Perception of Geotechnical Risk and Its Impact on Project Performance

Authors : Chris Bridges, Chaminda Gallage, Bo Xia

Published in: Proceedings of the 5th International Conference on Transportation Geotechnics (ICTG) 2024, Volume 3

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The impact of geotechnical risks on projects is often not well understood by non-geotechnical professionals. In many cases, the risks can be underestimated, and on rare occasions grossly overestimated. The impact of failing to appreciate geotechnical risks by non-geotechnical professionals is also highlighted through recent case histories where their poor perception of the risks taken has resulted in poor project outcomes. Therefore, this study aims to gain an understanding of how risks are perceived by these professionals to be able to target geotechnical risk communication more effectively.
Research has been undertaken through interviewing a range of construction professionals to gauge the understanding of geotechnical risk by those who work in the geotechnical field and those in other disciplines. These include those from construction companies, government, and consultancies and cover a broad range of experiences. Views of geotechnical engineers and the profession were obtained as well as the participants' perception of the impacts of geotechnical risks on projects.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
3.
go back to reference Adu ET, Lamptey Puddicombe AD, Okonkwo EJ (2020) Assessment of the characteristic nature of site-related risks in building construction project delivery in the south-south zone of Nigeria. Int J Emerg Technol Adv Eng 10(2): 27–34 Adu ET, Lamptey Puddicombe AD, Okonkwo EJ (2020) Assessment of the characteristic nature of site-related risks in building construction project delivery in the south-south zone of Nigeria. Int J Emerg Technol Adv Eng 10(2): 27–34
8.
go back to reference Albatal AH, Mohammad HH, Abd Elrazik ME (2014) Effect of inadequate site investigation on the cost and time of a construction project. In: 4th international symposium on geotechnical safety and risk, ISGSR 2013, 4 Dec 2013–6 Dec 2013. Taylor and Francis—Balkema, Hong Kong Albatal AH, Mohammad HH, Abd Elrazik ME (2014) Effect of inadequate site investigation on the cost and time of a construction project. In: 4th international symposium on geotechnical safety and risk, ISGSR 2013, 4 Dec 2013–6 Dec 2013. Taylor and Francis—Balkema, Hong Kong
9.
go back to reference Jeyapalan JK (2010) Lessons from an HDD project that was awarded for $ 1.74 million with 90 days to complete that took in excess of $ 6 million and more than 1,000 days. In: Pipelines 2010: climbing new peaks to infrastructure reliability—renew, rehab, and reinvest—Proceedings of the pipelines 2010 conference. American Society of Civil Engineers (ASCE). https://doi.org/10.1061/41138(386)13 Jeyapalan JK (2010) Lessons from an HDD project that was awarded for $ 1.74 million with 90 days to complete that took in excess of $ 6 million and more than 1,000 days. In: Pipelines 2010: climbing new peaks to infrastructure reliability—renew, rehab, and reinvest—Proceedings of the pipelines 2010 conference. American Society of Civil Engineers (ASCE). https://​doi.​org/​10.​1061/​41138(386)13
Metadata
Title
Perception of Geotechnical Risk and Its Impact on Project Performance
Authors
Chris Bridges
Chaminda Gallage
Bo Xia
Copyright Year
2025
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-97-8221-5_28