order to obtain the exact expected value directly, instead of relying on simulation procedure, the results for uncertain variables with uncertainty distribution are exploited by treating them as fuzzy variables with credibility distribution. The mathematical analysis is carried out to compute exact expected values. Numerical study is also provided to demonstrate the contribution of our model.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Show more products
Literature
1.
go back to reference Chang SC (1999) Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number. Fuzzy Sets Syst 107:37–57MATHCrossRef Chang SC (1999) Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number. Fuzzy Sets Syst 107:37–57MATHCrossRef
2.
go back to reference Chang SC, Yao JS, Lee HM (1998) Economic reorder point for fuzzy backorder quantity. Eur J Oper Res 109:183–202MATHCrossRef Chang SC, Yao JS, Lee HM (1998) Economic reorder point for fuzzy backorder quantity. Eur J Oper Res 109:183–202MATHCrossRef
3.
go back to reference Chen SH, Hsieh CH (1999) Optimization of fuzzy simple inventory models, IEEE International Fuzzy System Conference (Seoul, Korea) Proceedings, vol 1, pp 240–244 Chen SH, Hsieh CH (1999) Optimization of fuzzy simple inventory models, IEEE International Fuzzy System Conference (Seoul, Korea) Proceedings, vol 1, pp 240–244
4.
go back to reference Hadly G, Whitin TM (1963) Analysis of inventory systems, Prentice-Hall, Englewood Cliffs Hadly G, Whitin TM (1963) Analysis of inventory systems, Prentice-Hall, Englewood Cliffs
5.
6.
go back to reference Lee HM, Yao JS (1998) Economic production for fuzzy demand quantity and fuzzy production quantity. Eur J Oper Res 109:203–211MATHCrossRef Lee HM, Yao JS (1998) Economic production for fuzzy demand quantity and fuzzy production quantity. Eur J Oper Res 109:203–211MATHCrossRef
8.
go back to reference Liu B (2007) Uncertainty theory, 2nd edn. Springer-Verlag, BerlinMATH Liu B (2007) Uncertainty theory, 2nd edn. Springer-Verlag, BerlinMATH
9.
go back to reference Liu B (2010) Uncertainty theory: a branch of mathematics for modeling human uncertainty. Springer-Verlag, Berlin Liu B (2010) Uncertainty theory: a branch of mathematics for modeling human uncertainty. Springer-Verlag, Berlin
10.
go back to reference Liu B, Liu YK (2001) Expected value of fuzzy variable and fuzzy expected value model. IEEE Trans Fuzzy Syst 12(2):253–262 Liu B, Liu YK (2001) Expected value of fuzzy variable and fuzzy expected value model. IEEE Trans Fuzzy Syst 12(2):253–262
11.
go back to reference Mahapatra NK, Maiti M (2004) Inventory model for breakable items with uncertain setup time. Tamsui Oxford J Manag Sci 20(2):83–102MathSciNetMATH Mahapatra NK, Maiti M (2004) Inventory model for breakable items with uncertain setup time. Tamsui Oxford J Manag Sci 20(2):83–102MathSciNetMATH
12.
go back to reference Shah Nita H, Shukla Kunal T (2010) Optimal production schedule in declining market for an imperfect production system. Int J Mach Learn Cybern 1(1–4):89–99 Shah Nita H, Shukla Kunal T (2010) Optimal production schedule in declining market for an imperfect production system. Int J Mach Learn Cybern 1(1–4):89–99
13.
go back to reference Tersine KD (1982) Principles of inventory and materials management, New York, North-Holland Tersine KD (1982) Principles of inventory and materials management, New York, North-Holland
15.
go back to reference Wang X, Tang W, Zhao R (2007) Fuzzy economic order quantity inventory models without backordering. Tsinghua Sci Technol 12:91–96MATHCrossRef Wang X, Tang W, Zhao R (2007) Fuzzy economic order quantity inventory models without backordering. Tsinghua Sci Technol 12:91–96MATHCrossRef
16.
go back to reference Xue F, Tang W, Zhao R (2008) The expected value of function of a fuzzy variable with a continuous membership function. Comput Math Appl 55:1215–1224MathSciNetMATHCrossRef Xue F, Tang W, Zhao R (2008) The expected value of function of a fuzzy variable with a continuous membership function. Comput Math Appl 55:1215–1224MathSciNetMATHCrossRef
17.
go back to reference Yao JS, Chang SC, Su JS (2000) Fuzzy inventory without backorder for fuzzy quantity and fuzzy total demand quantity. Comput Oper Res 27:935–962MATHCrossRef Yao JS, Chang SC, Su JS (2000) Fuzzy inventory without backorder for fuzzy quantity and fuzzy total demand quantity. Comput Oper Res 27:935–962MATHCrossRef
Metadata
Title
Optimal policy for fuzzy expected value production inventory model with imprecise production preparation-time
Authors
Hardik Soni
Nita H. Shah
Publication date
01-12-2011
Publisher
Springer-Verlag
Published in
International Journal of Machine Learning and Cybernetics / Issue 4/2011
Print ISSN: 1868-8071
Electronic ISSN: 1868-808X
DOI
https://doi.org/10.1007/s13042-011-0020-5

Other articles of this Issue 4/2011

International Journal of Machine Learning and Cybernetics 4/2011 Go to the issue

Original Article

Function P-sets